KitLog pro

Powered By Kitlog Pro v2.0

Wendells RV-6A
Work Logs Found: 144
Category Work Time: 503 Hours
 Date
Hours
Work Log Summary

Details

 09-18-2024
3.00
Affix Experimental Placards
Details
       

 09-04-2024
3.00
Apply N Numbers to Fuselage
Details
       

 06-06-2024
4.00
Add Extenstions to Rudder Pedals
Details
       

 03-08-2024
7.00
Install Top Skin and Canopy
Details
       

 06-04-2021
3.00
Cushion brake line in fuselage
Details
       

 05-28-2021
2.00
Interior brake lines
Details
       

 05-28-2021
5.00
Copilot brake line
Details
       

 05-27-2021
8.00
Connect caliper to brake line
Details
       

 05-10-2021
8.00
Route brake lines
Details
       

 04-08-2021
4.00
Temporary fitting center console covers.
Details
       

 04-06-2021
4.00
Attach left tank to fuel line
Details
       

 04-05-2021
6.00
Run right fuel line into selector valve
Details
       

 03-31-2021
5.00
Run left fuel line into fuel selector
Details
       

 11-03-2020
3.00
Run Alternate Static Line Forward
Details
       

 08-26-2020
4.00
New leveling process when on its own wheels
Details
       

 08-24-2020
4.00
Add Center Floor F699s
Details
       

 08-06-2020
4.00
Wash off hangar grunge
Details
       

 08-05-2020
4.00
Set Fuselage on its gear permanently
Details
       

 07-15-2020
5.00
Attach left side F699
Details
       

 04-10-2018
4.00
Fuel Tank Attach Brackets to Fuselage
Details
       

 04-05-2018
1.00
Aileron Boots to Seal Fuselage Opening-3
Details
       

 03-29-2018
1.00
Aileron Boots to Seal Fuselage Opening-2
Details
       

 03-29-2018
3.00
Aileron Boots to Seal Fuselage Opening
Details
       

 03-06-2018
3.00
Remove Wood Spar
Details
       

 02-26-2018
0.00
Final Move to Airport Hangar 3
Details
       

 02-26-2018
4.00
Final Move to Airport Hangar 2
Details
       

 02-26-2018
4.00
Final Move to Airport Hangar
Details
       

 11-12-2015
2.00
Fit Forward Top Skin 3
Details
       

 11-12-2015
5.00
Fit Forward Top Skin 2
Details
       

 10-27-2015
0.00
Forward Fuselage Access Panels5
Details
       

 10-27-2015
6.00
Forward Fuselage Access Panels4
Details
       

 10-12-2015
0.00
Forward Fuselage Access Panels3
Details
       

 10-12-2015
0.00
Forward Fuselage Access Panels2
Details
       

 10-12-2015
7.00
Forward Fuselage Access Panels1
Details
       

 09-09-2015
0.00
Rivet Rear Window Topskin 2
Details
       

 09-09-2015
8.00
Rivet Rear Window Topskin 1
Details
       

 08-14-2015
0.00
Disassemble Roll Bar for final paint 2
Details
       

 08-14-2015
8.00
Disassemble Roll Bar for final paint
Details
       

 06-23-2015
3.00
Fit all the parts together
Details
       

 04-28-2015
2.00
Install Keyed Lock for Canopy Frame
Details
       

 09-11-2014
5.00
Disassemble and Paint Parts
Details
       

 09-08-2014
1.00
Install Aerox Oxygen System 2
Details
       

 09-08-2014
6.00
Install Aerox Oxygen System 1
Details
       

 08-27-2014
0.00
Install Baggage Tie Downs 4
Details
       

 08-27-2014
0.00
Install Baggage Tie Downs 3
Details
       

 08-27-2014
2.00
Install Baggage Tie Downs 2
Details
       

 08-27-2014
4.00
Install Baggage Tie Downs 1
