Powered By Kitlog Pro v2.0
BRANDEN'S WEB SITE
RV-8
Empennage - Horiz. Stab
Work Logs Found:
21
Category Work Time:
26 Hours
Date
Hours
Work Log Summary
Details
03-11-2011
1.00
Primed HS skins
Details
07-25-2010
2.00
Prepaired and Primed Left HS skeleton
Details
07-05-2010
0.50
Dimpled the HS spars with a Pneumatic sqeezer
Details
07-05-2010
0.50
Deburred HS skin edges with die grinder
Details
07-05-2010
0.50
Botched attempt at Alodine
Details
07-04-2010
2.00
Dimpled HS skins with C-Frame/squeezer
Details
07-03-2010
0.50
Deburred the right HS spars/ribs
Details
07-03-2010
2.00
Deburred HS skins
Details
07-01-2010
3.00
Prepaired HS-404/405 Right side
Details
07-01-2010
1.00
Match drilled Right skin with #41 reamer
Details
06-22-2010
2.00
Match Drilled Right HS skeleton #30
Details
06-14-2010
1.00
Drilled Left HS-405 to skin
Details
06-13-2010
3.00
Prep'd the HS ribs
Details
06-12-2010
2.00
Started on the front spar assembly
Details
06-12-2010
0.50
Drilled HS-411 assembly to #12
Details
06-11-2010
0.50
Riveted the HS-411/VA-146 assembly
Details
06-11-2010
0.50
Match drilled hinge brackets
Details
06-11-2010
0.50
Match drill HS-411PP/VA-146 bearing
Details
06-11-2010
0.50
Front spar-match drill splice/reinforcement angels
Details
06-08-2010
2.00
Smoothed surface of HS-609PP and match drilled
Details
06-07-2010
0.50
Prep'd HS-609PP reinforcement bars
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
67
91
Empennage - Elevator
17
20
Empennage - Horiz. Stab
21
26
Empennage - Rudder
15
24
Empennage - Vertical Stab
9
18
Miscellaneous
2
2
Non-Building Events
3
1
Copyright © 2001-2024 Matronics. All Rights Reserved.