My RV-12 Build Log
Work Logs Found: 156
Category Work Time: 372 Hours
 Date
Hours
Work Log Summary

Details

 11-15-2015
6.00
Riveted Fwd Turtle Deck Skins, painted Roll Bar
Details
       

 11-14-2015
5.00
Re-primed the Roll Bar
Details
       

 09-07-2015
2.00
Riveted holes in Fuselage and Tailcone
Details
       

 09-06-2015
4.00
Riveted Tailcone to Fuselage
Details
       

 09-05-2015
6.00
Replaced bolt in Torque Arm, Clecoed TC to Fuse
Details
       

 08-09-2015
3.00
Installed new fuel lines and tightened fittings
Details
       

 08-08-2015
1.50
Fabricated new fuel line
Details
     

 02-28-2015
3.00
Work on the aft fuel lines and fittings
Details
       

 02-15-2015
2.00
New Bearing Bracket Brace SB
Details
       

 08-20-2013
0.50
Primed and painted Turtle Deck Skins
Details

 08-19-2013
0.50
Deburred Turtle Deck Skins
Details

 07-18-2011
1.50
Installed Oil Tank an Battery Mount Braces
Details
     

 07-16-2011
1.50
Applied new sealant to the Firewall
Details
       

 07-11-2011
0.50
Visit by EAA Tech Counselor
Details

 07-04-2011
0.50
Removed the Upper Fwd Fuse Skin
Details

 07-03-2011
1.00
Trial fit of the Upper Fwd Fuse Skin
Details
       

 07-02-2011
5.00
Prepped the Upper Fwd Fuse Skin & other parts
Details
       

 06-28-2011
1.00
Sealed the Canopy Rib bottoms
Details
     

 06-27-2011
2.00
Riveted Panel Base Assembly & applied sealant
Details
       

 06-26-2011
5.00
Installed nutplates to Panel Base, Canopy Ribs, et
Details
       

 06-25-2011
6.00
Match-drilled holes in Longeron and Strut Angles
Details
       

 06-24-2011
0.50
Trial fit of Panel Base and Canopy Ribs
Details
       

 06-23-2011
1.50
Work on Strut Attach Angle and Canopy Doublers
Details
       

 06-22-2011
1.00
Worked on Strut Attach Angles
Details
       

 06-21-2011
2.00
Countersinked and Dimpled parts
Details
       

 06-20-2011
2.00
Prepared upper fuse parts
Details
     

 06-19-2011
1.00
Installed Mid Cowl Hinges and Skin Stiffeners
Details
       

 06-18-2011
2.50
Prepped Mid Cowl Hinges and Fwd Skin Stiffeners
Details
       

 06-15-2011
2.00
Riveted Firewall Upper to the Firewall Shelf
Details
       

 06-14-2011
2.00
Riveted the Cowl Hinges to the Doubler
Details
       

 06-13-2011
2.00
Match-drilled Cowl Hinges
Details
       

 06-12-2011
5.00
Woked on Firewall Upper
Details
       

 06-11-2011
3.50
Put brass insert in brake line & moved airplane pa
Details
       

 06-07-2011
1.50
Installed fittings to brake lines
Details
     

 05-30-2011
2.00
Made the Fuel Return Line Fwd
Details
       

 05-29-2011
2.00
Made the F-1259H Fuel Return Line Aft
Details
       

 05-27-2011
1.00
Redid the F-1259E Fuel Line
Details
       

 05-26-2011
0.50
Repositioned the brake lines in the tunnel
Details

 05-25-2011
1.00
Fabricated the Fuel Line Pump-Valve
Details
       

 05-24-2011
0.50
Installed Bulkhead Fitting.
Details
     

 05-22-2011
2.00
More fuel line work
Details
       

 05-21-2011
4.00
Worked on fuel lines, gascolator & fuel flow meter
Details
       

 05-19-2011
2.00
Worked on Fuel Valve parts
Details
       

 05-18-2011
2.00
Work on Fuel System parts
Details
       

 05-15-2011
4.00
Made the Main and Reservoir Brake Lines
Details
       

 05-14-2011
2.00
Installed the brass elbows to the master cylinders
Details
       

 05-13-2011
1.50
Prepared brake lines
Details
       

 05-10-2011
2.00
Installed Rudder Pedal Assembly to Firewall Shelf
Details
       

 05-09-2011
5.00
Worked on Rudder Pedal Assembly
Details
       

 05-08-2011
1.00
Started work on the Rudder Pedal & Brake System
Details
       

 05-01-2011
1.00
