Powered By Kitlog Pro v2.0
Bruces S-19 Build Log
S-19 Venterra
Wings
Work Logs Found:
80
Category Work Time:
440 Hours
Date
Hours
Work Log Summary
Details
09-22-2017
1.00
Built wing-to-body fairings
Details
09-15-2017
1.00
Prefit wings
Details
06-10-2013
1.00
Built a tip support stand
Details
05-27-2013
8.00
Rearanged Shop
Details
05-10-2013
8.00
Finished RHS Wing Tip
Details
05-05-2013
4.00
Installed lower skin
Details
05-05-2013
8.00
Finished Wing
Details
05-04-2013
2.00
Installed Pitot Tube
Details
05-02-2013
4.00
Final Systems Installation
Details
05-01-2013
4.00
Installing Fuel Tank
Details
04-25-2013
1.00
Fixed cap fuel leak
Details
04-24-2013
4.00
Pressure tested tank with home-made manometer
Details
04-18-2013
4.00
Preparing fuel tank
Details
02-07-2013
10.00
Assembled frame, started electrical installation
Details
02-02-2013
8.00
Primed wing details
Details
12-20-2012
5.00
Finished up the tip
Details
12-17-2012
10.00
Built the RHS wing tip
Details
12-12-2012
10.00
Finished drilling wing skins
Details
12-01-2012
20.00
Started skining wing
Details
11-26-2012
5.00
Assembled Wing frame
Details
11-24-2012
8.00
Primed wing components
Details
11-19-2012
10.00
Prepared wing for primer
Details
07-23-2012
10.00
Building up the frame
Details
07-18-2012
10.00
Started the Right Hand Wing
Details
04-27-2012
2.00
Hung wing in rafters for safe keeping
Details
04-10-2012
6.00
Finished the Left Hand Wing!
Details
04-08-2012
6.00
Turned wing upright and clecoed upper skin
Details
04-07-2012
8.00
Riveted Lower Wing Skin
Details
04-01-2012
4.00
Installed Lower Aft wing skin
Details
03-31-2012
6.00
Installed Fuel Tank
Details
03-28-2012
4.00
Fixed leaky fuel cap
Details
03-25-2012
8.00
Pressure tested tank - home made manometer.
Details
03-21-2012
3.00
Installing fuel sender
Details
03-21-2012
2.00
Finisher sender installation
Details
03-03-2012
8.00
Fuel tank prep
Details
02-26-2012
2.00
Finished fuel lines
Details
02-26-2012
8.00
Fabricated fuel return lines
Details
01-29-2012
2.00
Fuel tank prep
Details
01-15-2012
4.00
Fuel tank hadware
Details
01-14-2012
4.00
Drilled the fuel pick-up tubes.
Details
12-24-2011
4.00
Modified sender ring, drilled mounting holes in ta
Details
12-23-2011
2.00
Trimed fuel tank filler necks
Details
12-14-2011
6.00
Planing for a wing tip VOR/ILS antenna
Details
11-30-2011
16.00
Primed Skins and Leading Edge
Details
10-31-2011
6.00
Built a handling table
Details
10-23-2011
6.00
Started with fuel tank
Details
10-22-2011
8.00
Building the aileron push rods
Details
10-09-2011
8.00
Finished drilling left hand wing
Details
10-04-2011
2.00
How not to drill a hole (or impress your wife)
Details
10-02-2011
6.00
Formed LE skins
Details
10-01-2011
1.00
Turned wing top side up
Details
10-01-2011
2.00
Finished the bottom of the wing.
Details
10-01-2011
6.00
Fabricated Torque Angle
Details
09-24-2011
4.00
Drilled Lower Leading Edge Skin
Details
09-09-2011
2.00
Loaded LE wing skin
Details
09-07-2011
2.00
Trimed fwd LE ribs
Details
09-05-2011
2.00
Modified and match drilled aileron hinge doublers
Details
08-29-2011
3.00
Set Flap hinge
Details
08-28-2011
6.00
Aligned Aileron Hinge
Details
07-04-2011
2.00
Reset wing top side up
Details
07-03-2011
1.00
One man wing flip
Details
07-03-2011
8.00
Drilling wing skins
Details
07-02-2011
4.00
Drilling wing skins
Details
07-01-2011
4.00
Started drilling wing skins
Details
06-28-2011
1.00
Fabricated wing skin stiffeners
Details
06-26-2011
2.00
working on the wing skins
Details
06-25-2011
6.00
Set up work bench blocks and trued wing
Details
06-20-2011
16.00
primed and riveted the LHS wing frame
Details
06-18-2011
12.00
primed the LHS wing frame
Details
06-11-2011
4.00
Details
06-04-2011
6.00
Deburing wing details
Details
05-30-2011
4.00
Drilling out the rear spar
Details
05-26-2011
3.00
Nose rib assy
05-21-2011
8.00
Touch up work on the machined spars
Details
05-21-2011
4.00
Continuing on the left hand wing assy
Details
01-12-2011
8.00
Perliminary assy of the wing
Details
01-09-2011
8.00
Unpacked wing crate and started LH wing
Details
05-30-2010
4.00
Reamed Wing Spars
Details
05-16-2010
6.00
Inventoried wing kit
Details
04-08-2010
4.00
Wing Kit Arived
Details
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
Category
# Logs
# Hours
All
460
1984
Aft Fuselage
20
138
Aileron
13
71
Assembly
9
9
Builder
1
Canopy
12
37
Center Fuselage
31
165
Controls
9
15
Cowling
16
16
Demo Flight
2
Distractions
2
Electrical
28
156
Empennage
3
2
Engine
7
8
Fiberglass Tip for V
9
68
Flaps
6
44
Flight Test
5
5
Forward Fuselage
27
139
Fuselage
6
11
FWF
33
57
Horiz Stabilator
29
131
Instruments
42
201
Interiour
6
35
Landing Gear
9
31
Paint
10
10
Project
1
Rudder
11
47
Seats
5
65
Shop
4
Tips
7
0
Tools
3
Trim Tab
1
8
Vertical Stablizer
13
75
Wings
80
440
Copyright © 2001-2024 Matronics. All Rights Reserved.