Date
Hours
Work Log Summary
Details
05-10-2013
1.80
Flew with Mike Seager for transition training.
04-28-2013
2.50
Finished installing interior.
04-27-2013
8.00
Finished installing the interior. Weighed the plan
04-23-2013
2.50
Installed interior.
04-19-2013
2.00
Modified cover panel around elevator trim cable. C
04-15-2013
1.75
Installed more interior.
04-14-2013
2.50
Started final assembly.
04-13-2013
4.00
Misc. work.
04-09-2013
2.75
Finished installing control sticks.
04-07-2013
3.00
Installed control sticks and PTT wires.
03-24-2013
3.50
Misc. work
03-22-2013
7.75
Aligned all control surfaces. EAA tech adviser ins
03-11-2013
2.50
Emergency bipass air, fresh air ducts.
03-10-2013
3.00
Wiring, cleanup, air vent fitting.
02-23-2013
3.00
Painted plenum, riveted side panels, started runni
01-13-2013
3.75
Misc work.
01-12-2013
4.00
Misc. work.
08-05-2012
2.00
Installed the flap motor.
08-04-2012
2.50
Installed the flap motor and related equipment.
07-28-2012
6.00
Finished forward firewall, attached baggage floor,
01-15-2012
3.00
Installed primer pump for fuel system
01-08-2012
2.75
Fabricated brackets to hold wiring conduit under t
08-17-2011
2.00
Pacific Coast Avionics, Vans
Details
07-09-2011
2.00
Misc
Details
06-22-2011
0.50
Moved plane out of the shop
Details
06-18-2011
1.00
Framing carport
06-17-2011
1.00
Framing carport for new airplane home
06-16-2011
1.00
06-15-2011
1.00
Firewall, landing gear
06-01-2011
1.00
Misc cleanup and planning
10-25-2010
1.00
Watched George Orndoff video on fusalage const.
09-10-2010
5.00
Visit to Vans to order the finishing kit
05-31-2010
6.00
Finished arranging the shop and inventoring the qu
05-29-2010
3.00
Rearranged shop to store wings and fuselage
05-27-2010
2.50
Built fuselage stand
05-25-2010
10.00
Picked up quickbuild from Vans
05-24-2010
2.00
Built a wing stand
05-08-2010
1.00
Built and installed a storage shelf in the shop
03-24-2010
1.00
Built a storage platform for parts storage in the
03-13-2010
1.00
Finished the paint table
03-11-2010
1.50
Constructed a paint table for priming parts
02-17-2010
6.00
Went to vans to order quick build and pick up empa
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
680
1647
Avionics
25
50
Canopy
69
150
Cowling
81
184
Empennage
81
178
Engine
21
63
Forward Firewall
29
80
Fuselage
95
214
Landing Gear
45
91
Miscellaneous
42
124
Paint
69
199
Wings
74
158
Wiring
49
156
Copyright © 2001-2024 Matronics. All Rights Reserved.