Painted the Seatback Assemblies
Details
     

 04-30-2011
2.50
Riveted the other Seatback Assembly
Details
       

 04-29-2011
1.00
Primed Seatback parts and did some riveting
Details
       

 04-28-2011
1.50
Riveted one Seatback
Details
       

 04-27-2011
1.50
Primed the Seatback parts
Details
       

 04-26-2011
2.00
Made more Seatback Hinges
Details
       

 04-25-2011
1.50
Fabricated Seatback Hinges
Details
       

 04-23-2011
2.00
Prepared Seatback parts
Details
       

 04-21-2011
0.50
Riveted left Support Frame
Details
       

 04-20-2011
2.00
Riveted Bulkhead Assembly and Roll Bar Brace
Details
       

 04-19-2011
2.00
Riveted Baggage Bulkheads Assembly
Details
       

 04-18-2011
0.50
Painted Bulkheads and Attach Angle
Details

 04-17-2011
1.50
Match-drilled the Shear Clips
Details
       

 04-16-2011
2.00
Installed Cockpit Light and riveted Roll Bar
Details
       

 04-14-2011
1.50
Painted the Roll Bar Assembly
Details
       

 04-13-2011
0.50
Installed Roll Bar Braces and spliced cockpit wire
Details
     

 04-10-2011
4.00
Riveted the Roll Bar Assembly
Details
       

 04-09-2011
6.00
Work on Roll Bar Assembly parts
Details
       

 04-07-2011
1.00
Attached Roll Bar Bases
Details
     

 04-05-2011
1.50
Countersinked holes in the Roll Bar Frames
Details
     

 04-04-2011
1.00
Worked on the baggage bulkheads and angles
Details

 03-30-2011
1.00
More deburring of Roll Bar parts.
Details

 03-29-2011
1.50
Deburred Roll Bar parts
Details

 03-28-2011
3.00
Final-drilled holes in the Roll Bar Frames
Details
       

 03-26-2011
1.50
Started work on Roll Bar Assembly
Details

 03-20-2011
2.00
Riveted Lwr Cowl Hinges
Details
       

 03-19-2011
9.00
Fabricated Vent parts and cowl hinges
Details
       

 03-17-2011
2.50
Riveted right Fuse Side Skin and other parts
Details
       

 03-16-2011
1.50
Worked on the right side of fuselage
Details
       

 03-15-2011
1.00
Prepped the Skin Stiffeners
Details

 03-13-2011
2.00
Finished riveting left Fuse Side Skin
Details
     

 03-12-2011
5.00
Painted Fuse Skins and inside of Fuselage
Details
       

 02-26-2011
5.00
More prep work on the Fuselage Side Skins
Details
       

 02-25-2011
9.00
Fuse Side Skins prep and Longeron match-drilling
Details
       

 02-24-2011
1.50
Riveted Bulkhead Side Channels
Details
       

 02-21-2011
3.00
Primed Arm Rests, Bulkhead Side Channels, etc
Details
       

 02-20-2011
1.50
Prepped Fuselage parts
Details

 02-19-2011
8.00
Match-drilled Longerons and worked on other parts
Details
       

 02-15-2011
1.50
More work on the Right Longeron
Details
     

 02-14-2011
1.00
Work on Right Longeron
Details

 02-12-2011
1.50
Continued work on the Left Longeron
Details
       

 02-07-2011
1.50
Work on the Left Longeron
Details

 01-29-2011
2.50
Joined the Fwd Fuse and Mid Fuse Assemblies
Details
       

 01-24-2011
1.50
Installed the System Block Studs to the Bottom Ski
Details
     

 01-20-2011
6.00
Installed the Firewall Shelf and Flo-Scan Bracket
Details
       

 01-17-2011
1.00
Riveted Cowl Attach Plates to the Fuse Assembly
Details
     

 01-16-2011
3.00
Riveted the Firewall Bottom and Fwd Fuse Skins
Details
       

 01-15-2011
8.00
Work on Fwd Lower Fuselage Tunnel Assembly
Details
       

 01-13-2011
0.50
Tried to install systems block studs
Details

 01-12-2011
1.50
Riveted Autopilot Servo Brackets and Angles
Details
       

 01-10-2011
4.00
Riveted Step Angles and Bulkhead
Details
       

 01-09-2011
1.00
Match-drilled holes for the Left Step
Details
       

 01-02-2011
2.50
Prepped Fwd Lower Fuselage parts
Details
       

 01-01-2011
2.00
Prepped Fwd Lower Fuselage parts
