KitLog pro

Powered By Kitlog Pro v2.0

RON'S WEB SITE
Work Logs Found: 43
Category Work Time: 90 Hours
 Date
Hours
Work Log Summary

Details

 05-08-2012
1.50
Reinstalling nose wheel pant...
Details
       

 05-07-2012
3.50
Reinstalling painted wheel pants on R & L gear...
Details
     

 12-28-2011
2.00
Rerouted R brake line, molded R fairing...
Details
       

 12-01-2011
1.20
Installed main wheel pants for testing...
Details
       

 11-18-2011
5.00
Aligning gear fairings...
Details
       

 11-15-2011
2.50
Fitting & drilling R wheel pant to bracket...
Details
       

 09-29-2011
2.50
Drilled pressure access in nosepant...
Details
       

 08-10-2011
1.50
Installed drilled bolts/wheel pant fitting...
Details
       

 07-01-2011
2.00
Fitting L wheel pant & added nutplates...
Details

 06-16-2011
2.50
Fitting R gear wheelpant...
Details
     

 06-14-2011
2.50
Fitting NG wheelpant to tire...
Details
       

 04-28-2011
3.50
Correctly mounted wheelpant brackets...
Details
       

 04-27-2011
4.00
Fabricating NG/cowl fairing...
Details
       

 04-25-2011
1.00
Trimming NG wheelpant ...
Details
       

 04-19-2011
2.00
Fitting NG fairings/wheelpant...
Details
       

 11-02-2010
1.50
Completed brakes/safety wires...
Details
     

 10-29-2010
1.50
Completed installion of cotter pin in L wheel...
Details
     

 10-23-2010
3.00
Drilled L main axle for 1/8 cotter pin...
Details

 10-22-2010
2.50
Completed drilling R main axle for 1/8 cotter pin.
Details
     

 10-21-2010
2.50
Drilling mains for cotterpins...
Details
       

 03-04-2009
1.50
Replaced four contersink bolts in gear weldments..
Details
       

 02-10-2009
1.00
Reworked countersink area for proper depth...
Details

 02-09-2009
1.00
Removed front two gear weldment bolts......
Details

 02-16-2008
1.00
Installed cotter pin in NG fork retention nut...
Details
     

 02-14-2008
1.00
Final adjusting of NG breakaway ...
Details
       

 02-08-2008
1.00
Measuered & adjusted NG breakaway....
Details

 01-15-2008
1.00
Reinstalled NG on aircraftper SB 07-11-09...
Details
       

 11-15-2007
1.50
Pulled NG off aircraft-VansSB07-11-09& ordered new
Details
       

 11-15-2007
1.80
Fabricated wooden crate for NG shipping...
Details
       

 07-05-2007
2.00
Repacked wheel bearings & tightened wheelskirt...
Details
     

 07-04-2007
2.00
Pulled wheels & wooden spars...
Details
       

 12-05-2006
1.50
Added washers/nuts for remaining L gear area...
Details
     

 11-28-2006
2.00
Replaced stripped AN5-21A bolt in R gear...
Details

 11-27-2006
3.50
Inserting AN3-16A/17A bolts in spars...
Details

 11-22-2006
1.00
Tightened bolts thru fuselage sides/gear weldments
Details

 11-17-2006
2.00
Mounted both main gear & nose gear after eng. ...
Details
     

 11-14-2006
2.00
Assembled brake flanges, spacers for bolts....
Details
     

 11-11-2006
1.50
Attempting to figure out brake assembly...
Details
       

 11-10-2006
3.00
Inserting bolts through spar/gear/etc...
Details

 10-13-2006
3.50
Mounted nosewheel, main gear wheel...
Details
       

 03-30-2006
2.50
Assembled main gear tubes/tires..
Details
       

 03-29-2006
3.50
Greased nose gear bearings, assembled tire...
Details
     

 03-28-2006
1.00
Purchased Aeroshell 5 grease and fuel testing...
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.