Powered By Kitlog Pro v2.0
RON'S WEB SITE
RV-6A QB
Flight controls
Work Logs Found:
63
Category Work Time:
153 Hours
Date
Hours
Work Log Summary
Details
02-15-2011
4.00
Final adjustment of aileron controls...
Details
02-14-2011
4.00
More adjusting flight control system...
Details
02-11-2011
2.50
Installed aileron control stops...
Details
01-28-2011
2.00
Disconnected flaps/ailerons for adjustment...
Details
09-03-2010
1.50
Finalized cotterpins on control stick mounts...
Details
09-01-2010
3.00
Filing to get full freedom of all flight controls.
Details
07-14-2010
1.50
Installed L aileron AN3-14A bolt/nyloc...
Details
07-13-2010
1.00
Realigned L aileron pushrod ...
Details
05-25-2010
3.50
Added fire extinguisher, controls, sanding...
Details
04-08-2010
3.50
Ran Subaru for the first time...A MILESTONE DAY!
Details
03-29-2010
1.00
Added 75-60 special washers to aileron...
Details
06-18-2009
2.00
Finalized elevator control at cargo wall...
Details
03-16-2009
1.00
Complied with Van's flap SB 04-11-07...
Details
07-23-2008
1.50
More reworking for proper rigging...
Details
07-14-2008
3.00
Cut control stick to use CH stick....
Details
07-08-2008
3.00
Installed A/P roll servo ...
Details
06-23-2008
3.00
Measured and drilled brackets for a/p pitch servo.
Details
10-09-2007
2.50
Rerigged ailerons to get limits....
Details
09-25-2007
1.50
Installed flap control rods...
Details
09-20-2007
2.00
More adjusting flight controls...
Details
09-20-2007
1.50
Installed elevator...
Details
09-11-2007
2.50
Ailerons installed, adjusting control rods...
Details
09-10-2007
2.50
Adjusting ailerons for proper deflection...
Details
04-12-2007
1.00
Safety wired flap pins to prevent movement...
Details
02-21-2007
1.50
Removed L/Rwing tips ...
Details
02-21-2007
1.50
Final fitting L/R flaps for retraction...
Details
02-20-2007
2.00
More filing to fit rudder inside VS web...
Details
12-12-2006
2.50
Bolting HS in place and filing aft elev. stop...
Details
12-05-2006
2.00
Refabricating F-611E fwd elevator stop...
Details
08-23-2006
2.00
More installation of control sticks...
Details
08-21-2006
2.00
Began reinstalling flt. controls and taped rudder.
Details
10-10-2005
1.00
Trimmed bottom edge of nylon rudder cable...
Details
03-29-2005
4.50
Trimming L flap; drill R flap hole...
Details
03-28-2005
4.00
Installed L aileron; trimming L flap ...
Details
03-26-2005
2.00
Fitting R wing flap to fuselage...
Details
12-19-2004
1.00
Drilled F690 pushrod & VA101 with 8 holes....
Details
06-22-2004
1.50
Attached F-690 elevator control rod in position...
Details
01-14-2004
2.00
Trimmed elevator stop for more up...
Details
01-12-2004
1.00
Cut 6" .063 1"x1" alum for mounting trim...
Details
12-19-2003
1.00
Drilled F-690 pushrod & VA101 with 8 holes...
Details
11-23-2003
1.00
Drilled rudder stops to fuselage..
Details
11-18-2003
3.00
Fabricated rudder stops, temporary cable fairleads
Details
10-17-2003
1.50
Drilled out rivets holding trim tab horn...
Details
10-16-2003
1.50
Drilled & fitted L adel clamp bracket to F-610...
Details
10-11-2003
1.50
Fitted & drilled adel clamp bracket to F610...
Details
09-14-2003
1.00
Fabricating attachments for rudder cable...
Details
04-09-2002
2.50
Installed elevator bell crank assembly..
Details
04-08-2002
2.00
Fitted right flap brace...
Details
03-25-2002
3.50
Mounted flap actuator on R flap...
Details
03-14-2002
1.50
Right aileron travel...
Details
03-05-2002
7.00
Fitting right aileron...
Details
02-26-2002
3.50
Aligned flap to wing, drilled hinge...
Details
02-14-2002
4.50
Riveted R ail. bracket in place...
Details
02-07-2002
2.00
Cut lightening holes in flap braces...
Details
02-06-2002
3.00
Fabricated FL606A/B/C...
Details
02-05-2002
4.00
Fabricated aileron control rod...
Details
02-04-2002
3.50
Fitted left aileron...
Details
01-30-2002
3.50
Drilled 4 aileron brackets...
Details
01-28-2002
2.50
Complete elev. trim tab...
Details
01-21-2002
4.00
Fabricate trim tab for left elevator..
Details
09-19-2001
7.50
Fitted and connected control sticks...
Details
09-08-2001
0.80
Reamed out one brass control bushing...
Details
09-05-2001
2.20
Cut, polished left control stick opening...
Details
SITE NAVIGATION
Contact Builder
RV-6A QB Home
Category
# Logs
# Hours
All
1708
3742
A/C Hardware & Supplies
11
20
Ailerons
23
48
Avionics
3
5
Brakes
6
10
Canopy
121
238
Canopy
13
25
Empennage
78
162
Engine
1
1
fiberglass
92
208
Firewall Forward
78
166
Flaps
29
59
Flight controls
71
175
Flight controls
63
153
Fuel tanks/lines
30
64
Fuel tanks/lines
6
10
Fuselage
100
203
Hardware
10
16
Insturment Panel
115
279
Interior
63
149
Lycoming IO360
5
10
Miscellaneous
61
144
MT propeller
13
25
Painting preparation
29
59
Paperwork
19
36
Parts fabrication
23
48
Polishing
16
39
Rudder/Brakes
20
31
Rudder/Brakes
63
153
Shipping
8
26
Shop Supplies
23
47
Subaru engine
57
117
Subaru Engine
1
1
Systems
32
64
Tools
8
13
Trim tab
121
238
Trim tab
6
19
Weight & Balance
3
10
Wheels/tires/gear
16
39
Wheels/tires/gear
43
90
Wings
114
277
Wiring
71
175
Wiring
43
90
Copyright © 2001-2024 Matronics. All Rights Reserved.