Date
|
Hours
|
Work Log Summary

|
Details

|
06-17-2016
|
6.00
|
Cowling Day #35 and Seat belts
|
Details
|
  |
|
03-17-2016
|
5.00
|
Cabin Heat and Cowling Day #2
|
Details
|
 |
|
03-16-2016
|
5.00
|
Cabin heat mount
|
Details
|
|
|
03-09-2016
|
5.00
|
Cabin Heat exchanger and more
|
Details
|
|
|
12-11-2015
|
3.00
|
Cabin Punch list #2
|
Details
|
  |
|
12-10-2015
|
2.00
|
Cabin Punch list
|
Details
|
  |
|
12-09-2015
|
2.00
|
More finish work and fuel system
|
Details
|
  |
|
12-01-2015
|
4.00
|
Misc cabin and FWF systems
|
Details
|
|
|
11-28-2015
|
2.00
|
Tunnel closure and more
|
Details
|
  |
|
11-27-2015
|
1.50
|
Fuel system and tunnel work
|
Details
|
  |
|
11-17-2015
|
1.50
|
Tunnel work
|
Details
|
  |
|
11-12-2015
|
3.00
|
Fuel system and cowling work
|
Details
|
|
|
11-10-2015
|
2.00
|
Engine sensors and cooler valve
|
Details
|
 |
|
11-09-2015
|
4.50
|
More fuel system
|
Details
|
|
|
11-08-2015
|
3.00
|
Fuel system work
|
Details
|
|
|
11-05-2015
|
1.50
|
FWF fuel system
|
Details
|
|
|
11-02-2015
|
4.00
|
Root Fairing done, Propeller Arrival
|
Details
|
 |
|
10-27-2015
|
3.00
|
Fuel system work
|
Details
|
 |
|
10-24-2015
|
5.00
|
Fairing Pin hole filling
|
Details
|
|
|
10-22-2015
|
4.50
|
Wheel Pants and Farings Compete
|
Details
|
 |
|
10-21-2015
|
4.50
|
Fuel system and nose tire fairing
|
Details
|
|
|
10-19-2015
|
4.00
|
Fuel system- Part Deux
|
Details
|
  |
|
10-17-2015
|
2.00
|
Right wheel pant
|
Details
|
  |
|
10-16-2015
|
2.50
|
Wheelpants and wingwalk
|
Details
|
|
|
10-15-2015
|
2.50
|
Interior side panel install
|
Details
|
 |
|
10-06-2015
|
2.50
|
Interior work
|
Details
|
  |
|
09-23-2015
|
4.00
|
Altn Flap UP power
|
Details
|
 |
|
09-17-2015
|
3.00
|
Wiring clean-up and msc
|
Details
|
 |
|
09-01-2015
|
2.50
|
Access covers/ fairings
|
Details
|
  |
|
08-24-2015
|
6.00
|
Misc Multiple Items
|
Details
|
  |
|
08-18-2015
|
3.50
|
More Fairing work
|
Details
|
  |
|
08-17-2015
|
5.00
|
Wheel pants and fairings
|
Details
|
 |
|
07-31-2015
|
3.00
|
Fairings
|
Details
|
|
|
07-24-2015
|
3.00
|
Throttle sub panel and fairings
|
Details
|
 |
|
07-14-2015
|
6.00
|
Fuel system and Throttle quad.
|
Details
|
|
|
07-13-2015
|
4.00
|
Fuel leak
|
Details
|
  |
|
07-05-2015
|
2.00
|
Fuel leak and wingtips
|
Details
|
  |
|
06-26-2015
|
5.00
|
Fuel system/ seat heat/ annunciator
|
Details
|
|
|
06-25-2015
|
2.50
|
Fuel leak and lighting test
|
Details
|
|
|
06-19-2015
|
2.50
|
Farings and misc
|
Details
|
 |
|
06-18-2015
|
3.00
|
Fairings
|
Details
|
  |
|
06-16-2015
|
3.00
|
Fairings
|
Details
|
|
|
06-15-2015
|
3.50
|
Rt. Fuel tank calibration
|
Details
|
|
|
06-13-2015
|
5.00
|
Pitot/AoA and Throttle sub-panel
|
Details
|
|
|
06-12-2015
|
2.50
|
Parking Brake Control Mount
|
Details
|
  |
|
06-11-2015
|
2.50
|
Parking Brake Control
|
Details
|
  |
|
06-10-2015
|
5.00
|
Throttle mount/ wiring/ heater testing
|
Details
|
  |
|
06-09-2015
|
6.00
|
Throttle mod and more
|
Details
|
|
|
06-08-2015
|
6.00
|
Fuel tank, Control Sticks, Throttle work
|
Details
|
|
|
03-18-2015
|
1.50
|
FW doubler
|
Details
|
  |
|
03-16-2015
|
3.00
|
FW penetrations
|
Details
|
  |
|
02-25-2015
|
2.00
|
Panel work
|
Details
|
  |
|
02-23-2015
|
3.00
|
Throttle Quadrant and panel work
|
Details
|
  |
|
01-31-2015
|
3.50
|
Section 46 Complete.
|
Details
|
|
|
01-30-2015
|
5.00
|
Mount and FWF work
|
Details
|
|
|
01-23-2015
|
6.00
|
Mount and more wiring
|
Details
|
|
|
11-24-2014
|
2.50
|
Fitting Leak and Door warning switch
|
Details
|
  |
|
11-13-2014
|
3.00
|
Fuel System- testing
|
Details
|
  |
|
11-12-2014
|
4.00
|
Fuel System cont.
