Powered By Kitlog Pro v2.0
Jasons Web Site
RV-7A
Wings
Work Logs Found:
21
Category Work Time:
56 Hours
Date
Hours
Work Log Summary
Details
03-16-2010
2.50
Drilled Holes in Fuselage to set wing sweep and in
03-13-2010
1.00
Finished Riveting On R Wing Bottom Skin
03-12-2010
2.50
Riveted on R Wing Bottom Skin
03-10-2010
3.00
Riveted on L Wing Bottom Skin and Attached Pitot
10-02-2009
1.50
Riveted Brake Pedals
09-15-2009
2.00
Pulled L+R Wing Conduit (Huge PITA)
09-09-2009
3.00
Match Drill, Deburr & Dimple R Wing Skin and Frame
09-07-2009
3.50
Match Drill, Deburr and Dimple Left Bottom Wing Sk
09-07-2009
2.50
Install Pitot Tube Mast
09-06-2009
4.00
Attach and Secure Flaps and Hinge Pins
09-05-2009
4.00
Drill Holes for Wing Conduit (Major PITA)
08-28-2009
3.00
Drill / CS Right Flap Bracket and Hinge
08-27-2009
4.00
Drill / CS Left Flap Bracket and Hingo
08-26-2009
3.50
Align Ailerons
08-24-2009
3.50
Mount Ailerons
08-22-2009
4.00
Rivet Aileron and Flap Brackets
08-21-2009
2.00
Fit and Match drill Aileron and Flap Brackets
08-20-2009
2.00
Assemble and Rivet Aileron Pushrods
08-19-2009
1.50
Prime and Rivel Aileron and Flap Attach Brackets
08-19-2009
1.50
Assemble Aileron Bell Cranks
08-18-2009
2.00
Match Drill Aileron Attach Brackets
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
81
218
Empennage
47
120
Fuselage
13
42
Wings
21
56
Copyright © 2001-2024 Matronics. All Rights Reserved.