Powered By Kitlog Pro v2.0
RON'S WEB SITE
RV-6A QB
Systems
Work Logs Found:
32
Category Work Time:
64 Hours
Date
Hours
Work Log Summary
Details
03-29-2012
1.50
Finished riveting ELT bracket in new location...
Details
03-28-2012
1.50
Moving ELT aft-remaking bracket...
Details
03-27-2012
2.50
Moving ELT closer to tail to help move cg aft...
Details
02-07-2012
2.00
Pulled seat pans for access below...
Details
06-03-2011
2.50
Installed fittings for Manometer on R radiator...
Details
05-03-2011
1.00
Used compass rose for mag. compass adjust...
Details
07-07-2010
3.00
Attached A/P blue serial 232 wire to EFIS...
Details
03-30-2010
3.00
Completed pitot/satatic lines to alt/airspeed...
Details
03-29-2010
2.50
Supplied static/pitot to AHARS....
Details
03-25-2010
1.50
Installed grommets for pitot line in F604-F606...
Details
03-24-2010
1.50
Drilling 5/8" holes thru side ribs...
Details
03-23-2010
1.00
Drilled 5/8" hole thru both webs of F604...
Details
01-29-2010
2.00
Studying SDS install videos by Pete Krok...
Details
10-26-2009
1.50
GTX-327 antenna installed...
Details
10-21-2009
2.50
Programming EFIS/GPS...
Details
07-16-2009
1.00
Realigned fuel hoses for better routing...
Details
07-02-2009
4.00
Ess. Bus bar installed, CB, labels, GPS tray mod .
Details
04-28-2009
3.00
Completed pilot infinity stick grip installation..
Details
04-27-2009
2.00
Shortened pilot control stick...
Details
04-21-2009
2.50
Removed pilot control stick for infinity install..
Details
04-14-2009
2.50
Completing flap sensor & firewall nutplates...
Details
03-25-2009
3.00
Reinstalled flap motor & adjusted arms...
Details
03-24-2009
2.50
Installed UHMW protective tape & flap motor...
Details
03-02-2009
1.50
Trimming excell wires off Softcomm Intercom...
Details
10-13-2008
0.70
Finalizing L wing root fuel fittings...
Details
10-10-2008
1.50
Finalized fuel vents underneath aircraft...
Details
02-04-2008
1.00
...Drilled for snap bushing entering R cockpit...
Details
01-18-2008
1.00
Mounting magnetometer on aft tail deck...
Details
06-29-2004
3.50
Installed static line T-fitting which is 1/4" poly
Details
06-28-2004
2.50
Removed top aft skin, drilled static pitot ports..
Details
03-02-2004
0.80
Riveted pitot tube to inside of wing spar...
Details
12-11-2003
1.00
Installed pitot line in L wing...
Details
SITE NAVIGATION
Contact Builder
RV-6A QB Home
Category
# Logs
# Hours
All
1708
3742
A/C Hardware & Supplies
11
20
Ailerons
23
48
Avionics
3
5
Brakes
6
10
Canopy
121
238
Canopy
13
25
Empennage
78
162
Engine
1
1
fiberglass
92
208
Firewall Forward
78
166
Flaps
29
59
Flight controls
71
175
Flight controls
63
153
Fuel tanks/lines
30
64
Fuel tanks/lines
6
10
Fuselage
100
203
Hardware
10
16
Insturment Panel
115
279
Interior
63
149
Lycoming IO360
5
10
Miscellaneous
61
144
MT propeller
13
25
Painting preparation
29
59
Paperwork
19
36
Parts fabrication
23
48
Polishing
16
39
Rudder/Brakes
20
31
Rudder/Brakes
63
153
Shipping
8
26
Shop Supplies
23
47
Subaru engine
57
117
Subaru Engine
1
1
Systems
32
64
Tools
8
13
Trim tab
121
238
Trim tab
6
19
Weight & Balance
3
10
Wheels/tires/gear
16
39
Wheels/tires/gear
43
90
Wings
114
277
Wiring
71
175
Wiring
43
90
Copyright © 2001-2024 Matronics. All Rights Reserved.