Details
       

 12-31-2010
0.50
Located fuselage parts
Details

 12-26-2010
3.00
Match-drilled the Step Attach Angles
Details
       

 12-24-2010
2.00
Completed riveting the Bottom Skin
Details
       

 12-23-2010
4.00
Riveted Doublers, Stiffeners and Bottom Skin
Details
       

 12-22-2010
2.00
Removed the Vinyl film around the rivet holes
Details

 12-21-2010
1.00
Clecoed Bottom Skin, Doublers and Stiffeners
Details
     

 12-20-2010
2.00
Riveted the Corner Skins and Nutplates
Details
       

 12-19-2010
2.00
Prepped Bottom Skin
Details
     

 12-18-2010
3.00
Riveted Step Ribs and Corner Skins
Details
       

 12-17-2010
1.00
Installed the Control Column
Details
       

 12-13-2010
2.00
Riveted Seat Ramp Floors
Details
       

 12-12-2010
5.00
More parts preparation and priming
Details
       

 12-11-2010
7.00
More fuselage parts preparation
Details
       

 12-10-2010
1.50
Dimpled and final-drilled holes in Floor Ramps
Details
       

 12-09-2010
1.50
Riveted Bulkhead to the Seat Ribs
Details
       

 12-08-2010
1.50
Installed nutplates and riveted Bulkhead Doublers
Details
       

 12-07-2010
2.00
Riveted Doublers and Control Assembly to Bulkhead
Details
       

 12-06-2010
1.50
Assembled the Control Column Mounts
Details
       

 11-30-2010
0.50
Primed parts
Details

 11-29-2010
3.00
Prepped Control Column Mt Assembly and Bulkhead
Details
       

 11-28-2010
1.50
Riveted Fwd Bulkhead Side Assemblies
Details
       

 11-26-2010
4.00
Riveted Seat Floor Assemblies to the Bulkhead
Details
       

 11-25-2010
4.00
Riveted Seat Floors and Nutplates
Details
       

 11-24-2010
1.50
Prepared fuselage parts
Details
     

 11-23-2010
2.00
Installed Seatback Hinges and nutplates
Details
       

 11-22-2010
1.00
Primed Seat Floors and hinges
Details
     

 11-21-2010
6.00
Riveted Crotch Brackets with Seat Rib Assemblies
Details
       

 11-20-2010
4.50
Riveted Bracket Assemblies to Seat Ribs
Details
       

 11-19-2010
1.50
Prepped Autopilot Servo Bracket parts
Details
       

 11-18-2010
2.00
Preparation of Seat Ribs and other parts
Details
     

 11-17-2010
2.00
Final-drilled Seat Ribs and Attach Lugs
Details
       

 11-16-2010
2.00
Seat Ribs preparation
Details
     

 11-15-2010
2.00
Completed Bracket Assemblies
Details
       

 11-14-2010
6.00
Riveted Bulkhead, Baggage Floors and Ribs
Details
       

 11-13-2010
5.00
Prepared Rear Spar Receptacles, Brackets & Ribs
Details
       

 11-12-2010
2.50
Riveted the Baggage Ribs
Details
       

 11-11-2010
2.00
Completed prepping the Baggage Ribs
Details
     

 11-09-2010
2.00
Replaced 2 rivets and deburred parts
Details

 11-08-2010
2.50
Riveted Baggage Floors to Bulkhead
Details
       

 11-07-2010
3.00
Installed Skin Stiffeners
Details
       

 10-26-2010
0.50
Finished riveting the Center Section Aft Bulkhead
Details

 10-25-2010
2.00
Riveted the Bulkhead Assembly
Details
       

 10-24-2010
2.00
Primed parts and installed Skin Attach Flanges
Details
       

 10-23-2010
3.00
Match-drilled and countersunk holes
Details
       

 10-22-2010
1.50
Match-drilled holes in the Center Section Assembly
Details
     

 10-21-2010
1.50
Match-drilling of Center Section
Details
       

 10-20-2010
1.00
Separated Skin Stiffeners and Skin Attach Flanges
Details
     

 10-19-2010
1.50
Countersunk holes and installed nutplates
Details
       

 10-18-2010
1.00
Located and separated parts and hardware
Details
       

 10-17-2010
1.00
Organize Fuselage parts
Details
       

 06-16-2010
2.00
Parts inventory
Details
       

 06-14-2010
1.00
Started Fuselage Kit inventory
Details
       