Date
|
Hours
|
Work Log Summary
|
Details
|
02-24-2013
|
2.75
|
Painted horizontal stabilizer access panel.
|
|
|
|
01-08-2013
|
2.50
|
Installed fuel vent lines.
|
|
|
|
08-17-2012
|
1.75
|
Finished holes in fuselage for flap brackets.
|
|
|
|
08-16-2012
|
3.25
|
Cut holes in fuselage for flap arms.
|
|
|
|
08-01-2012
|
2.00
|
Installed and hooked up the main control rod to th
|
|
|
|
07-31-2012
|
2.25
|
Finished running and supporting the elevator trim
|
|
|
|
07-29-2012
|
1.25
|
Finished running the elevator trim cable.
|
|
|
|
01-26-2012
|
2.00
|
Fitted cockpit side cover, primed and painted.
|
|
|
|
01-12-2012
|
1.00
|
Installed ADSB antenna
|
|
|
|
06-20-2011
|
2.25
|
Landing gear, wheel pants
|
|
|
|
05-31-2011
|
1.50
|
Primed, finished constructing manual aileron trim.
|
|
|
|
05-30-2011
|
2.00
|
Manual aileron trim control
|
|
|
|
05-03-2011
|
2.00
|
Waiting for engine, started on wheels and brakes
|
|
|
|
02-23-2011
|
2.50
|
Side steps, side skirts
|
Details
|
|
|
02-22-2011
|
2.50
|
Side steps
|
Details
|
|
|
02-21-2011
|
0.75
|
Deburred side step rivet holes and mounting hole
|
|
|
|
02-20-2011
|
3.50
|
External side step
|
|
|
|
02-19-2011
|
2.25
|
Worked on the external side step
|
|
|
|
12-29-2010
|
1.50
|
Finished riveting the forward top skin
|
|
|
|
12-27-2010
|
2.25
|
Riveting the forward top skin
|
Details
|
|
|
12-26-2010
|
3.00
|
Fitted 643 canopy brace, fitted forward top skin
|
|
|
|
12-25-2010
|
3.25
|
Fitted and installed WD-641 canopy roll bar
|
|
|
|
12-23-2010
|
6.50
|
Finish kit,started fitting the WD-641
|
Details
|
|
|
12-21-2010
|
1.25
|
Finished crotch strap installation
|
|
|
|
12-20-2010
|
1.25
|
Drilled, dimpled, etched and primed crotch strap B
|
|
|
|
12-18-2010
|
4.00
|
Finish brake lines, fuel vent line installation
|
|
|
|
12-15-2010
|
1.75
|
F793 vent brackets and SV-2 adaptor
|
|
|
|
12-14-2010
|
1.50
|
721 C&D attach angles
|
Details
|
|
|
12-04-2010
|
3.25
|
Forward fusalage assembly
|
Details
|
|
|
12-02-2010
|
1.75
|
Installed nutplates on forward fusalage
|
Details
|
|
|
12-01-2010
|
2.00
|
Forward Fusalage
|
Details
|
|
|
11-30-2010
|
2.00
|
Forward skin, attach angles.
|
Details
|
|
|
11-29-2010
|
1.50
|
Forward fusalage, fitting forward skin
|
|
|
|
11-28-2010
|
0.75
|
Forward fusalage assembly
|
|
|
|
11-27-2010
|
5.25
|
Forward fusalage
|
Details
|
|
|
11-26-2010
|
4.25
|
Brakes, vent lines
|
Details
|
|
|
11-25-2010
|
2.50
|
Installed control column pushrod, brakes.
