Chucks Lancair 360
360 Mk2
Landing Gear
Work Logs Found:
30
Category Work Time:
68 Hours
Date
Hours
Work Log Summary
Details
07-25-2012
0.50
Building Block for Hyd Cylinder Attach
07-20-2012
0.50
Building Block for Hyd Cylinder Attach
07-15-2012
0.50
Building Block for Hyd Cylinder Attach
07-07-2012
0.50
Building Block for Hyd Cylinder Attach
08-06-2011
2.00
Installed Nose gear hyd lines
Details
08-03-2011
3.00
Installed nose gear
Details
08-02-2011
4.00
Installing Nose gear
Details
07-08-2011
1.50
Install Hyd Lines
Details
06-29-2011
2.00
Remove Landing Gear and Prep for extra support
Details
06-12-2011
2.50
Installing Hyd Lines
Details
06-12-2011
1.50
Installed last interior flex hyd lines
Details
06-12-2011
2.50
Install Hyd Lines
Details
06-05-2011
1.50
Hyd Line installation
Details
05-30-2011
3.00
Built Hyd Lines
Details
05-05-2011
2.00
Built Hydraulic Lines
Details
04-23-2011
5.00
Building hydraulic lines
Details
03-13-2011
3.00
Hydraulic Lines
Details
03-06-2011
6.00
Hydraulic and Fuel system
Details
10-09-2010
3.00
Hydraulic Pump Enclosure
Details
07-11-2010
2.00
Inner Gear Door Hydraulic Valves
Details
06-27-2010
2.00
Inner Gear Door Hydraulic Valves
Details
06-13-2010
2.00
Fitting Landing gear doors
Details
06-08-2010
2.00
Fitting Landing gear doors
Details
06-07-2010
1.00
Locating Inner gear door hyd pressure switch
Details
05-30-2010
2.50
Cut holes for inboard gear doors.
Details
05-29-2010
2.00
Cut holes for inboard gear door
Details
04-24-2010
2.50
Hydraulic system layout
Details
04-20-2010
1.00
Landing gear hydraulics
Details
03-21-2010
4.00
Assembling and Installing Landing Gear
Details
03-20-2010
3.00
Assembling Landing gear
Details
SITE NAVIGATION
Contact Builder
360 Mk2 Home
Category
# Logs
# Hours
All
72
177
Cockpit Interior
18
40
Flight Controls
4
6
Fuselage
9
22
Landing Gear
30
68
Miscellaneous
11
41