Powered By Kitlog Pro v2.0
RON'S WEB SITE
RV-6A QB
Wheels/tires/gear
Work Logs Found:
43
Category Work Time:
90 Hours
Date
Hours
Work Log Summary
Details
05-08-2012
1.50
Reinstalling nose wheel pant...
Details
05-07-2012
3.50
Reinstalling painted wheel pants on R & L gear...
Details
12-28-2011
2.00
Rerouted R brake line, molded R fairing...
Details
12-01-2011
1.20
Installed main wheel pants for testing...
Details
11-18-2011
5.00
Aligning gear fairings...
Details
11-15-2011
2.50
Fitting & drilling R wheel pant to bracket...
Details
09-29-2011
2.50
Drilled pressure access in nosepant...
Details
08-10-2011
1.50
Installed drilled bolts/wheel pant fitting...
Details
07-01-2011
2.00
Fitting L wheel pant & added nutplates...
Details
06-16-2011
2.50
Fitting R gear wheelpant...
Details
06-14-2011
2.50
Fitting NG wheelpant to tire...
Details
04-28-2011
3.50
Correctly mounted wheelpant brackets...
Details
04-27-2011
4.00
Fabricating NG/cowl fairing...
Details
04-25-2011
1.00
Trimming NG wheelpant ...
Details
04-19-2011
2.00
Fitting NG fairings/wheelpant...
Details
11-02-2010
1.50
Completed brakes/safety wires...
Details
10-29-2010
1.50
Completed installion of cotter pin in L wheel...
Details
10-23-2010
3.00
Drilled L main axle for 1/8 cotter pin...
Details
10-22-2010
2.50
Completed drilling R main axle for 1/8 cotter pin.
Details
10-21-2010
2.50
Drilling mains for cotterpins...
Details
03-04-2009
1.50
Replaced four contersink bolts in gear weldments..
Details
02-10-2009
1.00
Reworked countersink area for proper depth...
Details
02-09-2009
1.00
Removed front two gear weldment bolts......
Details
02-16-2008
1.00
Installed cotter pin in NG fork retention nut...
Details
02-14-2008
1.00
Final adjusting of NG breakaway ...
Details
02-08-2008
1.00
Measuered & adjusted NG breakaway....
Details
01-15-2008
1.00
Reinstalled NG on aircraftper SB 07-11-09...
Details
11-15-2007
1.50
Pulled NG off aircraft-VansSB07-11-09& ordered new
Details
11-15-2007
1.80
Fabricated wooden crate for NG shipping...
Details
07-05-2007
2.00
Repacked wheel bearings & tightened wheelskirt...
Details
07-04-2007
2.00
Pulled wheels & wooden spars...
Details
12-05-2006
1.50
Added washers/nuts for remaining L gear area...
Details
11-28-2006
2.00
Replaced stripped AN5-21A bolt in R gear...
Details
11-27-2006
3.50
Inserting AN3-16A/17A bolts in spars...
Details
11-22-2006
1.00
Tightened bolts thru fuselage sides/gear weldments
Details
11-17-2006
2.00
Mounted both main gear & nose gear after eng. ...
Details
11-14-2006
2.00
Assembled brake flanges, spacers for bolts....
Details
11-11-2006
1.50
Attempting to figure out brake assembly...
Details
11-10-2006
3.00
Inserting bolts through spar/gear/etc...
Details
10-13-2006
3.50
Mounted nosewheel, main gear wheel...
Details
03-30-2006
2.50
Assembled main gear tubes/tires..
Details
03-29-2006
3.50
Greased nose gear bearings, assembled tire...
Details
03-28-2006
1.00
Purchased Aeroshell 5 grease and fuel testing...
Details
SITE NAVIGATION
Contact Builder
RV-6A QB Home
Category
# Logs
# Hours
All
1708
3742
A/C Hardware & Supplies
11
20
Ailerons
23
48
Avionics
3
5
Brakes
6
10
Canopy
121
238
Canopy
13
25
Empennage
78
162
Engine
1
1
fiberglass
92
208
Firewall Forward
78
166
Flaps
29
59
Flight controls
71
175
Flight controls
63
153
Fuel tanks/lines
30
64
Fuel tanks/lines
6
10
Fuselage
100
203
Hardware
10
16
Insturment Panel
115
279
Interior
63
149
Lycoming IO360
5
10
Miscellaneous
61
144
MT propeller
13
25
Painting preparation
29
59
Paperwork
19
36
Parts fabrication
23
48
Polishing
16
39
Rudder/Brakes
20
31
Rudder/Brakes
63
153
Shipping
8
26
Shop Supplies
23
47
Subaru engine
57
117
Subaru Engine
1
1
Systems
32
64
Tools
8
13
Trim tab
121
238
Trim tab
6
19
Weight & Balance
3
10
Wheels/tires/gear
16
39
Wheels/tires/gear
43
90
Wings
114
277
Wiring
71
175
Wiring
43
90
Copyright © 2001-2024 Matronics. All Rights Reserved.