05-05-2014
3.00
Prepare plane for relocation to Collier.
Details
05-05-2014
3.00
Finish Center Console
Details
03-11-2014
1.00
Rivet 6K2-1 to 6B7-2
Details
02-12-2014
2.00
Center Console Work
Details
02-09-2014
2.00
Center Console Work
Details
02-08-2014
5.00
Center Console Work
Details
02-07-2014
2.00
Center Console Work
Details
02-05-2014
2.00
Center Console Work
Details
02-04-2014
2.00
Begin Center Console
Details
09-18-2013
4.00
Cover Baggage Compartment with Felt
01-29-2012
1.00
Fabricating & Installing a Parking Brake
Details
01-24-2012
2.50
Fabricating & Installing a Parking Brake
Details
01-10-2012
3.00
Rivet Arm Rest and Seats
01-09-2012
2.00
Remove forward top. Rivet pilot arm rest side
02-01-2011
6.00
Riveted Entry Step
Details
01-31-2011
3.00
Locate and install entry step
01-06-2011
6.00
Completed Fuselage sans canopy and step
Details
01-05-2011
2.00
Baggage Floor Work and Rear Top Skin
01-04-2011
1.00
Began baggage compartment floor installaiton.
12-31-2010
4.00
Fuselage Forward Top Skin Completed
Details
12-30-2010
4.00
Capture Nut Installation Continues
Details
12-29-2010
4.00
Fuselage Forward Top Skin
Details
12-28-2010
4.00
Instrument Panel
Details
12-23-2010
3.00
Instrument Panel Capture Nuts
12-22-2010
2.00
Instrument Panel Capture Nuts
Details
12-18-2010
6.00
Removed forward top skin to install capture nuts
Details
12-17-2010
3.00
Complete drilling and clecoing forward top skin
Details
12-16-2010
5.00
Continue fitting forward top skin
12-07-2010
3.00
Replace Temporary Bolts
Details
12-07-2010
8.00
Bottom Access Door
Details
12-06-2010
4.50
Misc Riveting
Details
12-05-2010
4.00
Permanently Attach Front Sides & Seats
Details
12-03-2010
1.00
Permanently Attach Front Sides
Details
12-02-2010
6.00
Permanently Attach Front sides.
12-02-2010
2.00
Add Capture Nuts to Instrument Panel
11-13-2010
1.00
Installed Control Stick Assembly
Details
11-10-2010
2.00
Removed, made a new doubler and reinstalled.
Details
11-09-2010
8.00
Primed inside of fuselage with green zinc chromate
11-01-2010
3.00
Cleaning parts in preparation for priming
10-28-2010
2.00
Permanently attached Upper Engine Mount to Longero
10-27-2010
4.00
Trimed Turtle Deck
10-26-2010
2.00
Riveted the two new 6B15-1 parts and 6B16-2.
10-25-2010
4.00
Fabricate 2 new 6B15-1 parts
10-20-2010
3.00
Continue with clean up and priming.
Details
10-19-2010
3.00
Effort continues to clean, prime and rivit fuselag
10-15-2010
3.00
Continue effort on corrosion treatment.
10-14-2010
5.00
Continue work on left side and interior.
10-13-2010
2.00
Fuselage left side work
Details
10-12-2010
2.00
Fuselage sides finish up.
Details
10-11-2010
6.00
Finish up in several locations.
Details
10-04-2010
2.00
Rivet Center Wing Spar to Fuselage Floor
10-04-2010
7.00
Complete the Aileron Control Stop in Fuselage.
Details
09-30-2010
7.00
Control Limits - Fuselage
Details
09-09-2010
3.00
Flap Control Installation.
Details
09-07-2010
3.00
Continue Flap Drive Work
08-31-2010
3.00
Continue Flap Drive Work
Details
08-24-2010
2.00
Conitnue Flap Drive Work
Details
08-23-2010
7.00
Some more disassembly for deburring and corrosion
Details
08-22-2010
1.00
Drill and cleco cool air vent SV-1.
Details
08-22-2010
3.00
Began disassembly for deburring and corrosion prot
Details
08-19-2010
1.00
Shortening Inst Panel
Details
08-19-2010
1.00
Complete Forward side skin drilling and clecoing.
Details
08-18-2010
3.00
Shoulder Harness Fitting
Details
08-17-2010
4.00
Top Rear Fuselage Skin
Details
08-15-2010
2.00
Top Rear Fuselage Skin
Details
08-14-2010
4.00
Electric Flap Mount
Details
08-13-2010
3.00
Seat Back Support
Details
08-13-2010
3.00
Installation of baggage floor.
