Powered By Kitlog Pro v2.0
RON'S WEB SITE
RV-6A QB
Miscellaneous
Work Logs Found:
61
Category Work Time:
144 Hours
Date
Hours
Work Log Summary
Details
05-16-2011
1.00
Took my bride for a ride...
Details
03-08-2011
2.00
Adjusted AFR for engine power SDS meter...
Details
03-02-2011
1.50
Landing and celebration of first flight...
Details
03-02-2011
2.00
First flight...
Details
03-01-2011
1.50
Final preparation for flight...
Details
02-21-2011
3.00
Securing wires & clamps for flight...
Details
02-17-2011
4.00
Preparing interior for flight...
Details
02-16-2011
3.00
Readying plane for final inspection for certifying
Details
12-14-2010
1.00
Photos for Christmas...
Details
08-10-2010
2.50
Returned Bus MGR for repair, heat shield..
Details
08-01-2009
1.00
Inspection by EAA tech. counselor Gale Derosier
Details
07-16-2009
1.50
Painting and constructing sides of trailer...
Details
12-09-2008
1.50
Photo ops for Christmas newsletter
Details
01-04-2008
0.50
Gathering projects to work on in basement...
Details
01-03-2008
1.80
Researched and purchased labelmaker...
Details
08-07-2007
2.50
Licensing &wiring trailer & truck...
Details
07-31-2007
2.50
Running wires for trailer lights...
Details
07-27-2007
3.00
Trailer installation project...
Details
07-16-2007
1.50
Painting and constructing sides of trailer...
Details
07-12-2007
2.50
Painting & constructing side rails for the trailer
Details
07-11-2007
1.50
Trailer construction on sides and tank...
Details
07-10-2007
2.50
Made plywood floor for trailer, modified tank...
Details
07-06-2007
3.00
Assembling fuel trailer...
Details
07-05-2007
1.50
Began assembling fuel trailer...
Details
07-01-2007
1.50
Put up hanging light, sorting parts...
Details
06-29-2007
3.50
Tidying new hangar...
Details
06-27-2007
4.00
sorting tools & unpacking supplies...
Details
06-25-2007
2.00
Cleco pliars finally found...
Details
06-22-2007
2.00
Finding places for tools in chests...
Details
06-08-2007
2.50
Readying hangar for use & decorating...
Details
06-07-2007
2.00
Putting tools away
Details
06-06-2007
3.00
More sorting and organizing with professional help
Details
06-04-2007
2.00
Took load of tools & supplies to M71...
Details
06-03-2007
2.50
Decorating and arranging tools in hangar...
Details
06-02-2007
3.50
Moved plane from SUS to M71...
Details
06-01-2007
3.50
Moving wings and desk to M71...
Details
05-31-2007
4.50
Readying plane for travel, loaded truck for M71...
Details
05-30-2007
3.00
Readying plane for move & packing/moving gear...
Details
05-28-2007
4.00
Removed final bolts, pulled wings...
Details
05-23-2007
3.00
Removed tail feathers for move...
Details
05-22-2007
1.50
Moved some stuff from the hangar to home...
Details
05-18-2007
2.50
Removing wing nuts/bolts...
Details
05-10-2007
1.00
Removing wing spar bolts in prep. for move...
Details
05-09-2007
2.50
Son Mark rented a hangar big enough for us...
Details
04-24-2007
2.00
Finishing reorganizing shop and desk...
Details
04-23-2007
4.00
Reorganizing tools and posters...
Details
04-20-2007
4.00
Labeling parts & reorganizing tools & pegboards...
Details
02-06-2007
2.00
Built workbench for basement for electric work...
Details
01-15-2007
1.50
Ordered decals, electric supplies...
Details
12-22-2006
2.00
Organizing tools, parts and hangar space...
Details
11-22-2006
2.00
Finished fabricating 12" stand for working ease...
Details
11-20-2006
2.00
Disassembling fuselage cradle & building workstand
Details
11-19-2006
1.00
Clecoed tail on for photo op...
Details
11-15-2006
1.50
Built up fuselage stand & modified Pete's stand...
Details
08-07-2006
2.50
Inspection by EAA tech. counselor Gale Derosier
Details
11-29-2005
2.00
More shop preparation, storage shelves, sorting.
Details
05-03-2005
1.00
Purchased DD's SUS hangar...
Details
08-19-2004
1.50
Built frame to engine to allow engine to sit level
Details
01-22-2004
0.50
Photographed Collide cat in cockpit...
Details
01-11-2004
4.00
Aeroelectric Bob Seminar on wiring principles...
Details
01-10-2004
8.00
Drilled F-690 pushrod & VA101 with 8 holes...
Details
SITE NAVIGATION
Contact Builder
RV-6A QB Home
Category
# Logs
# Hours
All
1708
3742
A/C Hardware & Supplies
11
20
Ailerons
23
48
Avionics
3
5
Brakes
6
10
Canopy
121
238
Canopy
13
25
Empennage
78
162
Engine
1
1
fiberglass
92
208
Firewall Forward
78
166
Flaps
29
59
Flight controls
71
175
Flight controls
63
153
Fuel tanks/lines
30
64
Fuel tanks/lines
6
10
Fuselage
100
203
Hardware
10
16
Insturment Panel
115
279
Interior
63
149
Lycoming IO360
5
10
Miscellaneous
61
144
MT propeller
13
25
Painting preparation
29
59
Paperwork
19
36
Parts fabrication
23
48
Polishing
16
39
Rudder/Brakes
20
31
Rudder/Brakes
63
153
Shipping
8
26
Shop Supplies
23
47
Subaru engine
57
117
Subaru Engine
1
1
Systems
32
64
Tools
8
13
Trim tab
121
238
Trim tab
6
19
Weight & Balance
3
10
Wheels/tires/gear
16
39
Wheels/tires/gear
43
90
Wings
114
277
Wiring
71
175
Wiring
43
90
Copyright © 2001-2024 Matronics. All Rights Reserved.