KENNETH T.'S WEB SITE
Work Logs Found: 113
Category Work Time: 524 Hours
 Date
Hours
Work Log Summary

Details

 03-14-2013
4.00
Instrument panel lighting & nose wheel pant work.
Details
       

 03-08-2013
3.50
Worked on baggage, panel, and glareshield lights.
Details
       

 02-16-2013
4.00
Match drilled rudder enclosure for pop-rivets.
Details
       

 06-25-2012
5.00
Removed Aux Batt Box and then reinstalled.
Details
       

 06-12-2012
5.00
Updated wiring schematics.
Details

 06-11-2012
4.00
Connected Static, Pitot, & AOA tubing.
Details
       

 06-09-2012
4.00
Visit from AF buddy about electrical system.
Details
       

 06-08-2012
3.00
Installed the Aux Battery box.
Details
     

 06-07-2012
4.00
Securing and protecting wiring.
Details
       

 08-03-2011
2.00
Trying to sketch fixture for landing light.
Details

 07-09-2011
2.50
Olive can landing light experiments.
Details
       

 06-24-2011
4.50
Finished the wiring of roll servo.
Details
     

 06-23-2011
4.00
Wired the AP roll servo to wing connector.
Details
     

 06-22-2011
5.50
Sevice Bulletin on fuel tube accomplished.
Details
       

 06-13-2011
3.50
Started wiring the right wing.
Details
       

 06-12-2011
4.00
Wiring tidy-up and carried in the right wing.
Details
       

 05-21-2011
6.00
Finished wiring Warning Lights panel.
Details
       

 05-19-2011
3.00
Misc wiring of overlooked items.
Details

 05-18-2011
5.00
Zip tied the wires and static tube to the glue mou
Details
       

 05-17-2011
6.00
Added glued mounts to support adhesive mounts.
Details
       

 05-16-2011
5.00
Continued removing adhesive from mounts.
Details
       

 05-13-2011
3.00
Removed foam adhesive from zip tie mounts.
Details

 05-10-2011
3.00
Experiments with adhesive zip tie mounts.
Details

 05-09-2011
5.00
Wired WigWag switch.
Details
       

 05-07-2011
4.00
Pulled Pitot Heat wire and wired switch.
Details
     

 05-06-2011
5.00
Wired Exterior Lights switches.
Details
       

 05-05-2011
4.00
Wired Nav/Pos, Strobes, Landing/Taxi to connectors
Details
       

 04-30-2011
6.00
Wired fuselage connector for AP roll servo.
Details
     

 04-29-2011
2.00
Pulled rudder strobe power wire.
Details
       

 04-27-2011
4.00
Wired connectors and pulled rudder wire.
Details
       

 04-26-2011
3.00
Pulled wire from left to right side.
Details

 04-23-2011
3.00
More crimping pins for Molex connectors.
Details
       

 04-21-2011
4.00
Pulled more wires for exterior lighting.
Details

 04-20-2011
4.00
Started wiring wing-fuselage connectors.
Details
       

 04-18-2011
4.00
Pulled some shielded wire.
Details

 04-15-2011
3.00
Ordered my Exterior Lighting.
Details

 04-13-2011
2.00
More research on exterior lighting.
Details

 04-11-2011
2.50
Drawing the Exterior lights schematic.
Details

 04-08-2011
4.00
Wired the cabin lights and tested.
Details
       

 04-07-2011
4.50
Mounted baggage lights.
Details
       

 04-05-2011
4.00
Pulled wiring for Interior Lighting.
Details

 03-28-2011
6.00
Rewired the Interior Lights switch.
Details

 03-24-2011
4.00
Reworked interior lighting diagram.
Details
       

 03-20-2011
6.00
Drew schematic of wing to fuselage connections.
Details
     

 03-16-2011
3.00
Research on wing-fuselage connectors.
Details
       

 02-16-2011
2.00
Rewired boost pump and fuel flow meter.
Details
       

 01-03-2011
4.00
Wired nav/com power & HS34 ground.
Details

 10-19-2010
4.00
Fabricated an D-sub avionics grounding bus.
Details
       

 10-06-2010
2.50
Wired the flap position sensor.
Details
     

 10-05-2010
4.50
Installed flap position sensor.
Details
       

 10-04-2010
2.50
Shopped for parts to install flap position sensor.
Details

 10-03-2010
3.00
Wired the twisted bundle to the pitch servo.
Details
     

 10-01-2010
3.00
Added wire to AP twisted bundle then pulled to ser
Details

 09-29-2010
4.00
Connected EFIS harnesses to remote compasses.
Details
       

 09-28-2010
5.00
Finished the wiring to the remote compasses.
Details
       

 09-27-2010
6.00
Drilling and wiring to the tailcone.
Details
       

 09-26-2010
3.00
Researched VAF forum about OAT probe location.
Details

 09-24-2010
4.00
Installed PowerSchottky diode for E-Bus.
Details
       

 09-23-2010
6.50
