KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
Work Logs Found: 116
Category Work Time: 180 Hours
 Date
Hours
Work Log Summary

Details

 10-21-2014
0.50
Repair Bottom Firewall bulkhead
Details
       

 04-28-2012
2.00
Finishing Firewall
Details
       

 04-21-2012
3.00
Forward Face Firewall Layup
Details
       

 04-15-2012
1.50
Cut Cloth for fwd face of firewall
Details
       

 04-08-2012
2.00
Cut & Sand firewall
Details
       

 03-30-2012
1.00
Flox blind screws into firewall
Details
       

 03-25-2012
1.00
Fit blind screws into firewall
Details
       

 03-18-2012
1.00
Repair Aft Side Firewall glass
Details
       

 03-13-2012
0.50
Prepare for firewall aft face glass repair
Details
     

 03-10-2012
0.50
Epoxy Welding Wire to Blind Screws
Details
       

 02-26-2012
2.00
Finish preparing blind screws and sanding firewall
Details
       

 02-20-2012
0.50
Blind Screw Preparation
Details
       

 02-19-2012
2.00
Blind Screw/Firewall Preparation
Details
       

 02-12-2012
1.00
Prototyping fix for blind screw rotation
Details
       

 02-10-2012
1.50
Drill holes for blind screws in firewall
Details
       

 02-06-2012
1.00
Trim Firewall Aft Face Layup
Details
       

 02-03-2012
3.00
1st firewall layup
Details
       

 02-02-2012
1.00
Cut Cloth for Permanent Firewall
Details
       

 02-01-2012
1.00
Prepare Permanent Firewall for first layup
Details
     

 01-22-2012
1.00
Install Aluminum Inserts in Firewall
Details
     

 01-21-2012
1.00
Apply chrome coating to firewall inserts
Details
       

 12-03-2011
1.50
Cut out permanent firewall pieces
Details
     

 11-26-2011
1.00
Trace Permanent Firewall Pieces
Details
       

 11-20-2011
1.00
Finished Temporary Firewall
Details
     

 11-14-2011
0.50
Fabricate Aluminum Inserts for Firewall
Details
     

 11-13-2011
1.00
Temporary Firewall Fabrication
Details
       

 11-12-2011
1.00
Trace-out Temporary Firewall
Details
       

 11-11-2011
1.00
Bottom Right Side Firewall Template
Details
     

 11-06-2011
1.00
Top Right Side Firewall Template
Details
     

 10-23-2011
0.50
FWD landing gear hardpoint repair
Details
     

 10-22-2011
1.00
Sanded fwd landing gear bulkhead bottom half
Details
       

 10-15-2011
1.50
Finished 2 of the 3 landing gear bulkheads
Details
       

 10-08-2011
1.00
Trimmed 2nd landing gear bulkhead layup
Details
       

 10-01-2011
3.50
Layup aft sides of landing gear bulkheads
Details
       

 09-27-2011
3.00
Cut cloth for 2nd landing gear bulkhead layup
Details
       

 09-11-2011
1.00
Clean Shop and Re-stock
Details

 08-29-2011
1.00
Sanding landing gear bulkhead
Details
     

 08-27-2011
1.50
Trim 1st landing gear bulkheads layups
Details
       

 08-19-2011
3.50
fwd face landing gear bulkhead layups
Details
       

 07-24-2011
1.50
Fwd landing gear bulkhead forward face layup
Details
       

 07-10-2011
3.00
Landing Gear Bulkheads fwd face cloth
Details
       

 07-03-2011
1.50
5-min epoxy hardpoints into landing gear bulkheads
Details
       

 07-02-2011
1.50
Cut out landing gear hardpoints
Details
       

 06-17-2011
0.50
Trace Landing Gear Hardpoints on glass
Details
     

 06-16-2011
3.00
Landing Gear Bulkhead - Hardpoint Layup
Details
       

 06-12-2011
2.00
Cut BID for landing gear hardpoints
Details
       

 06-11-2011
1.00
Landing Gear Hardpoint Layup Preparation
Details
       

 06-07-2011
1.00
Shape aft gear bulkhead foam
Details
       

 05-31-2011
1.00
Upper forward gear bulkhead beveled edges
Details
       

 05-29-2011
1.50
Cut Upper FWD Gear Bulkhead foam
Details
       

 05-23-2011
1.00
Finish tracing gear bulkheads onto foam
Details
       

 05-22-2011
1.00
Cut Lower forward gear bulkhead foam
Details
       

 05-14-2011
0.50
Trace Lower FWD gear bulkhead on foam
Details
       

 05-14-2011
1.00
Cutout landing gear templates
Details
       

 05-13-2011
1.00
Aft Gear Bulkhead template traced
Details
     

 05-12-2011
0.50
Trace lower forward gear bulkhead and hardpoint
Details
       

