KitLog pro

Powered By Kitlog Pro v2.0

Patto Web Site
Work Logs Found: 46
Category Work Time: 170 Hours
 Date
Hours
Work Log Summary

Details

 03-21-2014
3.00
Final WOT static engine test.
Details
       

 01-29-2014
6.00
Fuel line re-routing and testing.
Details
       

 01-24-2014
3.00
Hunting low fuel pressure fault.
Details
       

 01-23-2014
1.00
Tidying engine bay
Details
       

 01-20-2014
2.00
More work on the engine miss - with success.
Details
       

 01-18-2014
3.00
Hunting for the engine miss ...
Details
       

 11-08-2013
2.00
Replacing the ram air duct rubber baffles
Details
       

 10-22-2013
2.00
Filling and priming the oil system.
Details
       

 10-21-2013
3.00
Fuel flow sender leak - panel remove
Details
       

 06-21-2013
2.00
Fitting ground adjustable prop & spinner step 1
Details
       

 04-07-2012
5.00
Preparation of the final panel.
Details
       

 04-06-2012
8.00
Wiring engine & passing cables through firewall.
Details
       

 03-31-2012
4.00
Fitting cable glands to pass cables through the fi
Details
       

 03-30-2012
4.00
Connecting Dynon sensor cables.
Details
       

 03-04-2012
2.50
Labeling CHT & EGT sensors.
Details
       

 02-26-2012
4.00
Oil cooler hoses - completion.
Details
       

 02-25-2012
2.50
Making up oil cooler oil hoses.
Details
       

 02-08-2012
1.00
Recutting the thread on the fuel pressure sender.
Details
       

 02-05-2012
2.50
Fitting the fuel flow meter.
Details
       

 02-03-2012
4.00
Cutting and fitting scat tubing
Details
       

 12-18-2011
5.00
Making bus bars.
Details
       

 12-17-2011
3.00
Making up bus bars.
Details
       

 12-16-2011
5.00
Throttle quadrant and cable holder
Details
       

 12-15-2011
3.00
Cable glands
Details
       

 11-12-2011
3.00
Fitting cables and routing wiring.
Details
       

 11-11-2011
4.00
Connecting bowden cables.
Details
       

 10-09-2011
6.00
Fitting scat tube and CHT sensors and ram aid duct
Details
       

 10-08-2011
3.00
General & Fitting Dynon EGT Sensors
Details
       

 10-07-2011
1.50
Fuel valve sealing
Details
     

 10-01-2011
3.00
Modifying and fitting the exhaust heat exchange mu
Details
       

 09-17-2011
3.00
Ram Air Ducts
Details
       

 07-31-2011
1.50
Replacing the longer temp engine bolts with the co
Details
       

 07-30-2011
1.00
Refitting engine.
Details
       

 07-29-2011
5.00
Final fit of firewall and engine mount.
Details
       

 07-28-2011
2.00
Preparing firewall for install.
Details
       

 12-12-2010
13.00
Building up firewall with attached components.
Details
       

 11-21-2010
4.00
Removing engine & general work
Details
       

 11-19-2010
4.00
Coil cooling ducts
Details
       

 11-18-2010
2.50
Ram Air Ducts - first trim & fit
Details
       

 11-12-2010
4.00
Making up the alloy oil pan cooling duct.
Details
       

 11-06-2010
8.00
Making the optional oil pan fin cooler.
Details
       

 09-28-2010
1.50
First fit of the oil cooler and ducting.
Details
       

 09-25-2010
6.00
More filling & sanding - oil cooler prep work.
Details
       

 09-04-2010
6.00
More work front wheel fairing + making up hinges f
Details
       

 06-09-2010
2.00
Making clamp to compress rubber mounts to get engi
Details
       

 06-05-2010
6.00
Prep & mounting of engine.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.