|
Details
|
|
|
11-07-2014
|
1.00
|
Fuel System
|
Details
|
  |
|
10-27-2014
|
4.00
|
Engine mount returned
|
Details
|
|
|
10-07-2014
|
1.50
|
Fairings
|
Details
|
  |
|
10-06-2014
|
3.00
|
Tips and Tires
|
Details
|
 |
|
10-04-2014
|
2.00
|
Left tire
|
Details
|
|
|
10-03-2014
|
4.00
|
RightTire and Mount work
|
Details
|
|
|
09-30-2014
|
3.00
|
Wingtip repair and more
|
Details
|
|
|
09-19-2014
|
2.50
|
Fairings
|
Details
|
  |
|
09-05-2014
|
2.50
|
Light switch wiring
|
Details
|
  |
|
09-04-2014
|
3.00
|
Section 12 complete
|
Details
|
|
|
09-03-2014
|
4.00
|
Emp. fairing nutplates
|
Details
|
  |
|
09-02-2014
|
3.00
|
Empennage Fairing work
|
Details
|
  |
|
08-28-2014
|
4.00
|
Empennage Fairing
|
Details
|
|
|
08-27-2014
|
4.00
|
Trim and Rudder install work
|
Details
|
|
|
08-22-2014
|
5.50
|
VS/ rudder install
|
Details
|
|
|
08-20-2014
|
4.00
|
Wingtip lights and priming prep
|
Details
|
|
|
08-19-2014
|
3.00
|
HS install, Wingtips and lights
|
Details
|
|
|
08-13-2014
|
3.00
|
Misc work
|
Details
|
  |
|
08-12-2014
|
3.00
|
Fuel system and tail wiring
|
Details
|
  |
|
08-05-2014
|
3.00
|
More avionics wiring
|
Details
|
  |
|
08-01-2014
|
2.00
|
Avionics wiring
|
Details
|
  |
|
07-15-2014
|
3.00
|
Wing wiring, wingtip, and step assists
|
Details
|
|
|
05-29-2014
|
2.50
|
Doors, Pins, and more
|
Details
|
  |
|
05-22-2014
|
2.50
|
interior work
|
Details
|
 |
|
05-21-2014
|
3.50
|
Section 45 Completed
|
Details
|
|
|
05-20-2014
|
2.50
|
Door struts and locks
|
Details
|
|
|
05-14-2014
|
2.00
|
Left door work
|
Details
|
|
|
05-11-2014
|
3.00
|
Interior and wingtip lens
|
Details
|
 |
|
05-02-2014
|
4.00
|
Door prep and window work
|
Details
|
|
|
04-30-2014
|
2.00
|
Interior work
|
Details
|
  |
|
04-14-2014
|
4.50
|
Cleanup, interior, and other
|
Details
|
|
|
04-13-2014
|
2.50
|
Painting do over and more
|
Details
|
  |
|
04-12-2014
|
2.50
|
Interior Paint and Misc
|
Details
|
|
|
04-11-2014
|
3.00
|
Final Sanding Surfacer
|
Details
|
  |
|
03-24-2014
|
3.00
|
Int. Paint prep and part priming
|
Details
|
  |
|
03-22-2014
|
4.00
|
Body work Day #2
|
Details
|
|
|
03-21-2014
|
2.00
|
Body Work
|
Details
|
  |
|
03-15-2014
|
4.00
|
Body and Wingtips day #2
|
Details
|
 |
|
03-14-2014
|
4.00
|
Doors and Wingtips
|
Details
|
|
|
03-11-2014
|
3.00
|
Body Finish work
|
Details
|
|
|
03-10-2014
|
3.00
|
Wingtips and Body work Day#2
|
Details
|
  |
|
03-09-2014
|
3.00
|
Body work
|
Details
|
  |
|
02-01-2014
|
4.50
|
Body and fairing work
|
Details
|
  |
|
01-23-2014
|
5.00
|
Fairings and tanks
|
Details
|
|
|
01-22-2014
|
4.00
|
Wingtips and Body work
|
Details
|
  |
|
01-06-2014
|
4.00
|
Body work and misc work
|
Details
|
  |
|
01-05-2014
|
2.00
|
Cabin Heat and cleanup
|
Details
|
|
|
12-29-2013
|
2.00
|
Vent fans
|
Details
|
  |
|
12-28-2013
|
1.50
|
Interior lights
|
Details
|
  |
|
12-25-2013
|
2.00
|
Tanks and body work
|
Details
|
|
|
12-19-2013
|
2.50
|
Tunnel clean up work
|
Details
|
 |
|
12-18-2013
|
3.50
|
Fuel system/Lights/ wing tips
|
Details
|
  |
|
12-17-2013
|
2.00
|
Tank Work #3
|
Details
|
  |
|
12-16-2013
|
2.00
|
Tank work #2
|
Details
|
  |
|
12-15-2013
|
2.50
|
Fuel System #10
|
Details
|
|
|
12-14-2013
|
2.00
|
Fuel Tank Repairs
|
Details
|
  |
|
12-13-2013
|
3.00
|
Fuel system #9 and Tank work
|
Details
|
 |
|
12-12-2013
|
3.00
|
Fuel system day #8 and servo install
|
Details
|
|
|
12-09-2013
|
2.50
|
Tank Test and Body work
|
Details
|
  |
|
12-07-2013
|
3.00
|
Fuel System #7 and Avionics
|
Details
|
  |
|
12-04-2013
|
3.50
|
Fuel system #6
|
Details
|
  |
|
11-27-2013
|
3.00
|
Fuel system #5
|
Details
|
  |
|
11-26-2013
|
3.00
|
Fuel system and door repair
|
Details
|
 |
|
