Powered By Kitlog Pro v2.0
Vans RV6
RV6
G. Fuselage
Work Logs Found:
111
Category Work Time:
233 Hours
Date
Hours
Work Log Summary
Details
12-23-2011
10.00
Fuselage Primed
12-23-2011
10.00
Fuselage Painted
12-23-2011
10.00
Fuselage Painted
12-15-2011
10.00
Fuselage Paint Preparation
11-01-2011
1.00
Cut Hole For Flap Actuator
09-28-2011
4.00
Temporary Fit Of Wings
07-01-2011
3.00
Final preparation forward deck after wiring.
06-06-2011
1.00
Firewall modification for cable bulkhead fitting.
Details
03-02-2011
2.00
Panel Cutout 2
02-13-2011
2.00
Panel - Final Cut
Details
01-12-2011
8.00
Forward Fuselage
01-05-2011
6.00
Cabin Interiour Structure 2
01-04-2011
6.00
Cabin Interiour Structure
12-28-2010
3.00
Control Rods
Details
12-17-2010
1.00
Drilled Seat Ribs
12-14-2010
1.00
Rear Cabin Seat Belt Guides
12-14-2010
1.00
Fitted Master Cylinders For Duel Brake
12-13-2010
1.00
Temp Fitting Of Tail Wheel Springs
12-13-2010
1.50
Rudder Stop
12-12-2010
1.00
Rudder Pedal Fitting
12-05-2010
1.50
Brake Pedal Fitting
11-01-2010
4.00
Wing ALignment Continued
11-01-2010
0.50
Rudder Cable Fitting
11-01-2010
6.00
Fitted Wings For Alignment
10-19-2010
1.00
Installed Rudder Cable
10-18-2010
1.00
Some Fun In The Shop
Details
10-18-2010
2.00
Rear Turtle Deck
10-18-2010
1.00
Rear Top Skins Cleckoed
10-18-2010
2.00
Rear Top Skins
10-18-2010
1.00
Rear Canopy Skin Structure
10-18-2010
0.50
Interiour ready for painting,
10-18-2010
2.50
Installed Static Kit - Hose
10-18-2010
1.00
Installed Static Kit
10-18-2010
3.00
Installation Turtle Deck
10-18-2010
1.00
Finish Bottom Skins
10-18-2010
1.00
Empennage Stiffners
10-13-2010
3.00
Empennage Attatch Section
10-11-2010
1.00
Seat Rear Brace
10-11-2010
2.00
Empennage Attach Area
10-10-2010
2.00
Level Stand
Details
10-10-2010
1.20
Installed Aft Cockpit Section
10-10-2010
1.00
Fitted Control Assembly For Movement Test
10-09-2010
2.00
Engine Stand
Details
10-02-2010
0.50
General Tidy Up Of Rivets
10-01-2010
1.00
Preparation Reat Turtle Deck
10-01-2010
1.00
Further Tidy Up Fuse Rear End
09-04-2010
0.50
MILESTONE. The fuse says goodbuy to the Jig.
09-04-2010
0.50
Manufactured the elevator bel crank.
09-02-2010
1.50
Seat Bottoms.
Details
09-02-2010
2.50
Rear Baggage Cabbin Fitted
09-02-2010
0.20
Look from right side up.
Details
09-02-2010
1.50
External Air
Details
09-02-2010
3.00
Bottom Skins Rivetred On.
Details
09-02-2010
3.00
656 Gussets bent, primed & fitted.
08-30-2010
2.00
Engine Stand
Details
08-17-2010
1.00
Riveting On Right Side Skin
08-08-2010
1.50
RHS Side Skin Finishing
Details
08-07-2010
3.00
RHS Side Skin Preparation
07-31-2010
0.50
Bolted In Seat Belt Brackets
07-30-2010
1.00
Assembled Seat Parts
07-09-2010
0.50
Filed Groove Out For Bottom Hinge
07-03-2010
0.50
Side Skin Preparation
06-26-2010
1.00
Bottom Skin Prepared
06-26-2010
1.00
Bottom Skin Fitted
06-26-2010
0.50
Bolts Fitted To Forward Fuse
06-24-2010
1.00
Seat Backs Started
06-24-2010
2.00
Seat Back Stiffners
06-24-2010
3.00
Floor Skin Assembly
06-24-2010
0.50
Fiited Floor Skin For Alignment
06-23-2010
1.00
Floor Skin
06-22-2010
4.00
Floor Skin Stiffners
05-30-2010
1.50
Brake & Rudder Pedal Assembly
05-25-2010
1.00
Rudder Pedal Assembly
05-24-2010
2.00
Brake Pedal Assembly
05-05-2010
1.50
Rear Inspection Holes
05-01-2010
3.00
Family Affair
Details
05-01-2010
2.00
Assembled Forward Fuselage
04-30-2010
3.00
Rear Tail Cone Preparation
04-30-2010
3.00
Rear Skinning
04-30-2010
1.00
Cleaned & Primed Forward Fuselage Parts
04-30-2010
2.00
Bottom Rear Skin Preparation
04-26-2010
3.00
Manufactured forward fuselage braces & gussets
04-26-2010
1.00
Drilled holes for control stick mounts & put in pl
04-10-2010
2.00
Fusellage Assembly
04-09-2010
0.50
Tailwheel Assembly Attatched.
04-08-2010
3.00
Seat & Floor Rib Assembly
04-08-2010
2.00
Initial Assembly & Alignment - Bulkheads
04-08-2010
1.00
Baggage Compartment Cont.
04-08-2010
1.00
Adjustments - Middle Floor Ribs
04-07-2010
0.50
Longerons riveted to firewall.
04-07-2010
1.00
Further Work F605
04-07-2010
2.00
Floor Ribs
04-07-2010
1.00
F604 Bulkhead Assembly
04-07-2010
1.00
F-605 Bulkhead Primed & Assembled
04-06-2010
4.00
Tail Section Bulkheads Primed & Put Together
04-05-2010
3.00
Longerons Bent To Shape
04-05-2010
0.50
Fuselage Jig Leveled
04-03-2010
3.00
Stringers Attached
04-02-2010
0.50
Other Bulkkheads More
04-02-2010
0.50
Other Bulkkheads More
04-02-2010
4.00
Other Bulkheads
04-01-2010
4.00
F605 Bulkhead
03-22-2010
3.00
F606, 607 & 608
Details
03-08-2010
2.00
Firewall Clecoed & Riveted Together
03-08-2010
0.50
Firewall Assembled
03-08-2010
1.00
Firewall Aluminium Parts Primed.
03-07-2010
1.00
Firewall Various Parts Formed
Details
03-07-2010
1.00
Firewall Stiffners Put In Place
03-06-2010
0.60
Fuselage Jig Assembled
Details
03-01-2010
1.50
Firewall Pats Put Together
02-28-2010
0.50
Fuselage Started - Plans Open
SITE NAVIGATION
Contact Builder
RV12 Home
RV6 Home
Category
# Logs
# Hours
All
364
1231
A. Pre Planning
7
16
B. The Shed
4
4
C. Tools
3
1
D. Order & Shipping
2
1
E. Empennage
11
210
F. Wings
152
371
G. Fuselage
111
238
H. Finisheing & FWF
22
118
I. Engine
9
16
K. Wiring & Electric
12
195
L. Fuel System
1
1
LINKS
8
1
M Final Assembly
7
43
Maintenance Inspecti
3
0
Milestones
8
15
Miscellaneous
3
1
Shop Supplies
1
0
Copyright © 2001-2025 Matronics. All Rights Reserved.