BEZJet Build
Work Logs Found: 40
Category Work Time: 340 Hours
 Date
Hours
Work Log Summary

Details

 09-07-2015
10.00
Finishing the AP Bottom
Details
       

 10-18-2014
6.00
Finishing the bottom Left Strake
Details
       

 09-27-2014
8.00
Hell hole cover
Details
       

 09-13-2014
10.00
Finishing the Right Bottom Strake
Details
       

 09-06-2014
12.00
Finishing the Bottom
Details
       

 06-07-2014
12.00
Filling the Right side of the airplane
Details
       

 05-31-2014
10.00
Finishing the Bottom of the plane
Details
       

 05-17-2014
4.00
Finishing the Bottom
Details
       

 04-05-2014
2.00
Farring in Motor Mount hard points
Details
       

 04-05-2014
6.00
Fairing in Hell hole
Details
       

 03-01-2014
3.00
Flipping the plane
Details
       

 01-12-2014
1.00
Trail Fitting the Strake tops
Details
       

 04-21-2013
2.00
Glassed the Rear Cockpit Seat
Details
       

 04-20-2013
2.00
Installed both Wings
Details
       

 03-10-2013
0.50
Picture of the Progress
Details
       

 08-25-2012
5.00
Fitting Front Canopy Deck
Details
       

 09-19-2011
3.00
Installed Rear Canopy and Strake Opening Modified
Details
       

 09-05-2011
1.00
A look at a Cool Airplane
       

 10-27-2007
10.00
Mounting Thrust Vector Control Unit
Details
       

 10-20-2007
8.00
Conduit Run for Wires and controls
Details
       

 09-27-2007
5.00
Installed Nose Door Hinge
Details
       

 09-09-2007
10.00
Completion of outside glassing and Canopy Removl f
Details
       

 08-01-2007
5.00
Installed Hydralic Pump for Retractable MLG System
Details
     

 07-05-2007
1.00
Mock Up of Variable Thrust Controler and Throttle
Details
       

 06-06-2007
8.00
Installing Bracked and Pulleys on Firewall
Details
       

 06-01-2007
10.00
Installation of Firewall
Details
       

 05-01-2007
10.00
Modification of Lower Motor Mount Hard Points
Details
       

 04-14-2007
15.00
Modification of Upper Motor Mount Hard Points
Details
       

 04-07-2007
40.00
Modification of C-Spar to Accomodate Infinity Retr
Details
       

 04-01-2007
3.00
Removal of Old Firewall
Details
       

 01-20-2001
10.00
Attached Canard Ferring
Details
       

 01-18-2001
20.00
Installed Bearkut Nose
Details
       

 05-07-1998
12.00
Engine Hard Point Mount Fabrication
       

 04-08-1998
5.00
Installation of Electrict Speed Brake Actuator
Details
       

 04-07-1998
8.00
Fire Wall Mounted 1
Details
       

 04-07-1998
6.00
Center Section Spar Floxed to Fusalage Left
Details
     

 04-24-1984
5.00
Carving Depression in fuselage floor
       

 04-20-1984
6.00
Continued assymboly of fuselage sides
       

 03-10-1984
40.00
Building and assymboling the fuslage
Details
       

 03-01-1984
6.00
Laying up the Inside Face of the LH Fuselage side
Details
     