KitLog pro

Powered By Kitlog Pro v2.0

Barrys RV-9A Project
Work Logs Found: 74
Category Work Time: 158 Hours
 Date
Hours
Work Log Summary

Details

 03-20-2013
2.25
Reinstalled roll servo after reversing wires to re

 01-23-2013
1.00
Installed safety wire

 01-22-2013
2.00
Installed flaps

 01-21-2013
2.75
Installed aiteron control stops.

 01-20-2013
2.50
Installed wing tips, connected directional lights.

 01-18-2013
2.75
Installed ailerons.

 01-07-2013
2.50
Completed the wing installation including torquein

 01-05-2013
5.00
Installed wings on the airplane.

 08-19-2012
1.50
Continued working on wing root fairing.

 08-18-2012
1.25
Worked on fitting wing to fuselage fairing.

 08-14-2012
2.00
Finished tank attach brackets. drilled holes in ov

 08-13-2012
3.50
Worked on wing attach brackets.

 08-12-2012
4.00
Set and drilled the wing angle of incidence. fabri

 08-11-2012
5.00
Attached wings to the fusalage.

 07-18-2012
2.00
Finished filling and priming the fiberglass wing t

 07-16-2012
2.25
Finished sanding and primed the wing tips.

 07-15-2012
1.00
Sanded the wing tips.

 03-14-2012
1.50
Finished installing wing tip lights and wiring.

 03-13-2012
1.50
Finished priming and installing wing tip frames

 03-12-2012
1.50
Fitted, primed and epoxied final wing tip frames i

 03-11-2012
3.50
Fitted and installed wing tip frame, fitted other

 03-10-2012
2.00
Finished installing nut plates in the wing tips.

 03-09-2012
1.25
Machined wing tips

 03-06-2012
1.50
Fitted and drilled right fiberglass wingtip to the

 03-05-2012
1.00
Fitted fiberglass wing tips to wings

 03-03-2012
1.25
Finished mpunting wingtip directional/strobe light

 03-01-2012
1.50
Mounted wingtip direction/strobe lights

 02-29-2012
1.50
Finished mounting wingtip lens covers

 02-28-2012
2.50
Fitted wingtip light lens covers

 07-08-2011
0.75
Autopilot servo installation in the right wing
     

 08-24-2010
2.00
Finished the lower skin riveting
Details
       

 08-23-2010
0.50
Right wing, lower skin riveting

 08-22-2010
2.00
Right wing riveting
Details
       

 08-21-2010
1.50
Bottom skin, right wing riveting

 08-19-2010
2.00
Left wing bottom skin riveting
     

 08-18-2010
2.25
Left wing bottom skin riveting
     

 08-17-2010
0.75
Dimpled frames for bottom skin oin the left wing

 08-05-2010
1.50
Countersinking on upper wing spar

 08-04-2010
1.50
Wings
Details
     

 08-03-2010
3.25
Wings
Details
       

 08-02-2010
3.00
left wing skin
Details
     

 08-01-2010
4.00
Bottom skins
Details
     

 07-31-2010
3.00
Pitot tube
Details
     

 07-30-2010
2.00
Attached and adjusted right aileron
     

 07-29-2010
2.00
Left aileron installation

 07-23-2010
0.50
Aileron flaps

 07-21-2010
0.50
Attached inboard aileron brackets
     

 07-15-2010
2.00
Aileron mounting brackets
Details
       

 07-14-2010
2.00
Finished and installed last aileron pushrod

 07-13-2010
1.50
Interior wing work
Details

 07-12-2010
1.50
Left wing bellcrank assembly
Details
       

 07-11-2010
2.00
Assembled the pushrod bellcrank assembly
       

 07-10-2010
4.50
Pushrod bellcrank assembly
Details
       

 07-09-2010
2.00
Finished riviting the flap gap fairings
     

 07-08-2010
2.50
Riviting on flap and aileron gap fairings

 07-08-2010
4.50
Conduit, wiring
Details
       

 07-07-2010
3.00
Aileron and flap gap fairings.
Details
       

 07-06-2010
3.00
Machining aileron and flap gap fairings

 06-28-2010
1.50
Conduit bracket install
Details
       

 06-27-2010
2.50
Conduit brackets
Details
       

 06-26-2010
2.50
Conduit bracket
Details
     

 06-24-2010
2.50
AOA Sensor Installation
Details
       

 06-22-2010
1.50
Completed landing light
Details
       

 06-21-2010
2.00
Landing light
Details
       

 06-20-2010
4.00
Landing light
Details
       

 06-17-2010
3.00
Aileron brackets
Details
       

 06-15-2010
2.00
Aileron brackets
Details
       

 06-09-2010
2.00
Aileron mounting brackets
Details

 06-06-2010
2.00
Finished attaching fuel sender
Details
     

 06-05-2010
2.00
Installed the fuel pickup tube
Details

 06-04-2010
1.50
Assembled the fuel pickup tube
Details

 06-02-2010
2.00
Fuel sender
Details
     

 06-01-2010
1.00
Removed the fuel sender units from the boxes. Pour

 05-30-2010
0.50
Washed oil off of wings










Copyright © 2001-2024 Matronics. All Rights Reserved.