11-25-2013
|
2.00
|
Moving Day #1
|
Details
|
|
|
11-19-2013
|
1.50
|
Bag door tray
|
Details
|
 |
|
11-14-2013
|
3.00
|
Fuel system #4
|
Details
|
  |
|
11-03-2013
|
2.00
|
Fuel system #3
|
Details
|
  |
|
11-02-2013
|
5.00
|
Mid seat support rail repair
|
Details
|
  |
|
11-01-2013
|
2.00
|
Mid seat support rail fix + fuel system
|
Details
|
  |
|
10-29-2013
|
3.50
|
Body Work #4 and Fuel System #2
|
Details
|
  |
|
10-21-2013
|
3.00
|
Body work #3 and Fuel System
|
Details
|
  |
|
10-20-2013
|
2.00
|
Body work cont. #2
|
Details
|
|
|
10-17-2013
|
3.00
|
Body work continues
|
Details
|
  |
|
10-15-2013
|
2.00
|
Air vents and body work
|
Details
|
  |
|
10-14-2013
|
3.00
|
Door and Body work
|
Details
|
  |
|
10-05-2013
|
1.50
|
Finished Section 43
|
Details
|
  |
|
10-04-2013
|
2.00
|
More Door work and aft skin install
|
Details
|
  |
|
09-27-2013
|
3.50
|
Door frames and Aft top skin install
|
Details
|
  |
|
09-26-2013
|
4.00
|
Rudder, Fuselage, and interior
|
Details
|
|
|
09-25-2013
|
3.00
|
Misc Work Day #2
|
Details
|
 |
|
09-17-2013
|
1.50
|
Misc work
|
Details
|
  |
|
09-16-2013
|
4.50
|
Body Work- aka door rework
|
Details
|
 |
|
09-04-2013
|
3.00
|
Fairings Day#4
|
Details
|
  |
|
09-03-2013
|
3.00
|
Windows
|
Details
|
  |
|
09-02-2013
|
3.50
|
Fairings Day #3
|
Details
|
  |
|
08-30-2013
|
2.50
|
Fairings- Day #2
|
Details
|
|
|
08-29-2013
|
2.00
|
Fairings - Windshield and Rudder
|
Details
|
|
|
08-28-2013
|
3.50
|
Windshield fairing
|
Details
|
|
|
08-27-2013
|
2.50
|
Windows completed and strobes
|
Details
|
 |
|
08-26-2013
|
3.00
|
Windows cont.
|
Details
|
|
|
08-25-2013
|
3.50
|
Window install
|
Details
|
  |
|
08-24-2013
|
3.50
|
Rudder Trim work
|
Details
|
|
|
08-23-2013
|
4.00
|
Rudder Trim and window prep
|
Details
|
  |
|
08-16-2013
|
2.00
|
More Rudder Trim
|
Details
|
  |
|
08-15-2013
|
3.50
|
Window prep, rudder trim, Interior lights
|
Details
|
|
|
08-14-2013
|
4.50
|
Windows and wingtips
|
Details
|
|
|
08-13-2013
|
4.00
|
Door, windows, seats
|
Details
|
|
|
08-06-2013
|
3.00
|
Doors and rudder trim cont.
|
Details
|
  |
|
08-05-2013
|
4.50
|
Doors and rudder trim
|
Details
|
|
|
08-02-2013
|
4.50
|
Doors and vents
|
Details
|
|
|
07-22-2013
|
1.50
|
CO Detector and GPS Antennas
|
Details
|
  |
|
07-20-2013
|
1.50
|
Compass mount, vent fans
|
Details
|
|
|
07-17-2013
|
8.00
|
Secton 41 completed, panel vents
|
Details
|
 |
|
07-16-2013
|
4.50
|
Fuel system, cowl hinges, brake repair, vent fans
|
Details
|
 |
|
06-29-2013
|
3.00
|
Cowling mount
|
Details
|
  |
|
06-28-2013
|
3.00
|
Misc plumbing
|
Details
|
  |
|
06-27-2013
|
3.50
|
Antennas and cable mounts, and more
|
Details
|
  |
|
06-26-2013
|
3.50
|
Switches/ side panels
|
Details
|
  |
|
06-24-2013
|
4.50
|
Air vent/ windscreen/ tunnel work
|
Details
|
  |
|
06-21-2013
|
4.50
|
CO Detector and Windows
|
Details
|
|
|
06-05-2013
|
2.50
|
Door Warning Light install and AN-21 work
|
Details
|
 |
|
05-06-2013
|
2.50
|
Panel wiring prep cont.
|
Details
|
|
|
05-05-2013
|
2.50
|
Panel and power bus integration
|
Details
|
  |
|
03-30-2013
|
5.00
|
Center Brace and Wiring Harness
|
Details
|
|
|
03-28-2013
|
1.50
|
Center Brace install
|
Details
|
  |
|
03-27-2013
|
1.50
|
Fwd Fuselage Cleanup and Center post
|
Details
|
  |
|
03-26-2013
|
2.50
|
Fwd Fuselage Installed
|
Details
|
|
|
03-20-2013
|
2.00
|
Firewall insulation
|
Details
|
  |
|
03-19-2013
|
2.00
|
Side panels and door frames
|
Details
|
  |
|
03-18-2013
|
3.00
|
Fwd Fuse. Paint and body work
|
Details
|
 |
|
03-15-2013
|
2.50
|
Misc. Cleanup day
|
Details
|
  |
|
03-11-2013
|
2.00
|
Electrical rework
|
Details
|
  |
|
03-10-2013
|
2.00
|
Electrical install cont.
