Bills Web Site
LNC4
Landing Gear
Work Logs Found:
11
Category Work Time:
100 Hours
Date
Hours
Work Log Summary
Details
02-05-2011
4.00
Nose gear door switch
Details
12-05-2010
6.00
Nose gear doors
Details
12-04-2010
6.00
Nose gear door
Details
12-02-2010
5.00
Nose gear door body work
Details
12-01-2010
4.00
Nose gear door
Details
11-30-2010
7.00
Alignment tabs
Details
11-28-2010
3.00
Nose gear alignment tabs
Details
11-08-2010
15.00
Brakes
Details
11-01-2010
20.00
Hydraulic actuator installation
Details
10-25-2010
25.00
Nose gear doors
Details
09-28-2010
5.00
Installed nose gear
Details
SITE NAVIGATION
Contact Builder
S6-S Home
LNC2 Home
LNC4 Home
Category
# Logs
# Hours
All
831
6961
Aircraft Kit
4
30
Assembly
4
36
Avionics
10
256
Doors
2
47
Electrical
45
364
Empennage
73
526
Engine
41
374
Firewall Forward
3
77
Flight controls
2
35
Flight controls
8
192
Fuel
3
77
Fuel System
111
697
Fuselage
255
1545
Hardware
2
47
Hydraulics
17
125
Instrument Panel
25
241
Insturment Panel
4
26
Landing Gear
11
149
Misc.
1
4
Miscellaneous
9
189
Paint
92
758
Panel
2
21
Paperwork
1
0
Weight & Balance
1
9
Wings
105
1136