KitLog pro

Powered By Kitlog Pro v2.0

Rob's REBVAIR Project
Work Logs Found: 22
Category Work Time: 137 Hours
 Date
Hours
Work Log Summary

Details

 03-16-2022
2.00
safetying hardware and turnbuckles
Details
     

 01-11-2020
2.00
elevator control tuning and stops
Details

 12-07-2019
4.00
Torque tube final install
Details
       

 03-17-2019
4.00
flaperon controls (Part 2)
Details

 03-16-2019
4.00
flaperon controls (Part 1)
Details
       

 06-20-2018
8.00
Pitch Servo Install: part 4
Details
       

 01-24-2017
6.00
Elevator fiberglass tips: part 2
Details
       

 01-22-2017
7.00
Elevator fiberglass tips: part 1
Details
       

 01-15-2017
4.00
Elevator controls
Details

 06-25-2016
3.00
Rudder pedal install
Details
       

 09-07-2015
2.00
Elevator Trim Part 2: panel wiring
Details
       

 08-29-2015
2.00
Elevator Trim Part 1: wire routing
Details
       

 08-13-2013
6.00
right side torque tube
Details
       

 08-11-2013
5.00
Torque Tube Fitting
Details
       

 03-20-2011
10.00
elevator pushrod exit holes and fairings
Details
       

 12-04-2010
8.00
Flap Handle
     

 10-16-2010
6.00
Rudder Cable guides (part 1)
Details
       

 10-15-2010
10.00
Rudder Cable exit holes (part 2)
Details
       

 10-10-2010
20.00
Rudder cable exit holes (part 1)
Details
       

 03-13-2010
10.00
Mixer arm et al.
Details
       

 03-06-2010
4.00
Control column
Details
     

 02-06-2010
10.00
Control column assembly
Details
 










Copyright © 2001-2024 Matronics. All Rights Reserved.