|
Details
|
  |
|
03-08-2013
|
2.50
|
Electrical planning and install
|
Details
|
  |
|
03-06-2013
|
3.00
|
Door Frames and other misc
|
Details
|
  |
|
03-03-2013
|
2.00
|
GPU Doubler redo and Body work
|
Details
|
  |
|
03-01-2013
|
2.00
|
Cabin Body Blending
|
Details
|
  |
|
02-28-2013
|
5.50
|
Pin Block and Gas Strut Install
|
Details
|
|
|
02-27-2013
|
4.00
|
Right Door Lock
|
Details
|
|
|
02-27-2013
|
2.00
|
More door frame work
|
Details
|
  |
|
02-26-2013
|
4.50
|
Left Door Lock and other misc
|
Details
|
|
|
02-25-2013
|
2.50
|
Elevator Tim and Aileron pushrods
|
Details
|
  |
|
02-24-2013
|
3.00
|
Avionics shelf and Fuel valve mount
|
Details
|
 |
|
02-11-2013
|
3.00
|
Tailcone work and misc other
|
Details
|
 |
|
02-08-2013
|
2.50
|
Fuel valve #3
|
Details
|
  |
|
02-07-2013
|
3.50
|
Fuel valve #2
|
Details
|
|
|
02-06-2013
|
1.50
|
Fuel valve
|
Details
|
  |
|
01-24-2013
|
2.50
|
Right Door
|
Details
|
  |
|
01-23-2013
|
3.50
|
Aux battery and aft shelf
|
Details
|
|
|
01-22-2013
|
3.50
|
Aft shelf and Aux Battery
|
Details
|
|
|
01-19-2013
|
1.00
|
Interior and Aft Shelf work
|
Details
|
 |
|
01-18-2013
|
1.00
|
D10a install work
|
Details
|
  |
|
01-17-2013
|
3.00
|
Right Door
|
Details
|
  |
|
01-16-2013
|
4.00
|
More left door and electrical
|
Details
|
|
|
01-15-2013
|
4.00
|
Left Door Fit and more electrical
|
Details
|
 |
|
01-14-2013
|
3.00
|
Elev. trim plug and New ELT mount
|
Details
|
|
|
01-13-2013
|
2.50
|
Door Locks installed
|
Details
|
  |
|
01-12-2013
|
3.50
|
Instrument Panel and misc work
|
Details
|
|
|
01-11-2013
|
3.00
|
Right cabin door
|
Details
|
 |
|
01-10-2013
|
3.00
|
Left cabin door
|
Details
|
|
|
12-31-2012
|
1.50
|
Ground cables
|
Details
|
 |
|
12-30-2012
|
1.50
|
Electrical power cables
|
Details
|
  |
|
12-20-2012
|
1.50
|
Flaps and Shelf complete
|
Details
|
  |
|
12-19-2012
|
2.00
|
Primed Shelf parts
|
Details
|
  |
|
12-18-2012
|
2.00
|
Equipment Box shelves
|
Details
|
|
|
12-13-2012
|
3.50
|
Electrical work
|
Details
|
  |
|
12-12-2012
|
5.00
|
Cabin Cover installed
|
Details
|
|
|
12-10-2012
|
3.00
|
Cabin Cover prep and lights finished
|
Details
|
  |
|
12-09-2012
|
2.00
|
Priming and Prep work
|
Details
|
  |
|
12-08-2012
|
2.50
|
Battery Box and Lights
|
Details
|
 |
|
12-05-2012
|
4.00
|
Interior and Electrical
|
Details
|
  |
|
12-04-2012
|
2.50
|
Overhead Lights
|
Details
|
|
|
11-07-2012
|
2.50
|
Brakes and Contols
|
Details
|
|
|
10-25-2012
|
3.50
|
Cabin Heat and Center Console
|
Details
|
|
|
10-24-2012
|
2.50
|
Control system install
|
Details
|
|
|
10-23-2012
|
3.00
|
Completed brake system install
|
Details
|
|
|
10-22-2012
|
1.50
|
New Internal Brake Lines
|
Details
|
|
|
10-11-2012
|
3.00
|
Interior and windows
|
Details
|
  |
|
10-10-2012
|
3.50
|
Interior work
|
Details
|
 |
|
09-28-2012
|
1.50
|
Doors and Console again
|
Details
|
  |
|
09-27-2012
|
1.50
|
Door and Center Console
|
Details
|
  |
|
09-26-2012
|
1.50
|
Misc work
|
Details
|
  |
|
08-28-2012
|
2.50
|
Vents/ Controller/ Grd Power plug
|
Details
|
|
|
08-25-2012
|
2.00
|
Still interior panels
|
Details
|
|
|
08-24-2012
|
2.50
|
More interior panels
|
Details
|
  |
|
08-23-2012
|
5.00
|
Hinge covers and Interior panels cont.
|
Details
|
|
|
08-22-2012
|
4.00
|
Interior panels cont.
