KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
Work Logs Found: 80
Category Work Time: 440 Hours
 Date
Hours
Work Log Summary

Details

 09-22-2017
1.00
Built wing-to-body fairings
Details
       

 09-15-2017
1.00
Prefit wings
Details
       

 06-10-2013
1.00
Built a tip support stand
Details
     

 05-27-2013
8.00
Rearanged Shop
Details
       

 05-10-2013
8.00
Finished RHS Wing Tip
Details
       

 05-05-2013
4.00
Installed lower skin
Details
       

 05-05-2013
8.00
Finished Wing
Details
       

 05-04-2013
2.00
Installed Pitot Tube
Details
       

 05-02-2013
4.00
Final Systems Installation
Details
       

 05-01-2013
4.00
Installing Fuel Tank
Details
       

 04-25-2013
1.00
Fixed cap fuel leak
Details
       

 04-24-2013
4.00
Pressure tested tank with home-made manometer
Details
       

 04-18-2013
4.00
Preparing fuel tank
Details
       

 02-07-2013
10.00
Assembled frame, started electrical installation
Details
       

 02-02-2013
8.00
Primed wing details
Details
       

 12-20-2012
5.00
Finished up the tip
Details
     

 12-17-2012
10.00
Built the RHS wing tip
Details
       

 12-12-2012
10.00
Finished drilling wing skins
Details
       

 12-01-2012
20.00
Started skining wing
Details
       

 11-26-2012
5.00
Assembled Wing frame
Details
     

 11-24-2012
8.00
Primed wing components
Details
     

 11-19-2012
10.00
Prepared wing for primer
Details
     

 07-23-2012
10.00
Building up the frame
Details
       

 07-18-2012
10.00
Started the Right Hand Wing
Details
       

 04-27-2012
2.00
Hung wing in rafters for safe keeping
Details
       

 04-10-2012
6.00
Finished the Left Hand Wing!
Details
       

 04-08-2012
6.00
Turned wing upright and clecoed upper skin
Details
       

 04-07-2012
8.00
Riveted Lower Wing Skin
Details
       

 04-01-2012
4.00
Installed Lower Aft wing skin
Details
       

 03-31-2012
6.00
Installed Fuel Tank
Details
       

 03-28-2012
4.00
Fixed leaky fuel cap
Details
       

 03-25-2012
8.00
Pressure tested tank - home made manometer.
Details
       

 03-21-2012
3.00
Installing fuel sender
Details
       

 03-21-2012
2.00
Finisher sender installation
Details
       

 03-03-2012
8.00
Fuel tank prep
Details
       

 02-26-2012
2.00
Finished fuel lines
Details
       

 02-26-2012
8.00
Fabricated fuel return lines
Details
       

 01-29-2012
2.00
Fuel tank prep
Details
     

 01-15-2012
4.00
Fuel tank hadware
Details
     

 01-14-2012
4.00
Drilled the fuel pick-up tubes.
Details
     

 12-24-2011
4.00
Modified sender ring, drilled mounting holes in ta
Details
       

 12-23-2011
2.00
Trimed fuel tank filler necks
Details
       

 12-14-2011
6.00
Planing for a wing tip VOR/ILS antenna
Details
       

 11-30-2011
16.00
Primed Skins and Leading Edge
Details
       

 10-31-2011
6.00
Built a handling table
Details
       

 10-23-2011
6.00
Started with fuel tank
Details
     

 10-22-2011
8.00
Building the aileron push rods
Details
       

 10-09-2011
8.00
Finished drilling left hand wing
Details
     

 10-04-2011
2.00
How not to drill a hole (or impress your wife)
Details
       

 10-02-2011
6.00
Formed LE skins
Details
       

 10-01-2011
1.00
Turned wing top side up
Details
       

 10-01-2011
2.00
Finished the bottom of the wing.
Details
       

 10-01-2011
6.00
Fabricated Torque Angle
Details
       

 09-24-2011
4.00
Drilled Lower Leading Edge Skin
Details
     

 09-09-2011
2.00
Loaded LE wing skin
Details
     

 09-07-2011
2.00
Trimed fwd LE ribs
Details
       

 09-05-2011
2.00
Modified and match drilled aileron hinge doublers
Details
       

 08-29-2011
3.00
Set Flap hinge
Details
     

 08-28-2011
6.00
Aligned Aileron Hinge
Details
     

 07-04-2011
2.00
Reset wing top side up
Details
     

 07-03-2011
1.00
One man wing flip
Details
       

 07-03-2011
8.00
Drilling wing skins
Details
       

 07-02-2011
4.00
Drilling wing skins
Details
     

 07-01-2011
4.00
Started drilling wing skins
Details
       

 06-28-2011
1.00
Fabricated wing skin stiffeners
Details
     

 06-26-2011
2.00
working on the wing skins
Details
     

 06-25-2011
6.00
Set up work bench blocks and trued wing
Details
       

 06-20-2011
16.00
primed and riveted the LHS wing frame
Details
       

 06-18-2011
12.00
primed the LHS wing frame
Details

 06-11-2011
4.00

Details

 06-04-2011
6.00
Deburing wing details
Details

 05-30-2011
4.00
Drilling out the rear spar
Details
     

 05-26-2011
3.00
Nose rib assy
     

 05-21-2011
8.00
Touch up work on the machined spars
Details
     

 05-21-2011
4.00
Continuing on the left hand wing assy
Details
       

 01-12-2011
8.00
Perliminary assy of the wing
Details
       

 01-09-2011
8.00
Unpacked wing crate and started LH wing
Details
     

 05-30-2010
4.00
Reamed Wing Spars
Details
       

 05-16-2010
6.00
Inventoried wing kit
Details
     

 04-08-2010
4.00
Wing Kit Arived
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.