KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
Work Logs Found: 29
Category Work Time: 211 Hours
 Date
Hours
Work Log Summary

Details

 09-18-2011
10.00
Fabricated Upper Rear Canopy Latch Assembly
Details
       

 09-11-2011
8.00
Completed Lower Rear Canopy Barrel Latch Assemboly
Details
       

 09-05-2011
3.00
Roll Over Structure
Details
       

 09-05-2011
8.00
Completed Front Canopy Latch Attachments
Details
       

 09-02-2011
2.00
Front Canopy Rail Pin instalation
Details
       

 09-02-2011
5.00
Front Canopy Latch Installation
Details
       

 08-27-2011
5.00
Inserted Hood Pins to act as Canopy Bow Guides
Details
       

 08-21-2011
5.00
Attached Rollover Structure
Details
       

 12-11-2010
13.00
Completed Rear Canopy Front Bow
Details
       

 08-29-2010
1.00
Assembled Canopy Locking Mechanism
Details
       

 08-21-2010
6.00
Filling gap between Roll over Structure and Rear F
Details
       

 07-26-2010
2.00
Installed Rear Canopy pneumatic shocks onto Longer
Details
       

 07-25-2010
5.00
Installed Longeron Hardpoint Mounts for pneumatic
Details
       

 07-24-2010
4.00
Installed Pneumatic Shock Hard Points
Details
       

 07-13-2010
5.00
Mounting Rear Canopy on Hinge
Details
       

 06-03-2010
4.00
Inside Layup forRear Canopy Bow
Details
       

 05-30-2010
12.00
Installing Rear Canopy Hinge
Details
       

 03-27-2010
8.00
Installed Pheumatic Actuators on Front Canopy
       

 03-20-2010
12.00
Completed the Rear Canopy Fire Wall Rollover struc
Details
       

 03-08-2010
15.00
Final Fit and installation of Front Canopy and Sho
Details
       

 02-28-2010
10.00
Installing Front Canopy Hinge
Details
       

 06-13-2009
8.00
Adding Roving and sealing Canopy Bow
Details
       

 05-23-2009
6.00
Cut Canopy front and Rear
Details
       

 05-16-2009
10.00
Completeding Ouside Rollover Structure Layup
Details
       

 05-09-2009
5.00
Cutting and Removing Plexiglass
Details
       

 04-25-2009
10.00
Final inside Layp for the Canopy Roll Over Structu
Details
       

 04-11-2009
10.00
Vaccume Bagging the Canopy Roll Over structure
Details
       

 09-21-2008
4.00
Prepairing Canopy Rails for Glassing
Details
       

 07-26-2007
15.00
Jigging canopy and preparing foam for glassing
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.