|
Details
|
  |
|
08-21-2012
|
4.00
|
Continued fitting Aerosport Panel
|
Details
|
|
|
08-20-2012
|
3.00
|
Fitting Aerosport Panels
|
Details
|
|
|
08-19-2012
|
2.00
|
Installed newly painted parts
|
Details
|
|
|
08-18-2012
|
6.00
|
Aux Batt mount/ Doors/ Grd. Pwr plug + painting
|
Details
|
|
|
08-17-2012
|
4.00
|
Aux Battery Mount and center console
|
Details
|
|
|
08-15-2012
|
3.50
|
Door Locks cont. with Misc other
|
Details
|
  |
|
08-13-2012
|
4.00
|
Door Locks
|
Details
|
  |
|
08-10-2012
|
4.00
|
Prime and install mounts
|
Details
|
|
|
08-07-2012
|
1.50
|
Rosen/ Elt/ Vent valve mounts
|
Details
|
  |
|
08-01-2012
|
4.00
|
Visor Mounts and Wheel Pants
|
Details
|
|
|
07-26-2012
|
4.00
|
ELT, Vent controller, and misc
|
Details
|
|
|
07-20-2012
|
2.50
|
Headliner Day #3
|
Details
|
 |
|
07-19-2012
|
2.50
|
Headliner day #2 and main wheel fairnings
|
Details
|
  |
|
07-18-2012
|
2.50
|
Overhead liner
|
Details
|
  |
|
07-16-2012
|
1.50
|
Main Wheel Fairings
|
Details
|
  |
|
06-25-2012
|
4.50
|
Primed Cabin cover and GMU mount install
|
Details
|
|
|
06-15-2012
|
4.00
|
GPU, GMU and more sanding
|
Details
|
  |
|
06-14-2012
|
5.50
|
Cabin cover, Doors and Main Fairings
|
Details
|
|
|
06-13-2012
|
4.50
|
Yes, more sanding and other stuff
|
Details
|
  |
|
06-12-2012
|
4.50
|
Sanding Resumes and V/L antenna
|
Details
|
|
|
06-11-2012
|
3.50
|
Misc items and GMU mount
|
Details
|
  |
|
06-06-2012
|
2.50
|
Sanding continues- UGH!
|
Details
|
  |
|
06-02-2012
|
3.50
|
Never ending sanding continues
|
Details
|
|
|
06-01-2012
|
6.00
|
Cabin Cover Day #33, Doors Day #20, Fairings
|
Details
|
  |
|
05-31-2012
|
5.00
|
Cabin Cover Day #32, Doors Day #19, Tires
|
Details
|
  |
|
05-29-2012
|
5.00
|
Cabin Cover Day #31 , Doors Day #18
|
Details
|
 |
|
05-25-2012
|
4.00
|
Brakes/Nose gear/Wheel Pants
|
Details
|
  |
|
05-24-2012
|
2.50
|
Wheel Pants Day #7
|
Details
|
|
|
05-23-2012
|
7.30
|
Wheel Pants Day #6
|
Details
|
|
|
05-22-2012
|
2.00
|
Doors Day #17 and Nose wheel pant
|
Details
|
  |
|
05-19-2012
|
1.00
|
Doors Day #16
|
Details
|
  |
|
05-18-2012
|
6.00
|
Doors Day #15 , Wheel Pants Day #5
|
Details
|
  |
|
05-17-2012
|
5.00
|
Doors Day #14 and Wheel Pants Day #4
|
Details
|
|
|
05-16-2012
|
6.00
|
Main wheel pants day #3
|
Details
|
|
|
05-15-2012
|
1.00
|
Doors Day #13
|
Details
|
  |
|
05-12-2012
|
1.00
|
Doors Day #12
|
Details
|
  |
|
05-11-2012
|
5.00
|
Wheel Pants Day #2
|
Details
|
|
|
05-10-2012
|
3.00
|
Main Wheel Pants
|
Details
|
|
|
05-09-2012
|
2.50
|
Right Main/ Brakes/ Mid seat rails
|
Details
|
|
|
05-03-2012
|
3.50
|
Flap Drive and Landing Gear
|
Details
|
  |
|
05-02-2012
|
3.00
|
Wheel install
|
Details
|
  |
|
05-01-2012
|
3.50
|
Flaps and Gear install
|
Details
|
|
|
04-27-2012
|
2.00
|
Avionics and Electrical
|
Details
|
|
|
04-26-2012
|
2.50
|
Fuel System Fabriaction Cont.
|
Details
|
  |
|
04-25-2012
|
1.50
|
Fuel system and Transponder mount
|
Details
|
  |
|
04-23-2012
|
2.00
|
Cabin Cover Day #30 and Fuel system design
|
Details
|
  |
|
04-21-2012
|
5.00
|
System Install begins.
|
Details
|
|
|
04-20-2012
|
2.00
|
Interior Painting
|
Details
|
|
|
04-04-2012
|
4.50
|
Cabin Cover Day #29 and brake mounts.
|
Details
|
|
|
04-03-2012
|
4.50
|
Cabin Cover Day #28 and misc additional work
|
Details
|
  |
|
03-30-2012
|
1.50
|
Cabin Cover Day #27
|
Details
|
  |
|
03-29-2012
|
4.50
|
Interior Paint attempt #2
|
Details
|
  |
|
03-28-2012
|
5.00
|
Fwd Fuselage parts priming
|
Details
|
|
|
03-27-2012
|
3.50
|
Cabin Cover Day #26
|
Details
|
|
|
03-20-2012
|
1.50
|
Console Bonding and misc elect.
|
Details
|
  |
|
03-19-2012
|
2.50
|
Cabin cover day #25 and Doors
|
Details
|
  |
|
03-09-2012
|
2.50
|
Cabin Cover Day #24 and Doors
|
Details
|
  |
|
03-06-2012
|
3.00
|
Under panel work and cabin cover Day #23
|
Details
|
  |
|
02-01-2012
|
3.50
|
Cabin Cover Day #22 and Panel work
|
Details
|
 |
|
01-31-2012
|
4.00
|
Cabin Cover Day #21 and Panel cont.
