Powered By Kitlog Pro v2.0
Steve Zelenys RV-7
RV-7
Horizontal Stab.
Work Logs Found:
9
Category Work Time:
23 Hours
Date
Hours
Work Log Summary
Details
05-02-2010
2.50
Dimpling the skins for the horizontal stabilizer.
Details
04-25-2010
2.50
Riveting the forward spar.
Details
04-23-2010
1.50
De-burring
Details
04-18-2010
2.50
Match drilling
Details
04-17-2010
4.00
Rib fluting
Details
04-14-2010
3.00
Horizontal Stab. Fwd Spar
Details
04-13-2010
1.75
Horizontal Stab. Fwd spar
Details
04-11-2010
3.50
Horizontal Stab. Rear Spar
Details
04-10-2010
2.00
Horizontal Stab. Rear Spar
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
27
81
Emp. R/H Elevator
2
9
Emp. Rudder
4
14
Horizontal Stab.
9
23
Preparation
4
13
Rudder
4
14
Vertical Stabilizer
4
8
Copyright © 2001-2024 Matronics. All Rights Reserved.