Powered By Kitlog Pro v2.0
RON'S WEB SITE
RV-6A QB
Subaru engine
Work Logs Found:
57
Category Work Time:
117 Hours
Date
Hours
Work Log Summary
Details
12-02-2013
2.50
Removed R head to expose piston...
Details
10-22-2013
2.00
Diagnosing engine problem...
Details
03-12-2012
2.50
Positioning new rads & modifying for fit...
Details
02-02-2012
2.50
Finalizing radiator mockups and adding brackets...
Details
02-01-2012
3.00
Fitting mock radiators...
Details
01-27-2012
1.00
Met Techweld Ed for radiator order...
Details
07-09-2011
0.50
Received newer larger radiatiors...
Details
04-11-2011
1.50
Trimming cowl for better cooling...
Details
02-19-2011
2.00
Adding Adel clamps for hose support...
Details
02-07-2011
1.50
Installing muffler & WB sensor after welding...
Details
12-11-2010
2.00
Attached Chevy orange muffler brace...
Details
12-10-2010
2.00
Fabrication muffler template to weld actual....
Details
12-03-2010
2.00
Fitting/cutting muffler pipes for alignment...
Details
12-02-2010
3.00
Rehanging and aligning internal muffler...
Details
11-09-2010
2.00
Repositioned internal muffler further aft...
Details
09-08-2010
2.50
More engine fuel/air ratio testing...
Details
09-02-2010
2.50
More programming SDS fuel/air...
Details
09-01-2010
4.00
Setting air/fuel on engine...
Details
08-31-2010
2.50
Setting timing schedule on SDS system...
Details
08-05-2010
1.50
Engine start and first taxi of aircraft...
Details
05-17-2010
3.50
Getting gearbox changeover complete...
Details
05-14-2010
3.50
Adding washers behind spacers for clearance...
Details
05-12-2010
2.00
Preparing engine plate for spacers...
Details
05-11-2010
4.50
Installed Gen3 gearbox...
Details
05-10-2010
3.50
Preparing engine for geearbox upgrade...
Details
04-10-2010
1.00
Spliced fuel flow wires/ran engine for test...
Details
03-01-2010
3.00
Reinstalling flywheel, alternator, intake manifold
Details
02-22-2010
1.50
Installed SDS timing magnets in pulley....
Details
02-19-2010
1.00
Removed old timing sensor, installed new...
Details
02-18-2010
1.00
Used template to mark pulley..drilled for magnets.
Details
02-09-2010
1.50
Airtemp sensor modified for SDS...
Details
01-27-2010
2.00
Fabricating bushings for alt/firewall...
Details
01-26-2010
1.00
Took intake assembly for modification...
Details
01-22-2010
2.20
Removed alt. pulley for rework for SDS...
Details
01-21-2010
2.00
Attempted removal of alt/timing pulley...
Details
01-19-2010
2.00
Removed intake manifold, fuel rails, alt...
Details
11-11-2009
1.50
Gentlemen:Start your engine(s)...
Details
11-06-2009
0.80
Clipped fuel injectors & coil fittings...
Details
11-05-2009
2.00
Removed Subaru ECU & wires from inside...
Details
07-24-2009
0.50
Reworked fuel rail fuel press. reg...
Details
07-08-2008
3.00
Engine/panel planning for wiring...
Details
06-03-2008
0.50
Removed exhaust system for muffler upgrade...
Details
03-12-2008
2.50
More fitting of cowl...
Details
07-02-2007
2.30
Hung engine hoist from I-beam, plane off gear...
Details
05-10-2007
1.50
Completed ECM mount
Details
05-07-2007
2.00
Removed remainder of steel ECM brackets...
Details
04-26-2007
3.00
Wrapped O2 sensors, fuel hose, made eng. grd...
Details
01-25-2007
2.00
Plumbed coolant lines and filled with fluid...
Details
01-12-2007
3.50
Subaru pressure relief & exhaust installed...
Details
01-11-2007
1.00
Drained coolant & removed thermostat housing...
Details
12-20-2006
1.50
Trimmed 1/8" off engine mounts, retorqued...
Details
11-17-2006
4.00
Mounted Subaru engine to firewall....
Details
05-15-2005
2.00
Remounted engine on stand...
Details
02-08-2005
2.00
Removed engine from mount...
Details
03-26-2004
1.00
Viewed Subaru installation video...
Details
03-23-2004
1.00
Viewed Subaru installation video....
Details
03-22-2004
1.00
Unloaded Eggenfellner firewall forward Subaru...
Details
SITE NAVIGATION
Contact Builder
RV-6A QB Home
Category
# Logs
# Hours
All
1708
3742
A/C Hardware & Supplies
11
20
Ailerons
23
48
Avionics
3
5
Brakes
6
10
Canopy
121
238
Canopy
13
25
Empennage
78
162
Engine
1
1
fiberglass
92
208
Firewall Forward
78
166
Flaps
29
59
Flight controls
71
175
Flight controls
63
153
Fuel tanks/lines
30
64
Fuel tanks/lines
6
10
Fuselage
100
203
Hardware
10
16
Insturment Panel
115
279
Interior
63
149
Lycoming IO360
5
10
Miscellaneous
61
144
MT propeller
13
25
Painting preparation
29
59
Paperwork
19
36
Parts fabrication
23
48
Polishing
16
39
Rudder/Brakes
20
31
Rudder/Brakes
63
153
Shipping
8
26
Shop Supplies
23
47
Subaru engine
57
117
Subaru Engine
1
1
Systems
32
64
Tools
8
13
Trim tab
121
238
Trim tab
6
19
Weight & Balance
3
10
Wheels/tires/gear
16
39
Wheels/tires/gear
43
90
Wings
114
277
Wiring
71
175
Wiring
43
90
Copyright © 2001-2024 Matronics. All Rights Reserved.