Powered By Kitlog Pro v2.0
RV12 Kit Web Site
RV 12
Empennage/Tail Cone
Work Logs Found:
44
Category Work Time:
132 Hours
Date
Hours
Work Log Summary
Details
08-20-2012
1.50
Trim servo wire connectors
Details
02-24-2012
1.00
Trim bracket update
Details
02-16-2011
3.50
Fitting Horizontal Stabilator to Tail Cone
Details
01-16-2011
1.50
Temporarily Attach Rudder
Details
01-12-2011
2.50
Attach Verticle Stabilator to Tail Cone
Details
01-11-2011
3.00
Finish Rivet Tail Cone
01-05-2011
0.50
Clecoed Top Rib to Top Skin for Rudder Atachment.
Details
01-05-2011
0.50
Added Skin Doubler to Top Skin.
Details
01-04-2011
4.50
Top Skin Clecoed on.
Details
11-18-2010
2.45
Upper right skin attached.
Details
11-18-2010
2.50
Install Static Ports
Details
11-16-2010
3.25
Clecoed the upper left side skin
Details
11-15-2010
1.00
Ran control line strings and Trim wiring.
Details
11-15-2010
2.50
Install right and left static ports.
Details
11-12-2010
1.50
Replace 2 rivets and cleco Bulkhead to Empanage
Details
07-11-2010
0.05
07-10-2010
8.50
Start assembly of tailcone area
Details
07-08-2010
3.50
Attached stiffiners to bottom tailcone skins
Details
06-29-2010
2.50
Bulkhead for rear of tailcone
Details
06-27-2010
1.50
Forward Skin Rib
Details
06-25-2010
2.50
Started to asemble the skeleton of the tail cone.
Details
06-25-2010
3.00
Match drill AFT hinges and finish rivets
Details
06-23-2010
3.00
More deburring to do.
Details
06-22-2010
3.00
Replacement Hinges
Details
06-15-2010
1.50
Counter ballance arm and weights.
Details
06-11-2010
5.00
Prepped small parts for Tail Cone
Details
06-11-2010
0.00
Laid out Tail Cone parts
Details
06-07-2010
6.50
Cleco skin to horizontal stabilizer and begin rive
Details
06-05-2010
7.50
Horizontal Stabilizer
Details
06-03-2010
5.50
Spar Box for Horizontal Stabilizer
Details
05-31-2010
2.50
Anti Servo Tab
Details
05-21-2010
3.50
AST Half Done
Details
05-19-2010
3.00
AST
Details
05-17-2010
6.50
Rudder assembly
Details
05-14-2010
1.50
Repair nutplate for front skin of Tail.
Details
05-13-2010
4.00
Rivet Tail Skin to skeleton
Details
05-11-2010
3.50
Dimple tail skins and final drill.
Details
05-07-2010
4.50
Rear spar and rib rivet job.
Details
05-06-2010
2.50
Rear spar primed.
Details
05-04-2010
2.25
Upper spar caps
Details
05-04-2010
3.50
Rear spar trial fitting.
Details
05-04-2010
2.50
Countersink
Details
04-24-2010
3.50
Hinge rebuild and prime job.
Details
03-31-2010
3.50
Checking fit of hinges for Verticle Stabilator
Details
SITE NAVIGATION
Contact Builder
RV 12 Home
Category
# Logs
# Hours
All
62
172
Clean Up
1
EAA Technical Counse
1
0
Empennage/Tail Cone
44
132
Time Out to help dau
1
Tools
1
2
Wife list
1
Wings
7
27
Workshop
6
11
Copyright © 2001-2025 Matronics. All Rights Reserved.