Powered By Kitlog Pro v2.0
DOUG'S WEB SITE
RV-7
Fuselage
Work Logs Found:
65
Category Work Time:
354 Hours
Date
Hours
Work Log Summary
Details
07-12-2020
2.50
Finishing the Inside of the Cabin
09-03-2018
2.00
Installing Fiberglass Tips
Details
08-25-2018
3.00
Installing Canopy Base Molding Strip
06-24-2018
8.00
Fitting the Empennage
Details
06-10-2018
8.00
Installing Canopy Base Molding Strip
Details
05-05-2018
8.00
Installing Canopy Base Molding Strip
Details
03-18-2018
8.00
Crotch Strap Installation
Details
07-16-2017
4.00
Fitting the Windscreen
Details
07-08-2017
4.00
Fitting the Forward Top Skin
Details
06-05-2017
4.00
Fitting the Rear Skirts
Details
05-10-2017
1.00
Painting the cowling
Details
05-04-2017
2.00
NACA side vent install
Details
11-02-2016
2.00
More fiberglass layup.
10-30-2016
3.00
Fitting the Rear Skirts
Details
08-20-2016
8.00
Fitting the Side Skins
Details
08-13-2016
8.00
Fitting the Windscreen
Details
06-21-2016
8.00
Fitting the Plexiglass Canopy
Details
06-11-2016
4.00
Canopy Cut
Details
01-23-2016
8.00
Fitting the Slider Frame
08-04-2012
4.00
Fitting the Sliding Frame to the Canopy
Details
07-06-2012
4.00
Fitting the Sliding Frame to the Canopy
Details
06-24-2012
8.00
Trimming the Plexiglass Canopy
Details
06-11-2012
4.00
Trimming the Plexiglass Canopy
Details
06-04-2012
6.00
Fitting the Slider Frame
Details
01-14-2012
10.00
Installing Cabin Systems
Details
10-29-2011
8.00
Installing Cabin Systems
Details
10-08-2011
8.00
The Electric Flaps
10-01-2011
4.00
Aft Seat Floors
Details
09-25-2011
4.00
The Baggage Compartment
Details
09-03-2011
4.00
Forward Covers
Details
08-12-2011
2.00
Seat Backs
08-05-2011
2.00
Seat Backs
07-10-2011
2.00
The Baggage Compartment
07-09-2011
8.00
The Baggage Compartment
07-03-2011
8.00
The Baggage Compartment
Details
07-02-2011
3.00
Fitting the F-6111 Ribs
06-20-2011
6.00
Installing the side rails
06-20-2011
2.00
Finishing the Bellcrank Support
06-11-2011
2.00
Drilled the side rails to the longerons.
06-06-2011
8.00
Drilled/deburred and riveted aft deck assembly.
06-05-2011
8.00
Fabricated and primed aft deck angles and spacers.
05-14-2011
1.00
Flipped the canoe!!!
03-27-2011
8.00
Riveting the 'canoe'
10-18-2010
8.00
Continued to dimple / countersink the understructu
10-17-2010
4.00
Dimpled the side skins.
08-28-2010
8.00
Rudder pedal assembly and install.
08-14-2010
4.00
Fabricated and drilled the F-796B reinforcement an
08-13-2010
0.50
Smoothed the edges of the rudder pedals with the s
08-07-2010
8.00
Fabricated and fitted the F-684 gussets.
07-18-2010
4.00
Fabricated, fitted and drilled auxiliary and lower
07-12-2010
4.00
Fitted the firewall and bottom skin.
07-12-2010
4.00
Drilled longerons to side skins.
07-04-2010
3.00
Making the conical bend.
Details
06-30-2010
4.00
Fitting the forward side skins.
06-24-2010
4.00
Notched the longerons for the F-711C bars.
06-24-2010
4.00
Joining the Rear and Center Fuselage Assemblies
Details
06-21-2010
8.00
Preparing the Center Fuselage
06-05-2010
4.00
Riveting the Center Fusalage
04-03-2010
8.00
Beginning to look like a fuselage. Pretty cool!
02-14-2010
8.00
Aft fuselage construction
01-09-2010
6.50
Bending the Longerons
Details
11-09-2009
4.00
Primed all F-705 bulkhead parts
10-31-2009
8.00
F-705 Construction
Details
10-22-2009
8.00
F-705 Building Construction
Details
06-24-2009
20.00
Inventorying the Fuselage kit
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
313
1247
Avionics
15
62
Empennage
75
182
Engine
5
7
Firewall Forward
13
116
Fuselage
65
354
Interior
5
19
Miscellaneous
27
38
None
3
22
Prop
3
16
Systems
2
12
Wings
100
419
Copyright © 2001-2024 Matronics. All Rights Reserved.