|
Details
|
|
|
11-22-2010
|
1.50
|
Installed control column and elevator pushrod
|
|
|
|
11-21-2010
|
3.50
|
Control column/stick assembly
|
Details
|
|
|
11-20-2010
|
2.50
|
Cleaned etched and primed Pushrods
|
Details
|
|
|
11-18-2010
|
1.75
|
Pitch autopilot, SV-1 vent installation
|
Details
|
|
|
11-17-2010
|
2.00
|
Autopilot servo installation
|
Details
|
|
|
11-16-2010
|
1.25
|
Modified the bellcrank to accept the pitch servo
|
|
|
|
11-15-2010
|
1.25
|
Painted, started autopilot
|
Details
|
|
|
11-12-2010
|
2.50
|
Aft skin riveting. aft skin reinforcing rib
|
Details
|
|
|
11-11-2010
|
1.00
|
6111 aft skin reinforcing rib
|
Details
|
|
|
11-10-2010
|
1.75
|
6111 afte skin reinforcing rib, SV-1 vent
|
Details
|
|
|
11-08-2010
|
1.75
|
Fit the vent inlet to the fusalage
|
|
|
|
11-06-2010
|
4.50
|
7129 ELT bracket, Pitot static tube, rudder cables
|
Details
|
|
|
11-05-2010
|
2.25
|
Landing gear mounts, 7129 ELT bracket
|
Details
|
|
|
11-03-2010
|
2.00
|
Mounting landing gear mounts
|
Details
|
|
|
10-24-2010
|
2.25
|
Finished landing gear
|
Details
|
|
|
10-22-2010
|
1.75
|
Fitting landing gear bracket
|
|
|
|
10-20-2010
|
2.25
|
Landing gear
|
Details
|
|
|
10-19-2010
|
2.00
|
Fit landing gear bracket to landing gear
|
|
|
|
10-18-2010
|
1.50
|
Primed and installed the flap actuator covers
|
|
|
|
10-17-2010
|
2.00
|
Mounted the flap actuator motor
|
|
|
|
10-16-2010
|
2.75
|
Flap actuator channel
|
Details
|
|
|
10-15-2010
|
3.00
|
Mounted the flap actuator assembly
|
|
|
|
10-13-2010
|
2.00
|
Manufactured misc. parts for the flap actuator
|
|
|
|
10-12-2010
|
1.75
|
982, Electric flaps
|
Details
|
|
|
10-11-2010
|
1.75
|
Primed and fitted 982 heat baffle assembly
|
|
|
|
10-10-2010
|
2.00
|
Fit the 982 heat baffle assembly.
|
Details
|
|
|
10-08-2010
|
2.50
|
Machined 982 heat baffle and assoc. parts
|
|
|
|
10-07-2010
|
1.50
|
Assembled the seats
|
|
|
|
10-06-2010
|
1.50
|
Primed all seat parts
|
|
|
|
10-05-2010
|
1.50
|
Wash and etched seat parts
|
|
|
|
10-04-2010
|
1.75
|
Drilling, deburring seats
|
|
|
|
10-03-2010
|
1.50
|
Drilling, deburring seat parts
|
|
|
|
10-02-2010
|
6.00
|
Machineing pieces for the seats
|
|
|
|
09-30-2010
|
1.00
|
Finished the tunnel cover between the seats
|
|
|
|
09-29-2010
|
1.00
|
Misc work on the inside of the fuselage
|
|
|
|
09-28-2010
|
2.00
|
Deburred and dimpled 7112 top skin and frames
|
|
|
|
09-25-2010
|
4.25
|
Seat bottoms
|
Details
|
|
|
09-24-2010
|
1.00
|
Prepared seat bottoms for installation
|
|
|
|
09-23-2010
|
2.00
|
Baggage area
|
Details
|
|
|
09-22-2010
|
2.00
|
Baggage area
|
Details
|
|
|
09-21-2010
|
2.00
|
Rear baggage compartment floor
|
|
|
|
09-20-2010
|
2.25
|
F7112 top skin fitting
|
|
|
|
09-19-2010
|
4.50
|
Rudder/brake assembly
|
Details
|
|
|
09-16-2010
|
1.00
|
Fitting rudder/brake assembly
|
|
|
|
09-12-2010
|
2.00
|
Rudder and brake assembly
|
|
|
|
09-11-2010
|
3.50
|
Started fabricating the brake/rudder assembly
|
|
|
|
09-09-2010
|
2.00
|
Started brake/rudder assembly
|
|
|
|
09-07-2010
|
2.00
|
Finished installling and riveting the 712 bulkhead
|
|
|
|
09-06-2010
|
6.50
|
F635 Bellcrank, 712 bulkhead
|
Details
|
|
|
09-05-2010
|
2.00
|
Finished the 705 assembly
|
|
|
|
09-02-2010
|
0.75
|
Primed 705 bulkhead parts
|
|
|
|
09-01-2010
|
1.50
|
Misc fuselage work
|
Details
|
|
|
08-31-2010
|
2.00
|
Misc work on the 905 bulkhead
|
|
|
|
08-30-2010
|
2.00
|
Misc work on the 905 bulkhead
|
|
|
|
08-28-2010
|
2.50
|
fuselage work
|
Details
|
|
|
08-26-2010
|
3.50
|
Riveted on the firewall
|
Details
|
|
|
08-25-2010
|
2.25
|
Started fuselage
|
Details
|
|
|
05-30-2010
|
0.50
|
Washed oil off of fuselage
|
|
|