 05-10-2011
1.00
FWD Gear Bulkhead template tracing
Details
     

 05-07-2011
2.00
Sanding Instrument Panel
Details
       

 05-01-2011
1.00
Cut excess glass off stiffners
Details
       

 04-30-2011
1.00
Fill air gaps in stiffners
Details
       

 04-24-2011
3.00
Instrument Panel Stiffners Bottom Bid Layup
Details
       

 03-27-2011
3.00
Instrument Panel Cloth - bottom/outside of stiffne
Details
     

 02-21-2011
1.00
Sand Instrument Panel Stiffner Layup 1
Details
       

 02-12-2011
2.50
Glass Instrument Panel Stiffners - top/inner sides
Details
       

 02-08-2011
1.00
Instrument Panel cloth cutting for top/inside of s
Details
       

 01-22-2011
1.00
Epoxy Foam Stiffners to Instrument Panel
Details
     

 01-21-2011
1.50
Cut foam for Instrument Panel stiffner ribs
Details
     

 01-20-2011
2.00
Sanding Instrument Panel
Details
     

 01-02-2011
0.50
Instrument Panel Repair
Details
       

 01-01-2011
1.50
Instrument Panel Trim
Details
       

 12-30-2010
2.50
Instrument Panel Forward Face Layup
Details
       

 12-05-2010
2.00
Instrument Panel Fwd Face Layup Preparations
Details
     

 11-28-2010
1.00
Instrument Panel Aft Face Sanding
Details
     

 11-27-2010
0.50
Instrument Panel aft side - trimming
Details
       

 11-26-2010
1.00
Trim outer edge - instrument panel aft side
Details
       

 11-20-2010
3.00
Instrument Panel - aft layup
Details
       

 11-19-2010
2.00
Instrument Panel - Aft Layup Preparations
Details
     

 11-14-2010
2.00
Instrument Panel Foam - final shaping
Details
     

 11-06-2010
2.00
Instrument Panel Foam Shaping - right side
Details
       

 11-05-2010
2.00
Instrument Panel - foam shaping
Details
       

 10-31-2010
1.50
Instrument Panel Paper Templates Traced onto Foam
Details
       

 10-30-2010
1.00
Instrument Panel Foam Pieces
Details
       

 10-29-2010
2.50
Top half of Instrument Panel templates
Details
       

 10-23-2010
3.00
Lower half of instrument panel - template
Details
       

 10-22-2010
1.50
F22 forward face layup cut, sanded, stored
Details
       

 10-17-2010
3.50
F22 forward face layup
Details
       

 10-16-2010
3.50
Cut F22 Forward Face Cloth
Details
       

 10-09-2010
1.50
Clean Hardner from Pump
Details

 09-26-2010
1.00
Clean Shop for F22 forward layup
Details
       

 09-25-2010
0.50
F22 Aft layup sanding
Details
     

 09-24-2010
2.00
F22 aft layup trimming
Details
       

 09-19-2010
3.00
F22 aft layup
Details
       

 09-17-2010
2.00
Cut Cloth for F22 aft layup
Details
       

 09-12-2010
0.50
F22 layup peparations
Details
       

 09-10-2010
1.00
F28 bulkhead - final trim, sand, & store
Details
       

 08-29-2010
1.00
F28 forward face layup
Details
       

 08-28-2010
1.00
F28 aft face trim and sand
Details
       

 08-26-2010
1.50
F28 aft face layup
Details
       

 08-07-2010
0.50
F28 and F22 bulkheads ready for glass
Details
     

 08-05-2010
1.00
Remove excess epoxy from F22 foam
Details
       

 08-02-2010
1.50
Join F22 foam together
Details
       

 08-01-2010
3.00
Shape F22 bulkhead foam
Details
       

 07-25-2010
2.00
Shape F28 and F22 doubler foam
Details
       

 07-24-2010
3.00
F22 & F28 Bulkhead Templates
Details
       

 07-11-2010
0.50
Seatback - fill small air bubbles with epoxy
Details
       

 07-10-2010
1.00
Sanded Seatback
Details
     

 07-09-2010
2.00
Seatback - drilled holes and cut centre slots
Details
       

 07-03-2010
1.50
Seatback - 2nd layup
Details
       

 07-03-2010
2.00
Cut Cloth and Flox for 2nd seatback layup
Details
       

 07-03-2010
0.50
2nd seatback layup - knife trimmed
Details
       

 07-02-2010
2.00
Seatback flox corners
Details
       

 07-01-2010
2.50
Cutting out the seatback slots
Details
       

 06-26-2010
2.50
Sanding first seatback layup
Details
       

 06-25-2010
4.00
Front Seatback 1st layup
Details
       

 06-22-2010
2.00
Prepare front seatback foam
Details
       

 06-20-2010
1.00
Front Seatback Templates
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.