KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
Work Logs Found: 17
Category Work Time: 50 Hours
 Date
Hours
Work Log Summary

Details

 11-08-2014
4.00
NLG Door
Details
       

 11-08-2014
3.00
Main Landing Gear door
Details
       

 11-01-2014
4.00
Grass Cutter bracket
Details
       

 03-04-2012
1.00
Installed Strut Extension PSI sensor
Details
     

 02-25-2012
2.00
Installed the 3rd Hyd Pressure Guage
Details
       

 02-12-2012
2.00
Installed Hyd PSI Switches
Details
       

 02-12-2012
2.00
Hyd Pressure Guage installed
Details
       

 01-15-2012
2.00
Installed Hydraulic Lines from Switching Valve
Details
       

 01-14-2012
1.00
Installed Rear Canopy Prox Sensor
Details
       

 01-14-2012
4.00
Installed Hyd Switching Valve
Details
     

 01-02-2012
1.50
Tightened all the Swegelok Fittings and installed
Details
     

 01-02-2012
2.00
Fabricated Canopy Lock Prox Switch Brackets
Details
       

 12-29-2011
6.00
Installed Hydraulic Tubing
Details
       

 12-28-2011
2.00
Installed Emergency Blow down Valve
Details
       

 12-27-2011
2.00
Wired Jumpers On to MLG Controller
Details
       

 12-27-2011
2.00
Installed Grounding Black and Power Block
Details
       

 10-05-2008
10.00
Installation of MLG
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.