Work Logs Found: 42
Category Work Time: 124 Hours
 Date
Hours
Work Log Summary

Details

 05-10-2013
1.80
Flew with Mike Seager for transition training.

 04-28-2013
2.50
Finished installing interior.

 04-27-2013
8.00
Finished installing the interior. Weighed the plan

 04-23-2013
2.50
Installed interior.

 04-19-2013
2.00
Modified cover panel around elevator trim cable. C

 04-15-2013
1.75
Installed more interior.

 04-14-2013
2.50
Started final assembly.

 04-13-2013
4.00
Misc. work.

 04-09-2013
2.75
Finished installing control sticks.

 04-07-2013
3.00
Installed control sticks and PTT wires.

 03-24-2013
3.50
Misc. work

 03-22-2013
7.75
Aligned all control surfaces. EAA tech adviser ins

 03-11-2013
2.50
Emergency bipass air, fresh air ducts.

 03-10-2013
3.00
Wiring, cleanup, air vent fitting.

 02-23-2013
3.00
Painted plenum, riveted side panels, started runni

 01-13-2013
3.75
Misc work.

 01-12-2013
4.00
Misc. work.

 08-05-2012
2.00
Installed the flap motor.

 08-04-2012
2.50
Installed the flap motor and related equipment.

 07-28-2012
6.00
Finished forward firewall, attached baggage floor,

 01-15-2012
3.00
Installed primer pump for fuel system

 01-08-2012
2.75
Fabricated brackets to hold wiring conduit under t

 08-17-2011
2.00
Pacific Coast Avionics, Vans
Details

 07-09-2011
2.00
Misc
Details
     

 06-22-2011
0.50
Moved plane out of the shop
Details
       

 06-18-2011
1.00
Framing carport

 06-17-2011
1.00
Framing carport for new airplane home

 06-16-2011
1.00


 06-15-2011
1.00
Firewall, landing gear

 06-01-2011
1.00
Misc cleanup and planning

 10-25-2010
1.00
Watched George Orndoff video on fusalage const.

 09-10-2010
5.00
Visit to Vans to order the finishing kit

 05-31-2010
6.00
Finished arranging the shop and inventoring the qu

 05-29-2010
3.00
Rearranged shop to store wings and fuselage

 05-27-2010
2.50
Built fuselage stand
       

 05-25-2010
10.00
Picked up quickbuild from Vans

 05-24-2010
2.00
Built a wing stand

 05-08-2010
1.00
Built and installed a storage shelf in the shop
     

 03-24-2010
1.00
Built a storage platform for parts storage in the

 03-13-2010
1.00
Finished the paint table

 03-11-2010
1.50
Constructed a paint table for priming parts
     

 02-17-2010
6.00
Went to vans to order quick build and pick up empa
Details
       