Details
08-12-2010
6.00
Passneger Seat
Details
08-11-2010
6.00
Upper Longeron Splice
Details
08-10-2010
6.00
Center Wing Spar Uprights
Details
08-06-2010
6.00
Add doubler to end of center wing spar
Details
08-05-2010
6.00
Front Seat Panel Work
Details
08-04-2010
3.00
Complete Gear Channel Upright Installation
08-03-2010
3.00
Replace Gear Channel Uprights
Details
08-02-2010
6.00
Complete Forward Side Skin Attachment
Details
07-31-2010
3.00
Install Z Channel
Details
07-30-2010
3.00
Install Side Doublers
Details
07-29-2010
6.00
Install Upright Doublers
Details
07-28-2010
2.00
Forward fuselage side panels
Details
07-27-2010
3.00
Begin left forward side skin installation.
Details
07-26-2010
6.00
Begin right forward side skin installation. (Conti
Details
07-24-2010
1.00
Fabricate Rear Center Spar Upright
Details
07-24-2010
2.50
Begin right forward side skin installation.
Details
07-22-2010
1.00
Replaced Left Toe Brake Pedal.
Details
07-21-2010
4.00
Fuselage Assembly
Details
07-21-2010
1.00
Fabricate 6B12-5 L & R
Details
07-16-2010
7.00
Reinstall Pedal Bearing Channel
Details
07-15-2010
2.00
Remove rudder pedals and heel plate.
Details
07-14-2010
1.00
Re-install gussets 6B10-4 left and right
Details
07-14-2010
1.00
Forward Fuselage Assembly
Details
07-13-2010
12.00
Rear Frame Assembly
Details
05-26-2010
6.00
Final assembly of center wing spar.
Details
05-24-2010
6.00
Assemble the two Center Spar halves.
Details
05-23-2010
8.00
Complete Spar Uprights
Details
05-21-2010
3.00
Spar upright work
Details
05-12-2010
6.00
Back Drill Holes as needed in upgrade parts.
Details
05-11-2010
6.00
Back Drill Holes as needed in upgrade parts.
Details
05-10-2010
6.00
Disassemble Center Spar Section
Details
03-31-2010
2.00
Check Wing Jig
Details
03-29-2010
1.00
Rudder Pedals
Details
03-29-2010
0.50
Join the cabin floor to the gear channel
Details
03-29-2010
2.00
Cabin Floor
Details
03-22-2010
3.00
Remove Center Wing Spar
Details
03-13-2010
5.00
Began installing updated firewall parts.
Details
03-12-2010
1.00
Received and inventoried parts.
03-09-2010
1.00
Ordered more updated parts for firewall.
03-07-2010
2.00
Drill and rivet 6B8-1 to 6B8-7
Details
02-26-2010
2.00
Confirmed each step properly completed!
Details
02-24-2010
2.00
Gear Channel & Firewall & Stiffener/ Engine Mount
Details
02-22-2010
2.00
Confirmed each step properly completed!
Details
02-21-2010
3.00
Confirmed each step properly completed!
Details
02-20-2008
45.00
Flap Control
Details
08-05-2006
62.00
Fuselage work.
Details
04-22-2006
23.00
Attach cockpit floor to firewall and rear section
Details
03-12-2006
23.00
Forward skins and longerons.
Details
02-12-2006
28.00
Front side panels.
Details
09-01-2005
66.00
Cockpit floor, braces and rudder pedals.
Details
01-23-2005
32.00
Firewall Construction
Details
01-14-2002
1.00
Fair Lead Work & Other Fuselage Work
Details
01-14-2002
8.00
Clecoed and partially riveted rear floor and sides
Details
SITE NAVIGATION
Contact Builder
Zodiac 601XLb Tail Dragger Home
Zodiac 601 XLB Home
Category
# Logs
# Hours
All
512
2059
Airframe
9
37
Auto Pilot
8
34
Avionics
25
108
Brakes
8
19
Canopy
51
131
Control System
33
112
Cowl
1
1
Electrical
15
42
Empennage
30
124
Engine
25
76
Entire Plane
1
11
Fuel System
10
37
Fuselage
121
678
FWF
34
96
Landing Gear
8
27
Lights
4
8
Miscellaneous
25
117
Painting
12
23
Paper Work
1
2
Pitot/Static
4
13
Post Const Insp
6
17
Prop
3
12
Propeller
1
3
Shop Supplies
1
40
Spinner
2
4
Tools
2
3
Upgrade
14
43
Wings
54
214
Wire
3
15
Work Bench
1
12
Copyright © 2001-2024 Matronics. All Rights Reserved.