Powered By Kitlog Pro v2.0
Jims Web Site
601XLB
controls
Work Logs Found:
22
Category Work Time:
44 Hours
Date
Hours
Work Log Summary
Details
02-01-2013
3.00
Continued turnbuckle cleanup
Details
01-26-2013
2.00
Cleaned up turnbuckle safeties
Details
10-20-2012
2.10
Adjusted aileron movement
Details
10-04-2012
6.70
Connected aileron control cables
Details
09-18-2012
2.50
Connected flaps to flap motor
Details
03-09-2012
1.50
Remounted engine controls & routed through will
Details
06-25-2011
1.10
Installed aileron fairleads at fuselage exits.
Details
02-04-2011
1.00
Checked aileron trim tab control
Details
10-18-2010
1.60
Shot clear coat on rudder
Details
10-16-2010
1.30
Painted color on rudder
Details
10-15-2010
1.50
Prepared and primed rudder
Details
10-04-2010
3.50
Installed disconnect in line with evevator trim
Details
09-15-2010
4.00
Routed and connected brake lines
Details
09-11-2010
0.80
Temporary pilot seat installation and human factor
Details
04-26-2010
1.10
connected elevator controls
Details
03-24-2010
2.50
Elevator cable rubs against rudder cable
Details
03-22-2010
1.50
moved right rudder cable fairlead
Details
03-22-2010
2.00
Installed joysticks and linkages
Details
03-22-2010
0.45
Corrected cable interferrence with side of console
Details
03-22-2010
0.40
Added extra fairlead in center console
Details
03-11-2010
2.50
Installed rudder cables
Details
03-10-2010
1.00
Installed rudder pedal - nosewheel pushrods
Details
SITE NAVIGATION
601XLB Home
Category
# Logs
# Hours
All
823
2512
aircraft kit
26
57
Avionics
26
57
controls
22
44
Electrical
53
155
elevator
12
23
Elevator
22
44
Engine
79
352
Fuel System
53
155
Fuselage
179
542
horizonal stabilisze
13
24
Ignition
86
194
Landing gear
13
24
Miscellaneous
13
23
None
3
192
prop
2
4
Prop
2
3
Purchasing
53
155
rudder
12
23
Tools
1
1
Wings
14
91
Wiring
53
155
Zenith modification
86
194
Copyright © 2001-2024 Matronics. All Rights Reserved.