Details
       

 08-12-2014
2.00
Make Removable Side Covers 2
Details
       

 08-12-2014
6.00
Make Removable Side Covers
Details
       

 01-16-2014
0.50
Install static air plumbing 3
Details
       

 01-01-2014
2.00
Install static air plumbing 2
Details
       

 01-01-2014
2.00
Install static air plumbing
Details
       

 11-04-2013
5.00
External Steps 6
Details
       

 05-17-2013
0.00
Fit 7A Tunnel in the 6A - 6
Details
       

 05-17-2013
1.00
Fit 7A Tunnel in the 6A - 5
Details
       

 05-17-2013
2.00
Fit 7A Tunnel in the 6A - 4
Details
       

 05-17-2013
3.00
Fit 7A Tunnel in the 6A - 3
Details
       

 05-16-2013
0.00
Fit 7A Tunnel in the 6A - 2
Details
       

 05-16-2013
8.00
Fit 7A Tunnel in the 6A - 1
Details
       

 03-28-2013
0.00
Airplane mover - Center Tunnel work
Details
       

 02-26-2013
4.00
Finish Mounting Parking Brake
Details
       

 02-26-2013
1.00
Control cable support / Alternate Engine Ground
Details
       

 02-22-2013
3.00
Parking Brake Mounting Location
Details
       

 02-13-2013
5.00
Fit the center tunnel and attach to firewall
Details
       

 02-12-2013
5.00
Made Engine Control Bracket
Details
       

 12-10-2012
3.00
Rudder Cable Fairing
Details
       

 12-06-2012
4.00
Brake Installation 1
Details
       

 11-15-2012
1.00
Glue and Rivet NACA Vents
Details
       

 11-13-2012
1.00
Riveted F-609 in place
Details
       

 10-13-2012
0.00
Fuselage Preparation for Canopy 2
Details
       

 10-13-2012
3.00
Fuselage Preparation for Canopy 1
Details
       

 10-09-2012
4.00
Arm Rests - Instrument Panel Angles
Details
       

 10-07-2012
6.00
Elevator Tubes- Skins Primed
Details
       

 08-22-2012
8.00
Fit and Rivet Forward Ribs and SubPanel
Details
       

 08-09-2012
4.00
Fit Forward Top Skin
Details
       

 08-01-2012
3.00
Tweak Upper Forward Fuselage Ribs
Details
       

 07-29-2012
3.00
External Steps 5
Details
       

 06-22-2012
0.00
External Steps 4
Details
       

 06-22-2012
4.00
External Steps 3
Details
       

 06-13-2012
8.00
Prime parts and assemble
Details

 06-12-2012
6.00
Remake Sub Panel and supporting structure
Details
       

 06-07-2012
6.00
Skin work
Details
       

 05-22-2012
1.00
External Steps 2. Why doesn't it fit correctly?
Details
       

 05-18-2012
3.00
External Steps 1
Details
       

 05-12-2012
8.00
F-674 Aft Top Skin 1
Details
       

 05-06-2012
2.00
F-675 Aft Top Skin 3
Details
       

 05-06-2012
3.00
F-675 Aft Top Skin 2
Details
       

 05-04-2012
6.00
F-675 Aft Top Skin 1
Details
       

 05-02-2012
4.00
Replace F-607 Bulkhead half and J Stringer
Details
       

 05-01-2012
2.00
#2 F-607 right half removed and replaced.
Details
       

 05-01-2012
2.00
#1 F-631 Roll Bar AN509 attachments
Details
       

 04-30-2012
1.00
F-631 Roll Bar Attachment #2
Details
       

 04-30-2012
2.00
F-631 Roll Bar Attachment #1
Details
       

 04-27-2012
1.00
F-631 C/D Final Drilled for AN4 bolts #2
Details
       

 04-27-2012
2.00
F-631 C/D Final Drilled for AN4 bolts #1
Details
       

 04-26-2012
2.00
F-631 Roll Bar #3 Today
Details
       

 04-26-2012
2.00
F-631 Roll Bar #2 Today