|
Details
|
|
|
01-30-2012
|
3.50
|
Panel support and Alternate Door attachment
|
Details
|
  |
|
01-26-2012
|
3.00
|
Forward fuselage and overhead console
|
Details
|
|
|
01-25-2012
|
2.50
|
Cabin cover Day #20
|
Details
|
 |
|
01-24-2012
|
2.00
|
Forward Fuselage Day #3
|
Details
|
  |
|
01-23-2012
|
2.00
|
Forward Fuselage Day #2
|
Details
|
  |
|
01-21-2012
|
3.50
|
Forward Fuselage/ Panel install
|
Details
|
|
|
01-20-2012
|
4.00
|
More doors day #7 and panel work
|
Details
|
  |
|
01-19-2012
|
4.50
|
Door Locks Day #6
|
Details
|
|
|
01-18-2012
|
2.50
|
Primed door parts
|
Details
|
 |
|
01-17-2012
|
4.50
|
Locks, Door Frames and Panel supports
|
Details
|
 |
|
01-09-2012
|
2.50
|
Door Locks Day #4 and Panel work
|
Details
|
  |
|
12-23-2011
|
2.50
|
Door Locks Day #3
|
Details
|
  |
|
12-22-2011
|
2.50
|
Door Locks Day #2
|
Details
|
|
|
12-21-2011
|
3.50
|
Continued Door Locks
|
Details
|
|
|
12-14-2011
|
2.50
|
Doors Day #11 - removed and started lock
|
Details
|
  |
|
12-13-2011
|
2.00
|
Doors Day #10 - Hinges and Fitting
|
Details
|
  |
|
12-12-2011
|
4.00
|
Doors Day #9 and Hinges
|
Details
|
|
|
12-09-2011
|
2.00
|
Doors Day #8
|
Details
|
  |
|
12-08-2011
|
3.50
|
Doors Day #7
|
Details
|
  |
|
12-07-2011
|
4.00
|
Door Day #6 - Hinges and Door fitting
|
Details
|
|
|
11-30-2011
|
1.50
|
Door Day #5 --Hinges
|
Details
|
  |
|
11-29-2011
|
2.00
|
Door Day #4 -- Bonding
|
Details
|
|
|
11-10-2011
|
3.50
|
Doors #3 and VS antenna
|
Details
|
|
|
11-09-2011
|
0.75
|
Axle spacers
|
Details
|
 |
|
11-08-2011
|
3.00
|
Primed gear parts
|
Details
|
|
|
11-07-2011
|
3.50
|
Doors #2 and Misc other items
|
Details
|
|
|
11-06-2011
|
0.50
|
Main Tires
|
Details
|
 |
|
11-02-2011
|
1.50
|
Trimming door parts
|
Details
|
 |
|
11-01-2011
|
1.20
|
Doors #1
|
Details
|
  |
|
10-31-2011
|
2.00
|
Finish Kit Inventory
|
Details
|
  |
|
10-30-2011
|
1.00
|
Finsih Kit arrived
|
Details
|
|
|
10-24-2011
|
1.50
|
Interior Paint
|
Details
|
  |
|
09-27-2011
|
1.50
|
Brake Pedals and Panel design
|
Details
|
  |
|
09-21-2011
|
2.50
|
Paint Prep and Panel work
|
Details
|
  |
|
09-09-2011
|
3.50
|
Insulation Complete and Paint Prep Begins
|
Details
|
  |
|
09-07-2011
|
3.00
|
Overhead Console and nose tire
|
Details
|
|
|
08-29-2011
|
2.50
|
Priming parts and Controls
|
Details
|
  |
|
08-28-2011
|
2.50
|
Vents installed and panel layout
|
Details
|
|
|
08-27-2011
|
2.00
|
Cabin Cover #19 and Overhead Console
|
Details
|
|
|
08-25-2011
|
3.50
|
Cabin Cover day 18 + Misc.
|
Details
|
|
|
08-23-2011
|
2.50
|
Brakes, Controls, Cabin Cover cont.
|
Details
|
  |
|
08-22-2011
|
4.50
|
Brakes, Controls, and Cabin Cover
|
Details
|
  |
|
08-20-2011
|
2.50
|
Brake lines
|
Details
|
  |
|
08-19-2011
|
4.50
|
Systems Installation
|
Details
|
|
|
08-12-2011
|
2.00
|
Cabin Cover (still cont.)
|
Details
|
  |
|
08-11-2011
|
3.50
|
Section Clean-up and Cabin Cover cont.
|
Details
|
|
|
08-08-2011
|
4.50
|
Cont, Cabin Cover Prep work
|
Details
|
|
|
08-05-2011
|
1.50
|
Still Drilling Cabin Cover
|
Details
|
  |
|
08-04-2011
|
3.50
|
Drilling Cabin Cover cont.
|
Details
|
|
|
08-03-2011
|
2.50
|
Fwd Fuselage and Cabin Cover cont.
|
Details
|
|
|
08-02-2011
|
2.50
|
Cabin Cover and Insulation
|
Details
|
  |
|
08-01-2011
|
4.00
|
Access Covers, Rudder pedals, Flap actuators
|
Details
|
|
|
07-25-2011
|
0.75
|
Control Rods
|
Details
|
  |
|
07-07-2011
|
2.00
|
Riveting Fwd Fuselage and Seat Backs
|
Details
|
  |
|
06-28-2011
|
0.50
|
Wing fairing stiffeners
|
Details
|
  |
|
06-27-2011
|
1.00
|
Dimpled+ Riveted primed parts
|
Details
|
  |
|
06-21-2011
|
3.50
|
Priming completed
|
Details
|
|
|
06-20-2011
|
5.50
|
Priming parts for Sect.31/35/38/39/42/44
|
Details
|
|
|
06-15-2011
|
3.50
|
Fwd Fuselage and deburring complete
|
Details
|
|
|
06-14-2011
|
1.00
|
Still Deburring
|
Details
|
  |
|
06-13-2011
|
3.50
|
Cabin Cover Timming and Deburring
|
Details
|
  |
|
06-12-2011
|
1.50
|
More Deburring
|
Details
|
  |
|
06-11-2011
|
2.50
|
Rear Seat Cover and Deburring Begins
|
Details
|
  |
|
06-10-2011
|
0.75
|
Fairings
|
Details
|
|
|
06-09-2011
|
2.50
|
Cabin Cover/ Controls/ Priming Prep
|
Details
|
  |
|
06-07-2011
|
3.00
|
Controls/ Brakes/ Cabin Cover cont.
