Powered By Kitlog Pro v2.0
Brent s RV-8 Project N784DE
RV-8
Firewall Forward
Work Logs Found:
131
Category Work Time:
219 Hours
Date
Hours
Work Log Summary
Details
03-31-2011
0.90
Hose protection
Details
03-13-2011
1.20
Baffle sealing #2
Details
03-12-2011
0.70
Sniffle valve / Mixture arm finished
Details
03-12-2011
0.50
Sealing the baffling
Details
03-10-2011
0.50
Sniffle Valve install
Details
03-09-2011
1.30
Fuel Pump Safety Wire and Drain
Details
02-24-2011
1.00
Tach Drive Cover / Engine controls final
Details
02-23-2011
1.40
Adel Clamping bliss/Engine Controls final
Details
02-22-2011
1.00
Adel clamping bliss
Details
02-20-2011
1.00
Throttle rigging - the solution
Details
02-13-2011
3.60
Oil Breather Vent + FWF Finsihing
Details
01-30-2011
1.10
Wiring Hobbs Pressure Switch
Details
01-29-2011
1.40
More Engine Control Rigging Fun...
Details
01-28-2011
1.00
Engine Control Cable Rigging continued...
Details
01-27-2011
1.70
Engine Control Cable Rigging / Hobbs Switch
Details
01-26-2011
0.70
Magneto leads #6
Details
01-25-2011
1.10
Magneto leads #5
Details
01-23-2011
3.90
Engine wiring #6 +
Details
01-22-2011
2.60
Magneto leads #4 and Current limter
Details
01-21-2011
1.00
Magneto leads #3
Details
01-20-2011
1.00
Magneto leads #2
Details
01-19-2011
1.00
Magneto leads #1
Details
01-18-2011
1.20
Heat shield/Exhaust Hanger/Canopy
Details
01-17-2011
1.10
Magnetor Vibrator Mounting +
Details
01-16-2011
1.10
Fuel Flow Sensor / RPM Sensor
Details
01-15-2011
4.50
Misc FWF (fuel lines and fat wires)
Details
01-15-2011
1.00
Fuel Lines / Mags / Vernatherms
Details
01-14-2011
1.40
Fuel System FWF #2
Details
01-12-2011
1.00
Engine Wiring #5
Details
01-11-2011
1.50
Engine Wiring #4
Details
01-10-2011
1.00
Engine Wiring #3
Details
01-09-2011
1.20
Engine Wiring #2
Details
01-08-2011
2.90
Engine Wiring #1
Details
01-06-2011
1.00
Baffling #37 / Dipstick Tube re-install
Details
01-05-2011
0.30
Engine Mounts/Baffling #36
Details
01-04-2011
1.40
Baffling #35/Cabin Heat Scat/Engine Mounts
Details
01-04-2011
1.00
Baffling #34
Details
01-03-2011
1.20
Cabin Heat Muff Install
Details
01-02-2011
2.60
Optional Oil Filter Install
Details
12-24-2010
1.70
Baffling #33 + (engine attach hardware/oil filter)
Details
12-23-2010
1.40
Baffling #32
Details
12-22-2010
1.00
Baffling #31
Details
12-21-2010
2.00
misc FWF (oil lines / baffling)
Details
12-20-2010
0.50
Oil System FWF #8
Details
12-19-2010
1.80
Oil System FWF #7
Details
12-19-2010
2.70
Crankshaft drive bushing #3
Details
12-18-2010
0.00
misc FWF (removing prop bushings, fittings for red
Details
12-18-2010
0.00
misc FWF (blast tubes)
Details
12-18-2010
0.00
Misc FWF (alt air, avionics acces pics)
Details
12-18-2010
3.50
Misc FWF
Details
12-14-2010
1.00
Oil System FWF #6
Details
12-12-2010
4.40
Engine control rigging
Details
12-11-2010
1.10
Misc FWF
Details
12-05-2010
3.30
Alternate air/Cowling Nutplates
Details
12-04-2010
3.60
Cabin Heat / Engine Probes
Details
12-03-2010
0.70
Oil System FWF #5
Details
12-01-2010
0.50
Oil System FWF #4
Details
11-30-2010
2.80
Oil System FWF #3
Details
11-29-2010
1.90
Oil System FWF #2
Details
11-26-2010
1.30
Oil System FWF #1
Details
11-26-2010
2.50
Fuel System FWF #2
Details
11-25-2010
0.90
Fuel System FWF #1
Details
11-25-2010
2.80
Engine Control Cables 1
Details
11-24-2010
1.10
Baffling #28 +
Details
11-23-2010
1.60
Baffling #27
Details
11-22-2010
