Powered By Kitlog Pro v2.0
Patto Web Site
Lightning
Engine
Work Logs Found:
46
Category Work Time:
170 Hours
Date
Hours
Work Log Summary
Details
03-21-2014
3.00
Final WOT static engine test.
Details
01-29-2014
6.00
Fuel line re-routing and testing.
Details
01-24-2014
3.00
Hunting low fuel pressure fault.
Details
01-23-2014
1.00
Tidying engine bay
Details
01-20-2014
2.00
More work on the engine miss - with success.
Details
01-18-2014
3.00
Hunting for the engine miss ...
Details
11-08-2013
2.00
Replacing the ram air duct rubber baffles
Details
10-22-2013
2.00
Filling and priming the oil system.
Details
10-21-2013
3.00
Fuel flow sender leak - panel remove
Details
06-21-2013
2.00
Fitting ground adjustable prop & spinner step 1
Details
04-07-2012
5.00
Preparation of the final panel.
Details
04-06-2012
8.00
Wiring engine & passing cables through firewall.
Details
03-31-2012
4.00
Fitting cable glands to pass cables through the fi
Details
03-30-2012
4.00
Connecting Dynon sensor cables.
Details
03-04-2012
2.50
Labeling CHT & EGT sensors.
Details
02-26-2012
4.00
Oil cooler hoses - completion.
Details
02-25-2012
2.50
Making up oil cooler oil hoses.
Details
02-08-2012
1.00
Recutting the thread on the fuel pressure sender.
Details
02-05-2012
2.50
Fitting the fuel flow meter.
Details
02-03-2012
4.00
Cutting and fitting scat tubing
Details
12-18-2011
5.00
Making bus bars.
Details
12-17-2011
3.00
Making up bus bars.
Details
12-16-2011
5.00
Throttle quadrant and cable holder
Details
12-15-2011
3.00
Cable glands
Details
11-12-2011
3.00
Fitting cables and routing wiring.
Details
11-11-2011
4.00
Connecting bowden cables.
Details
10-09-2011
6.00
Fitting scat tube and CHT sensors and ram aid duct
Details
10-08-2011
3.00
General & Fitting Dynon EGT Sensors
Details
10-07-2011
1.50
Fuel valve sealing
Details
10-01-2011
3.00
Modifying and fitting the exhaust heat exchange mu
Details
09-17-2011
3.00
Ram Air Ducts
Details
07-31-2011
1.50
Replacing the longer temp engine bolts with the co
Details
07-30-2011
1.00
Refitting engine.
Details
07-29-2011
5.00
Final fit of firewall and engine mount.
Details
07-28-2011
2.00
Preparing firewall for install.
Details
12-12-2010
13.00
Building up firewall with attached components.
Details
11-21-2010
4.00
Removing engine & general work
Details
11-19-2010
4.00
Coil cooling ducts
Details
11-18-2010
2.50
Ram Air Ducts - first trim & fit
Details
11-12-2010
4.00
Making up the alloy oil pan cooling duct.
Details
11-06-2010
8.00
Making the optional oil pan fin cooler.
Details
09-28-2010
1.50
First fit of the oil cooler and ducting.
Details
09-25-2010
6.00
More filling & sanding - oil cooler prep work.
Details
09-04-2010
6.00
More work front wheel fairing + making up hinges f
Details
06-09-2010
2.00
Making clamp to compress rubber mounts to get engi
Details
06-05-2010
6.00
Prep & mounting of engine.
Details
SITE NAVIGATION
Contact Builder
Lightning Home
Category
# Logs
# Hours
All
378
1385
Avionics
35
165
Empennage
34
104
Engine
46
170
Fuselage
92
319
Miscellaneous
131
449
None
1
0
Prop
2
4
Wings
37
174
Copyright © 2001-2024 Matronics. All Rights Reserved.