Details
       

 04-26-2012
2.00
F-631 Roll Bar #1 Today
Details
       

 04-25-2012
3.00
F-631 Roll Bar #3 Today
Details
       

 04-25-2012
1.00
F-631 Roll Bar #2 Today
Details
       

 04-25-2012
1.00
F-631 Roll Bar #1 Today
Details
       

 04-24-2012
3.00
Rivet Roll Bar Cont'd.
Details
       

 04-24-2012
3.00
Rivet F-631 Roll Bar Together
Details
       

 04-23-2012
2.00
Primed the roll bar for riveting
Details
       

 04-19-2012
8.00
Finished roll bar and ready for primer
Details
       

 04-16-2012
3.00
Done drilling to #40. Ready to enlarge to #30
Details
       

 04-14-2012
6.00
Roll Bar remake
Details
       

 04-13-2012
8.00
Drill Out 192 rivets for some practice.
Details
       

 04-10-2012
4.00
Permanently mount the rudder-brake hardware
Details
       

 04-06-2012
1.00
Drilled NACA vents to fuselage
Details
       

 04-05-2012
2.00
Cut out NACA vents on fuselage
Details
       

 04-04-2012
3.00
Position NACA Vents on Fuselage
Details
       

 03-30-2012
2.00
Riveted the rest of the F631 Roll Bar
Details
       

 03-29-2012
2.00
Rivet F631A - B- E Together
Details
       

 03-29-2012
8.00
Primed many parts today
Details
       

 03-22-2012
2.00
Another Quickbuild Mistake Discovered
Details
       

 03-19-2012
3.00
Made remaining F-621B Canopy Deck Rail
Details
       

 03-15-2012
5.00
Counter sink the F-631
Details
       

 03-14-2012
3.00
Made remaining parts to attach the F-632 brace
Details
       

 03-12-2012
6.00
Drill Joint Strips into Forward Roll Bar Half
Details
       

 03-11-2012
8.00
Construct F631A Roll Bar
Details
       

 03-08-2012
4.00
Long Bolts and Return Springs
Details
       

 03-07-2012
6.00
Position and drill brake pedals
Details
       

 03-06-2012
6.00
See how brake pedals fit.
Details
       

 03-06-2012
6.00
Prepare Rudder Pedals
Details
       

 03-05-2012
1.00
Riveted Seat Back Braces to F605
Details
       

 03-04-2012
6.00
Make F-620 arm rest with forming blocks
Details
       

 03-03-2012
3.00
Put some floor panels in place to have a look..
Details
       

 03-01-2012
8.00
JD Air Canopy Latch and attaching hardware.
Details
       

 03-01-2012
2.00
Install the Shoulder Harness Anchors
Details
       

 02-28-2012
8.00
Rivet the crotch straps in place
Details
       

 02-24-2012
8.00
Finally a day to prime
Details
       

 01-12-2012
5.00
Forward Seat Pans
Details
       

 01-11-2012
4.00
Finished Pilot Seat Pan
Details
       

 01-08-2012
4.00
Install nut plates and final fit.
Details
       

 12-19-2011
6.00
Nutplates, Seat Hinges, and more floor work
Details
       

 07-18-2011
2.00
Gear Weldment Spacer and Canopy Deck top.
Details
       

 07-13-2011
1.00
F657 on quickbuild are backwards!!
Details
       

 06-27-2011
1.00
Fitted Seat Pans to floor ribs
Details

 06-25-2011
3.00
Changed the Fuselage Stand
Details
       

 05-06-2011
2.00
Rivet seats together
Details
       

 05-04-2011
2.00
Prime seat parts and other misc parts
Details
       

 02-28-2011
0.50
Shoulder Harness Anchors fitted
Details
       

 03-19-2010
6.00
Inventory Finish Kit and FWF Kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.