|
Details
|
|
|
06-06-2011
|
0.75
|
Control rods
|
Details
|
  |
|
06-05-2011
|
2.50
|
Fitting Cabin Cover
|
Details
|
|
|
06-04-2011
|
2.50
|
Seat Backs Complete and Cutting Cabin Cover
|
Details
|
  |
|
06-03-2011
|
3.00
|
Seat Backs and Cabin Cover
|
Details
|
|
|
05-26-2011
|
3.00
|
Finished Baggage Door and Cont. Access panels
|
Details
|
|
|
05-19-2011
|
3.00
|
Baggage Areas Complete- Door Mounting Cont.
|
Details
|
|
|
05-18-2011
|
3.00
|
Baggage area assembly
|
Details
|
 |
|
05-17-2011
|
3.00
|
Cont. Floor install
|
Details
|
|
|
05-16-2011
|
3.00
|
More Floor install
|
Details
|
|
|
05-15-2011
|
1.00
|
Riveting Doors and Floors
|
Details
|
  |
|
05-14-2011
|
3.00
|
Floor closeout prep
|
Details
|
  |
|
05-13-2011
|
0.50
|
Fwd top skin
|
Details
|
  |
|
05-12-2011
|
4.50
|
Primed conduit mounts and installed
|
Details
|
|
|
05-11-2011
|
2.50
|
Forward fuselage work and conduits complete
|
Details
|
|
|
05-10-2011
|
2.00
|
Conduit and Antenna Doublers work
|
Details
|
 |
|
05-08-2011
|
1.50
|
More insulation installed
|
Details
|
 |
|
05-06-2011
|
1.50
|
Wiring Conduit Installation
|
Details
|
 |
|
05-05-2011
|
2.00
|
Baggage Floor Access Complete
|
Details
|
|
|
04-27-2011
|
2.00
|
More baggage access work
|
Details
|
  |
|
04-18-2011
|
1.50
|
Riveting more structures
|
Details
|
 |
|
04-10-2011
|
1.50
|
Doublers and step work
|
Details
|
  |
|
03-30-2011
|
2.00
|
Antenna doublers
|
Details
|
 |
|
03-21-2011
|
2.50
|
Floor Work
|
Details
|
  |
|
03-20-2011
|
2.50
|
Dimpling and nutplate install
|
Details
|
  |
|
03-19-2011
|
3.50
|
Fwd Fuselage riveting and more dimpling
|
Details
|
 |
|
03-18-2011
|
3.50
|
Priming Complete+ building resumes
|
Details
|
  |
|
03-17-2011
|
4.00
|
Priming Parts
|
Details
|
|
|
03-16-2011
|
3.50
|
Completed Deburring+ Misc items
|
Details
|
  |
|
03-14-2011
|
2.00
|
Resumed Deburring
|
Details
|
  |
|
01-27-2011
|
1.00
|
More Deburring
|
Details
|
  |
|
01-24-2011
|
2.00
|
Deburring and Baggage Door work
|
Details
|
  |
|
01-21-2011
|
2.00
|
More Baggage Area work
|
Details
|
 |
|
01-20-2011
|
1.50
|
Baggage floors started
|
Details
|
|
|
01-11-2011
|
3.50
|
Tailcone Joined!
|
Details
|
|
|
01-10-2011
|
3.00
|
Final Tailcone Attachment Prep
|
Details
|
|
|
01-07-2011
|
1.50
|
Upper Fwd Fuselage Assembly
|
Details
|
|
|
01-04-2011
|
0.75
|
Match drill upper fwd fuselage
|
Details
|
  |
|
01-03-2011
|
1.00
|
Upper Fuselage Assembly Prep
|
Details
|
  |
|
01-02-2011
|
2.00
|
Tailcone attachment continued
|
Details
|
  |
|
12-24-2010
|
1.50
|
More Match Drilling Tailcone
|
Details
|
  |
|
12-23-2010
|
1.50
|
Match Drilling Tailcone
|
Details
|
 |
|
12-22-2010
|
2.50
|
Tailcone Attachment
|
Details
|
|
|
12-21-2010
|
3.00
|
Riveted Fuselage rib and step work
|
Details
|
|
|
12-19-2010
|
1.50
|
Misc Gear work and Step installation
|
Details
|
|
|
12-18-2010
|
2.00
|
Gear Mounts Finished
|
Details
|
  |
|
12-17-2010
|
4.00
|
Fwd Floor and Gear Mounts
|
Details
|
|
|
12-16-2010
|
2.00
|
Fwd floor prep
|
Details
|
|
|
12-15-2010
|
1.00
|
Misc. finish items
|
Details
|
  |
|
12-13-2010
|
2.00
|
Finished Riveting Skins
|
Details
|
  |
|
12-06-2010
|
2.00
|
Riveted More Fwd Skins
|
Details
|
 |
|
12-04-2010
|
1.50
|
Riveted Fwd Skins
|
Details
|
 |
|
12-03-2010
|
2.00
|
Aft Skins Completed
|
Details
|
|
|
12-02-2010
|
2.25
|
Riveted Right Skins
|
Details
|
|
|
12-01-2010
|
2.00
|
Riveted Left Aft Skin
|
Details
|
  |
|
11-30-2010
|
2.00
|
Riveted Left Skins
|
Details
|
 |
|
11-29-2010
|
1.50
|
Clecoed skins in place
|
Details
|
 |
|
11-20-2010
|
2.50
|
Skin Dimpled
|
Details
|
  |
|
11-19-2010
|
