Powered By Kitlog Pro v2.0
BEZJet Build
BEZJet
MLG
Work Logs Found:
17
Category Work Time:
50 Hours
Date
Hours
Work Log Summary
Details
11-08-2014
4.00
NLG Door
Details
11-08-2014
3.00
Main Landing Gear door
Details
11-01-2014
4.00
Grass Cutter bracket
Details
03-04-2012
1.00
Installed Strut Extension PSI sensor
Details
02-25-2012
2.00
Installed the 3rd Hyd Pressure Guage
Details
02-12-2012
2.00
Installed Hyd PSI Switches
Details
02-12-2012
2.00
Hyd Pressure Guage installed
Details
01-15-2012
2.00
Installed Hydraulic Lines from Switching Valve
Details
01-14-2012
1.00
Installed Rear Canopy Prox Sensor
Details
01-14-2012
4.00
Installed Hyd Switching Valve
Details
01-02-2012
1.50
Tightened all the Swegelok Fittings and installed
Details
01-02-2012
2.00
Fabricated Canopy Lock Prox Switch Brackets
Details
12-29-2011
6.00
Installed Hydraulic Tubing
Details
12-28-2011
2.00
Installed Emergency Blow down Valve
Details
12-27-2011
2.00
Wired Jumpers On to MLG Controller
Details
12-27-2011
2.00
Installed Grounding Black and Power Block
Details
10-05-2008
10.00
Installation of MLG
Details
SITE NAVIGATION
Contact Builder
BEZJet Home
Category
# Logs
# Hours
All
284
1426
Aileron
4
8
Antenna
2
4
Brakes
3
18
Canopy
29
211
Cockpit
15
46
Electrical
11
64
Engine
9
85
Firewall
3
5
Flight Controls
6
9
Fuel Sump
1
2
Fuel System
18
41
Fuselage
40
340
Intake
13
99
Miscellaneous
3
17
MLG
17
50
Motor Mount
2
52
Nose
2
8
Nose Landing Gear
5
16
Rudder
16
44
Speed Brake
1
3
Strakes
42
168
Winglet
38
110
Wings
4
26
Copyright © 2001-2024 Matronics. All Rights Reserved.