Barrys RV-9A Project
Work Logs Found: 81
Category Work Time: 178 Hours
 Date
Hours
Work Log Summary

Details

 01-06-2013
3.00
Continued installing tail parts.

 01-04-2013
4.00
Installed horizontal stabilizer and vert stabilize

 06-18-2012
1.75
Sanded and primed empennage fairing.

 06-15-2012
1.00
Finished installing rudder bottom fairing with str

 06-13-2012
2.00
Finished horizontal elevator fiberglass tips.

 06-10-2012
1.00
Horizontal stabilizer fiberglass tips

 06-05-2012
1.75
Worked on horizontal stabilizer fiberglass tips

 04-23-2012
2.00
Finished fitting and machining the empennage fairi

 04-21-2012
3.50
Shaping and fitting the empennage fairing.

 04-19-2012
1.50
Drilled and deburred in prepareation for nutplate

 04-18-2012
2.00
Fitted and drilled the empennage fairing.

 04-17-2012
2.00
Continued working on the lower empennage gap fairi

 04-16-2012
2.00
Continued work on the empennage fairing and lower

 04-15-2012
2.00
Continued fitting the empennage fairing.

 04-14-2012
4.00
Started working empennage fairing, started assembl

 04-12-2012
2.75
Fitted the rudder fiberglass bottom. Machined, deb

 04-11-2012
2.00
Continued work on the elevator fiberglass tips. St

 04-10-2012
1.00
Installed the fiberglass tip on the rudder. starte

 04-09-2012
2.00
Started fitting the fiberglass tips on the rudder.

 04-02-2012
1.50
Finished attaching the vertical stabilizer to the

 06-06-2011
1.25
Riveted rudder stops to fusalage
     

 06-05-2011
3.25
Mounting and fitting rudder
     

 05-24-2011
2.25
Mounting the vertical stabilizer

 05-23-2011
1.75
Mounting verical stabilizer
     

 05-22-2011
4.00
Finished adjusting horizontal stab to elevators

 05-21-2011
1.75
Adjusted Elevators, drilled elevator horns
     

 05-19-2011
2.25
Fitting Horz. stabilizer, Drilled mounting holes.

 05-18-2011
1.75
Fitting Horz. Stabilizer to the rear of the plane.

 05-17-2011
1.50
Riveting the rear skins
Details
     

 05-16-2011
1.25
Test fitting horizontal stabilizer
     

 05-09-2011
2.00
Fitting and mounting the vertical stabilizer

 12-19-2010
3.25
Fuel valve, started crotch strap bracket installat

 05-20-2010
1.00
Finished fiberglassing empennage tips

 05-19-2010
1.50
Made balsa ends for the fiberglass tips of the emp

 05-18-2010
1.25
Finished installing counterweights on elevators

 05-16-2010
2.00
Rivited the trim tab and attached counterweights
       

 05-10-2010
2.00
Rivited and assembled the trim tab.
     

 05-09-2010
1.25
Machined trim tab parts

 05-08-2010
1.50
Cut out foam and wood trim pieces, primed trim tab

 05-01-2010
2.00
attached the trailing edge W/tank sealant to LE

 04-30-2010
2.00
Finished riviting the left elevator

 04-29-2010
3.50
Assembled parts of the left elevator
     

 04-28-2010
2.00
Washed, etched, and primed the left elevator parts

 04-27-2010
3.00
Deburred and dimpled L. elevator skin and Misc par

 04-26-2010
2.00
Drilled fitted stiffeners to L, elevator

 04-25-2010
3.00
Started on L. Elevator. Fitted, drilled spar. tip

 04-24-2010
3.00
Finished R. elevator. started L. elevator
     

 04-21-2010
2.50
Finished riviting R. elevator skin

 04-20-2010
1.00
Rivited spar to R. elevator

 04-19-2010
2.00
Rivited R. elevator spar, frames to skin

 04-18-2010
2.00
Dimpled, washed, etched and primed R. elevator
     

 04-16-2010
2.00
Drilled, deburred r. elevator spar and tips

 04-15-2010
2.00
Dimpled elevator stiffiners. Drilled spar to tip s

 04-14-2010
1.50
Finished bending trailing edge of the rudder
       

 04-13-2010
2.00
Finished machining elevator stiffeners, deburred

 04-11-2010
1.50
Machined and started fitting stiffeners to R. elev

 04-10-2010
1.50
Finished riviting skins, glued trailing edge of ru
     

 04-10-2010
1.00
Cut out and machined right elevator stiffeners

 04-09-2010
3.50
Rivited rudder skins

 04-08-2010
2.00
washed, etched, primed. started assem. of rudder

 04-07-2010
2.00
Finished drilling and dimpling the rudder skins

 04-04-2010
2.00
finished machining and dimpling spars, frames of r

 04-03-2010
4.00
Primed, rivited rudders stiffeners, drilled, debur

 04-01-2010
1.00
Deburred and dimpled the rudder skins

 03-31-2010
2.00
Drilled and deburred rudder stiffeners to the skin
     

 03-29-2010
1.50
Cut out and machined rudder stiffeners.

 03-28-2010
2.50
Completed the vertical stabilizer
       

 03-27-2010
2.00
Rivited the rear spar on the vertical stabilizer

 03-25-2010
1.50
Primed the vertical stabilizer

 03-24-2010
1.50
Dimpled the vertical stabilizer skin, washed and e

 03-23-2010
1.50
Drilled, and deburred the vertical stabilizer

 03-22-2010
2.00
Finished the horizontal stabilizer and assembled t
       

 03-21-2010
4.00
Finished riviting the spars and frames to the hori

 03-20-2010
4.00
Riveted the spars and frames to the horizontal sta

 03-16-2010
2.50
Rivited horizontal spars together. Started rivitin

 03-14-2010
4.00
Finished dimpling and prepping skins, cleaned and
     

 03-13-2010
5.00
Countersinking on spars and dimpling feames and sk

 03-06-2010
5.00
Assembled the horizontal stabilizer spars and ribs
       

 03-05-2010
2.00
debured and cleaned up the ribs

 03-04-2010
1.50
Fabricated the HS 908L and 908R attach angles

 02-22-2010
1.50
Empennage inventory