2.00
|
More Structure Riveting
|
Details
|
  |
|
11-18-2010
|
2.00
|
Riveting Fwd Fuselage Channels
|
Details
|
  |
|
11-11-2010
|
3.00
|
Riveting fuselage structure
|
Details
|
|
|
11-10-2010
|
4.00
|
Primed parts
|
Details
|
  |
|
11-09-2010
|
3.00
|
C-sink and deburr complete
|
Details
|
  |
|
11-08-2010
|
1.00
|
Even more C-sinking
|
Details
|
  |
|
11-05-2010
|
1.00
|
More C-sinking
|
Details
|
  |
|
11-04-2010
|
3.50
|
Deburr and C-Sink understructure
|
Details
|
  |
|
11-01-2010
|
1.00
|
More match drilling
|
Details
|
  |
|
10-25-2010
|
3.50
|
Match drilling Fwd Fuselage
|
Details
|
|
|
10-24-2010
|
2.00
|
Forward Side Skins
|
Details
|
|
|
10-22-2010
|
5.00
|
Left Mid Skin and Forward Structure
|
Details
|
|
|
10-21-2010
|
3.00
|
Right Mid Fuselage Skin
|
Details
|
|
|
10-20-2010
|
3.50
|
Longeron and baggage door seal
|
Details
|
|
|
10-19-2010
|
6.50
|
Completed Section 28
|
Details
|
|
|
10-08-2010
|
1.00
|
Longerons complete
|
Details
|
  |
|
10-07-2010
|
4.50
|
Fabricate Longerons
|
Details
|
  |
|
10-06-2010
|
2.50
|
More forward structure
|
Details
|
|
|
10-05-2010
|
3.50
|
Riveted Fwd and Aft sections together
|
Details
|
|
|
10-01-2010
|
3.00
|
Riveted Fwd Floor Structure
|
Details
|
|
|
09-30-2010
|
4.50
|
Riveting fwd fuselage
|
Details
|
|
|
09-29-2010
|
4.50
|
Fwd Fuselage priming complete
|
Details
|
  |
|
09-28-2010
|
4.00
|
Priming begins
|
Details
|
  |
|
09-20-2010
|
2.50
|
More Deburring
|
Details
|
  |
|
09-13-2010
|
4.50
|
C-sink and Deburr forward floor structure
|
Details
|
  |
|
09-12-2010
|
1.00
|
Disassembled fwd fuselage
|
Details
|
  |
|
09-11-2010
|
2.50
|
Joined Fwd and Aft sections
|
Details
|
|
|
09-03-2010
|
3.50
|
Finished Sect 27 and More Fwd Fuselage
|
Details
|
|
|
09-02-2010
|
5.00
|
Bottom skin work-- Front and Rear
|
Details
|
|
|
09-01-2010
|
5.50
|
Firewall riveting and Fwd Fuse Bulkheads
|
Details
|
|
|
08-31-2010
|
2.50
|
Fwd Fuselage Bulkhead Assembly
|
Details
|
|
|
08-30-2010
|
2.00
|
Final prep for riveting Sect 26 + 27
|
Details
|
|
|
08-29-2010
|
1.00
|
Rib riveting finished
|
Details
|
  |
|
08-28-2010
|
1.50
|
More Rib Riveting
|
Details
|
|
|
08-27-2010
|
4.00
|
Cont. Mid Fuse Riveting and started Firewall
|
Details
|
|
|
08-26-2010
|
5.00
|
More Mid Fuselage Riveting
|
Details
|
|
|
08-25-2010
|
3.50
|
Mid Fusealge Riveting
|
Details
|
|
|
08-24-2010
|
8.50
|
Mid Fuse Ribs and Firewall Priming Complete
|
Details
|
|
|
08-23-2010
|
5.00
|
Priming Mid Fuse Ribs and Firewall parts
|
Details
|
 |
|
08-17-2010
|
0.50
|
Deburring complete
|
Details
|
  |
|
08-16-2010
|
5.00
|
Drilled and Deburred Firewall
|
Details
|
|
|
08-15-2010
|
2.00
|
Deburring ribs and Started Firewall
|
Details
|
|
|
08-14-2010
|
5.50
|
Mid Fuselage Ribs
|
Details
|
  |
|
08-13-2010
|
3.00
|
Disassembled Mid Fuselage ribs
|
Details
|
  |
|
08-12-2010
|
2.25
|
More Mid Fuse Ribs
|
Details
|
|
|
08-11-2010
|
4.50
|
Bulkheads and Mid Fuselage Ribs
|
Details
|
|
|
08-04-2010
|
2.50
|
Bulkhead riveting
|
Details
|
|
|
08-03-2010
|
4.00
|
Bulkheads primed, assembly begins
|
Details
|
|
|
08-02-2010
|
3.00
|
Priming Fuselage bulkheads
|
Details
|
  |
|
08-01-2010
|
2.00
|
Fuselage bulkhead deburring
|
Details
|
  |
|
07-31-2010
|
4.50
|
Match drilling and deburring fuselage bulkheads
|
Details
|
  |
|
07-20-2010
|
1.50
|
Aft Center Section and Rear Spar Bulkhead
|
Details
|
|
|
07-14-2010
|
1.00
|
Fwd Center Section Assembly
|
Details
|
 |
|
05-13-2010
|
3.00
|
Inventory
|
Details
|
  |
|
05-12-2010
|
1.00
|
Unpacking fuselage crate
|
Details
|
|
|
05-07-2010
|
0.50
|
Fuselage Kit arrives!
|
Details
|
|