Finished stick grip wiring to terminal blocks.
Details
       

 09-21-2010
6.00
Wired copilot stick grip to terminal blocks.
Details
       

 09-19-2010
5.50
Wired AMP connector/installed crotch strap kits.
Details
       

 09-18-2010
4.00
Wired flap motor and did continuity testing.
Details
       

 09-16-2010
5.00
Pulled wires from/to FW & from/to terminal blocks.
Details
       

 09-14-2010
5.00
Installed terminal blocks and started stick wiring
Details
       

 09-12-2010
5.00
Installed Safety-Trim and Flap Controller harnesse
Details
       

 09-08-2010
5.50
The crotch strap kit arrived, started installation
Details
       

 09-05-2010
5.50
Rewired fuel boost pump circuit & potted stick.
Details
       

 09-04-2010
6.00
Installed copilot's Infinity stick grip.
Details
       

 09-03-2010
5.00
Installed the Infinity grip onto the pilot's stick
Details
     

 09-02-2010
4.00
Reinstalled Safety-Trim and Flaps Modules.
Details
       

 08-30-2010
35.00
Spent 10 days making schematics for stick wiring.
Details

 08-18-2010
5.00
Added hoses to avionics fan and wired some LEDs.
Details
       

 08-17-2010
4.00
Installed avionics fan and wired.
Details
     

 08-15-2010
6.50
Worked on pitot/static/AOA system.
Details
       

 08-13-2010
5.00
Changed dimmer wiring & wired servo pwr switch.
Details

 08-12-2010
4.00
Added LED warning lights and dimmer pot.
Details
     

 08-10-2010
5.00
Added servo and avionics pwr switches.
Details
       

 08-08-2010
5.00
Wired pitot heat switch and determined wire gauge.
Details
       

 08-06-2010
3.50
Wired Nav/Strobe and Taxi/Ldg lights switches.
Details
     

 08-05-2010
5.00
More switches wired including the fuel boost pump.
Details
       

 08-03-2010
5.00
Updating drawings and riveting tie mounts.
Details
       

 07-30-2010
4.00
Started wiring switches on the switch panel.
Details
       

 07-28-2010
6.00
Installed in-line fuse holders off batteries.
Details
       

 07-23-2010
7.00
Wired E-Bus Alt Feed Relay and switch.
Details
       

 07-21-2010
2.50
Made battery strap for bat removal from battery bo
Details
       

 07-20-2010
6.00
Fished installing all the battery cables.
Details
       

 07-18-2010
4.00
Made a fat wire support bracket for the Aux batter
Details

 07-16-2010
3.00
Series wiring is "not" parallel wiring!
Details
       

 07-15-2010
5.00
Crimped fat wires for electrical system.
Details
       

 07-14-2010
3.50
Installed the TWC Safety Trim module.
Details
       

 07-13-2010
5.00
Bought some parts and installed TWC Flap Module.
Details
       

 07-10-2010
3.00
Ordered PC680 battery and other parts.
Details

 07-09-2010
4.00
Crimper delivered and I try a fat wire crimp.
Details
       

 07-01-2010
4.00
Fabricated some cable supports.
Details
       

 06-30-2010
6.00
Installed Aux battery contactor.
Details
       

 06-27-2010
3.00
Wired diodes to Van's batt and starter contactors.
Details
       

 06-26-2010
5.00
Mounted ammeter shunt and ANL base.
Details
       

 06-25-2010
4.00
Bought welding cable to make fat wires.
Details
       

 06-22-2010
8.00
Ordered some bolts, nuts, screws, and terminals.
Details

 06-17-2010
4.50
Installed remote compasses & bracket into tailcone
Details
       

 06-14-2010
7.50
Fabricated bracket for Dynon remote compasses.
Details
       

 06-09-2010
3.00
Installed fuse blocks and Schottky diode.
Details
       

 06-08-2010
4.00
Installed Main battery box & contactors to FW.
Details
       

 06-02-2010
7.00
Dismantling and reengineering the Aux battery box.
Details
       

 05-31-2010
2.00
Researching various throttle cable FW penetrations
Details

 05-08-2010
3.50
Riveted the drop down fuse block panel parts.
Details
       

 05-07-2010
4.00
Started drop down fuse block panel.
Details
       

 03-12-2010
6.50
Aux battery box nearly finished.
Details
       

 03-11-2010
5.50
Still working on Aux Battery box installation.
Details
       

 03-10-2010
6.00
Continued Aux Battery box construction.
Details
       

 03-09-2010
6.00
Start construction of Aux Battery enclosure.
Details
       

 03-08-2010
4.00
Designed and purchased material for Aux Bat Box.
Details

 03-07-2010
3.00
Designed Electrical system and finalized avionics.
Details