KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
Work Logs Found: 21
Category Work Time: 100 Hours
 Date
Hours
Work Log Summary

Details

 09-23-2010
5.00
Windscreen FiberGlass LayUps
Details

 09-22-2010
2.00
Applying the Windscreen tothe Fuselage
Details
     

 09-06-2010
5.00
Installed the Windscreen in Process
Details
       

 09-05-2010
8.00
Final Doors and Rear Transparacies Completed
Details
       

 08-29-2010
6.00
The doors saga continue
Details
       

 08-23-2010
4.00
C-1003 L/R Front Window Gluing with Weld-On
Details
       

 08-20-2010
6.00
hand fitting, hand sanding, and continue sanding (
Details
       

 08-08-2010
10.00
WD-1023 Gas Strut Attach Bracket
Details
       

 07-31-2010
6.00
Cabin Drill Pin Blocks
Details
       

 07-25-2010
2.00
C-1011 L/R Fwd and Aft Latch Pins
Details

 07-18-2010
2.00
Door Handle Assembly with Rack Handles
Details
       

 07-17-2010
2.00
Door Fwd and Aft Pin Block
Details
       

 07-17-2010
1.00
Cutting steel C-rack 10” and Door Assembly
Details

 07-16-2010
3.00
C-656 Canopy Handles
Details

 07-14-2010
2.00
C-1003 L/R Front Windows Transparencies trimmed
Details

 07-13-2010
2.00
Duct taped the door to the fuselage, drilled hinge
Details

 07-12-2010
1.50
Mount the Hinges and Drill the Doors L/R
Details
       

 07-11-2010
14.00
Fitting of the Doors (grinding and sanding and san
Details
       

 07-05-2010
9.00
Aeropoxy Door Shell Together Left and Right
Details
       

 07-04-2010
4.00
Clecoed the C-1002A-L/R Outside Door Shells and C
Details
     

 07-02-2010
5.00
Rough Fitting of the Door Shells
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.