Powered By Kitlog Pro v2.0
Colin Cameron - Skybolt build
Skybolt Delta
Empennage
Work Logs Found:
31
Category Work Time:
100 Hours
Date
Hours
Work Log Summary
Details
12-02-2010
8.00
Install nut plates on servo tab spars
Details
12-01-2010
3.00
Start hinging 1st servo tab
Details
11-30-2010
4.00
Start 1st Servo/Trim Tab
Details
11-21-2010
3.00
Finish second elevator tip
Details
11-20-2010
2.00
Jig second elevator and stabilizer
Details
11-19-2010
3.00
Finish elevator tip
Details
11-18-2010
5.00
Finish weld stabilizer and repeat for second
Details
11-17-2010
4.00
Fit tip ribs and cut stabilizer spar to match
Details
11-16-2010
2.00
Fit stabilizer ribs to jig
Details
11-15-2010
3.00
Shape leading edges of stabilizer
Details
11-14-2010
3.00
Prepare Stabilizer jig
Details
11-13-2010
6.00
Repeat process for second elevator
Details
05-03-2010
4.00
Finish weld elevator
Details
05-02-2010
3.00
Fit ribs and trailing edge to elevator
Details
04-29-2010
2.00
Shape leading edge
Details
04-28-2010
2.00
Fit elevator ribs to leading edge
Details
04-27-2010
3.00
Layout elevator on building table and prepare jig
Details
04-25-2010
3.00
Finish weld rudder
Details
04-18-2010
3.00
Cut and fit rudder ribs and trailing edge
Details
04-07-2010
2.00
Fabricate Stab Wire Attach Straps
Details
04-06-2010
4.00
Fabricate Elevator Horns
Details
04-05-2010
4.00
Fabricate Rudder Horn
Details
04-04-2010
2.00
Prepare rudder jig and fit ribs to rudder post
Details
04-03-2010
2.00
finish cutting hinges and then ream to size
Details
04-02-2010
4.00
Cut hinges from blanks and dress edges
Details
04-01-2010
1.00
Make jig to hold hinges for dressing
Details
03-31-2010
3.00
Weld tubing to form hinge blanks
Details
03-30-2010
2.00
Shape top of rudder post
Details
03-30-2010
1.00
Draw Rudder Horn in DeltaCAD
Details
03-29-2010
3.00
Shape rudder trailing edge and cut front post
Details
03-28-2010
6.00
Prepare table for rudder construction
Details
SITE NAVIGATION
Contact Builder
Skybolt Delta Home
Category
# Logs
# Hours
All
190
535
Cabane
6
21
Control Systems
31
103
Empennage
31
100
Fittings
9
20
Fuselage
72
168
Landing Gear
26
85
Rudder Pedals
10
31
Tools
5
7
Copyright © 2001-2024 Matronics. All Rights Reserved.