Powered By Kitlog Pro v2.0
Mikes RV9A Site
RV-9A
Empennage
Work Logs Found:
40
Category Work Time:
107 Hours
Date
Hours
Work Log Summary
Details
05-26-2010
2.00
Right Elevator Assembly
Details
05-25-2010
2.00
Primmed Right elevator
Details
05-23-2010
3.50
Right Elevator
Details
05-20-2010
2.50
Right Elevator
Details
05-05-2010
4.00
Elevator
Details
04-25-2010
2.00
Rudder Leading Edge
Details
04-22-2010
2.50
Bent the Rudder Leading edge
Details
04-18-2010
4.00
Riveted RudderTrailing Edge
Details
04-13-2010
1.50
Sealed the Trailing edge
Details
04-12-2010
2.50
Prepared Trailing Edge
Details
04-11-2010
2.00
Rudder Spar
Details
04-09-2010
4.00
Riveting the Rudder
Details
04-05-2010
3.50
Rudder dimpling
Details
04-02-2010
3.50
Assembled Rudder
Details
04-01-2010
1.20
Rudder Skeleton
Details
03-30-2010
1.50
Rudder Skin
Details
03-29-2010
2.50
Deburring and priming
Details
03-26-2010
3.50
Rudder Parts
Details
03-25-2010
4.00
Riveting the VS
Details
03-25-2010
1.00
Primed Parts
Details
03-24-2010
3.00
Deburring and dimpling
Details
03-23-2010
1.50
Drilled Skin and Deburred
Details
03-22-2010
3.00
Vertical Stab Assembly
Details
03-19-2010
1.50
Riveted Inboard Hinge Bracket
Details
03-18-2010
4.50
Riveting the Left hand Skin of the HS
Details
03-17-2010
4.50
HS Riveting
Details
03-15-2010
3.50
Riveting the Spars
Details
03-12-2010
2.50
Priming
Details
03-09-2010
2.00
Countersinking
Details
03-08-2010
4.00
Dimpling and Countersinking
Details
03-06-2010
2.00
Deburring
Details
03-05-2010
2.50
Deburring
Details
03-04-2010
3.50
LH Horz Stab
Details
03-03-2010
5.50
Deburring and RH Horizontal Stab
Details
03-01-2010
4.00
Manufactured Parts and Drilled Ribs
Details
02-28-2010
4.00
Spar Assembly
Details
02-25-2010
2.00
Inventory
Details
02-24-2010
0.50
Emmpenage Arrived
Details
02-22-2010
0.00
Empennage Shipment
Details
02-16-2010
0.00
Ordered Empenage Kit
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
43
109
Empennage
40
107
Shop Supplies
3
2
Copyright © 2001-2024 Matronics. All Rights Reserved.