Powered By Kitlog Pro v2.0
Rob's REBVAIR Project
REBVAIR
controls
Work Logs Found:
22
Category Work Time:
137 Hours
Date
Hours
Work Log Summary
Details
03-16-2022
2.00
safetying hardware and turnbuckles
Details
01-11-2020
2.00
elevator control tuning and stops
Details
12-07-2019
4.00
Torque tube final install
Details
03-17-2019
4.00
flaperon controls (Part 2)
Details
03-16-2019
4.00
flaperon controls (Part 1)
Details
06-20-2018
8.00
Pitch Servo Install: part 4
Details
01-24-2017
6.00
Elevator fiberglass tips: part 2
Details
01-22-2017
7.00
Elevator fiberglass tips: part 1
Details
01-15-2017
4.00
Elevator controls
Details
06-25-2016
3.00
Rudder pedal install
Details
09-07-2015
2.00
Elevator Trim Part 2: panel wiring
Details
08-29-2015
2.00
Elevator Trim Part 1: wire routing
Details
08-13-2013
6.00
right side torque tube
Details
08-11-2013
5.00
Torque Tube Fitting
Details
03-20-2011
10.00
elevator pushrod exit holes and fairings
Details
12-04-2010
8.00
Flap Handle
10-16-2010
6.00
Rudder Cable guides (part 1)
Details
10-15-2010
10.00
Rudder Cable exit holes (part 2)
Details
10-10-2010
20.00
Rudder cable exit holes (part 1)
Details
03-13-2010
10.00
Mixer arm et al.
Details
03-06-2010
4.00
Control column
Details
02-06-2010
10.00
Control column assembly
Details
SITE NAVIGATION
Contact Builder
REBVAIR Home
Category
# Logs
# Hours
All
283
1774
control surfaces
4
51
controls
22
137
Cowling
22
108
elevator install
4
17
Empennage
7
86
Engine
5
10
engine accessories
3
8
Firewall Forward
48
365
Fuselage
74
450
gear install
10
86
General
4
58
Instrument Panel
48
217
paint
1
5
Panel
1
2
Parachute
11
41
Prop
1
2
Wing
9
57
wing install
9
74
Copyright © 2001-2024 Matronics. All Rights Reserved.