Powered By Kitlog Pro v2.0
JOE'S WEB SITE
Zodiac 601 XLB
Wings
Work Logs Found:
54
Category Work Time:
214 Hours
Date
Hours
Work Log Summary
Details
04-14-2018
20.00
Wing Installation
Details
04-06-2018
1.00
Attached Aileron Stop to Left Wing
03-31-2018
1.00
Final Trim and Fitting
03-30-2018
1.00
Check N601GE for bolt access hole
03-29-2018
1.00
Complete Skin Trim to Fit
07-10-2017
3.00
Attempt to set limits for flap acutator.
Details
09-28-2011
3.00
Riveted rear wing skin.
09-26-2011
2.00
Corrosion proofed and clecoed wing skin on.
Details
09-21-2011
3.00
Connected Aileron and attached flap to right wing.
09-19-2011
6.00
Backup Pitot Static & Aileron Control Rod Access
Details
09-01-2011
3.00
Added the hinge to the right flap.
08-26-2011
2.00
Conversion of hingeless aileron to piano hinge.
07-09-2011
2.00
Removed clecos and riveted nose skin on right wing
06-29-2011
3.00
Fabricated a maint/inspection panel
Details
06-28-2011
4.00
Remove clecos and fuel filler from top nose skin
Details
06-27-2011
3.00
Nose Skin holes for fuel vent and drain.
Details
06-02-2011
6.00
Wing Right Spar & Rib Upgrade
Details
06-01-2011
2.00
Clecoed skins on to drill added extrusion to spar
05-20-2011
4.00
Extrusion and doubler bolted on.
Details
05-05-2011
2.00
Right Wing Upgrade
Details
05-04-2011
3.00
Removed spar rivets and positioned the new doubler
04-26-2011
3.00
Removed Front and Top Skins
Details
04-22-2011
2.00
Completed Wing Riveting.
Details
04-21-2011
8.00
Clecoed every other hole and began riveting.
04-20-2011
6.00
Cleaning and electrical tests prior to closing.
04-19-2011
4.00
Flap permanently attached to left wing
Details
04-18-2011
6.00
Began Flap and Aileron Permanent Attachment.
04-14-2011
5.00
Attached Ailerons and Flaps
Details
04-12-2011
7.00
Aileron Control and AOA-Pitot Tube
04-11-2011
6.00
Complete Aileron Balance
04-05-2011
5.00
Installed Aileron Trim
Details
03-23-2011
4.00
Finish structure changes for aileron Upgrade
Details
03-22-2011
4.00
Aileron Trim and Upgrade to trim servo
03-18-2011
3.00
Aileron Trim & Upgrade
Details
03-16-2011
4.00
Aileron Trim & Hingeless to Hinge Conversion
Details
03-02-2011
3.00
Fuel Tank inspection cover & Fuel Level Sender
03-02-2011
3.00
Completed Inspection Cover for Fuel Tank End
Details
03-01-2011
3.00
Riveting doublers behind old nose rib 2 & holes.
Details
02-25-2011
4.00
New Fuel Tank Work and Access Holes for PushPull T
02-24-2011
3.00
Started Push/Pull Aileron Control
02-23-2011
3.00
Bellcrank & upper and lower L enhancements.
Details
02-22-2011
3.00
Began installing L angles spanwise on bottom of ri
02-21-2011
5.00
Added L angles between ribs 6 & 7 and #4 to Tip
Details
02-19-2011
2.00
Now 6-ZU-1 is complete.
02-16-2011
6.00
Nearly Completed 6-ZU-1 and began 6-ZU-3a
Details
02-13-2011
6.00
Bolted Spar Doubler vice solid rivets.
02-12-2011
6.00
Add nose rib angles.
Details
02-10-2011
7.00
Add nose angles to nose ribs 1 through 3.
02-10-2011
1.00
Add nose angles to nose ribs 1 through 3
02-04-2011
5.00
Upgrade Wing
Details
02-03-2011
7.00
Upgrade Wing
Details
02-02-2011
3.00
Upgrade Left Wing
Details
01-30-2011
1.00
Moved wing into little hangar for upgrade
03-30-2010
0.50
Consult with Roger Dubbert
Details
SITE NAVIGATION
Contact Builder
Zodiac 601XLb Tail Dragger Home
Zodiac 601 XLB Home
Category
# Logs
# Hours
All
512
2059
Airframe
9
37
Auto Pilot
8
34
Avionics
25
108
Brakes
8
19
Canopy
51
131
Control System
33
112
Cowl
1
1
Electrical
15
42
Empennage
30
124
Engine
25
76
Entire Plane
1
11
Fuel System
10
37
Fuselage
121
678
FWF
34
96
Landing Gear
8
27
Lights
4
8
Miscellaneous
25
117
Painting
12
23
Paper Work
1
2
Pitot/Static
4
13
Post Const Insp
6
17
Prop
3
12
Propeller
1
3
Shop Supplies
1
40
Spinner
2
4
Tools
2
3
Upgrade
14
43
Wings
54
214
Wire
3
15
Work Bench
1
12
Copyright © 2001-2024 Matronics. All Rights Reserved.