1.10
Baffling #26
Details
11-21-2010
3.20
Baffling #25
Details
11-20-2010
3.60
Baffling #24
Details
11-19-2010
1.10
Baffling #23
Details
11-18-2010
1.50
Baffling #22
Details
11-17-2010
1.80
Baffling #21
Details
11-16-2010
1.50
Baffling #20
Details
11-15-2010
1.00
Baffling #19
Details
11-14-2010
2.10
Baffling #18
Details
11-13-2010
4.70
Baffling #17
Details
11-12-2010
1.50
Baffling #16
Details
11-11-2010
2.50
Baffling #15
Details
11-10-2010
1.30
Baffling #14 (thermonuclear proof oil cooler)
Details
11-09-2010
1.60
Baffling #13 (thermonuclear resistance)
Details
11-08-2010
4.00
Baffling #12
Details
11-07-2010
1.20
Baffling #11
Details
11-06-2010
3.30
Baffling #10
Details
11-05-2010
1.60
Baffling #9 (1800 hr mark)
Details
11-04-2010
1.80
Baffling #8
Details
11-03-2010
0.50
Baffling #7
Details
11-02-2010
1.10
Baffling #6
Details
10-31-2010
1.60
Snorkel #12
Details
10-28-2010
1.00
Snorkel #11
Details
10-27-2010
0.30
Snorkel #10
Details
10-26-2010
1.10
Snorkel #9
Details
10-25-2010
1.10
Snorkel #8 and Baffle #5
Details
10-24-2010
3.80
Snorkel #7
Details
10-23-2010
3.70
Snorkel #6
Details
10-22-2010
0.80
Snorkel #5
Details
10-21-2010
1.00
Snorkel #4
Details
10-19-2010
1.50
Snorkel #3
Details
10-18-2010
2.50
Snorkel #2
Details
10-17-2010
0.60
Snorkel #1
Details
10-17-2010
2.30
Baffling #4
Details
10-16-2010
3.50
Baffling #3 (fitting...still)
Details
10-15-2010
1.70
Baffling #2 (baffled and going snorkleing)
Details
10-14-2010
3.30
Baffling #1 (initial fitment)
Details
08-21-2010
1.70
Oil tank line
Details
08-18-2010
1.70
Cabin Heat Mixer #2
Details
07-26-2010
1.00
Prop Install
Details
07-25-2010
4.70
Crankshaft drive bushings
Details
07-25-2010
0.50
Crankshaft drive bushing #2
Details
07-24-2010
1.90
Crankshaft rear plug install
Details
07-09-2010
1.00
Removing the old baffling
Details
07-08-2010
0.00
Engine grief
Details
06-17-2010
0.50
Removed stubborn fitting (conversion to C/S prop)
Details
06-12-2010
4.00
Spinner and prop
Details
06-12-2010
0.00
Prop
Details
06-11-2010
1.10
Spinner #2
Details
06-10-2010
1.20
Conversion to C/S and Spinner
Details
06-08-2010
2.30
Mixture bracket
Details
06-07-2010
1.20
Throttle bracket +
Details
05-31-2010
4.50
Governor/Inverted Oil +
Details
05-31-2010
1.70
Alternator Install #1
Details
05-30-2010
4.50
Prop governor install #1
Details
05-29-2010
2.00
Exhaust install #3
Details
05-28-2010
0.80
Exhaust install #2
Details
05-27-2010
1.20
Exhaust Install #1
Details
05-26-2010
1.10
Intake tubes install
Details
05-25-2010
1.20
Oil pressure line complete and manifold mounted
Details
05-24-2010
0.60
Oil Pressure line
Details
05-23-2010
2.70
Engine installed
Details
05-23-2010
0.90
Cabin heat mixing box
Details
05-18-2010
1.20
Started assessing Firewall Forward components
Details
03-24-2010
1.20
Test fitted exhaust system
Details
03-23-2010
1.50
Hung engine
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1571
2427
About me
1
Avionics
1
2
BENCHMARKS
26
25
Elevators
38
51
Empennage
13
15
Engine
2
4
Finishing
352
646
Firewall Forward
131
219
Fuselage
431
586
Hints and Tips
1
Horizontal Stab
37
50
Inspiration
1
Instrument Panel
1
Miscellaneous
13
2
Paint
22
69
polishing
40
101
post construction mx
1
PROGRESS CHARTS
2
Rudder
16
24
Shop
1
Shop Supplies
1
Tools
7
Vertical Stabilizer
9
15
What is an RV8
1
Wings
315
407
Wiring
108
211
Copyright © 2001-2024 Matronics. All Rights Reserved.