Date
|
Hours
|
Work Log Summary
|
Details
|
09-29-2010
|
5.00
|
Finalizing rivets & wiring...
|
Details
|
|
|
09-20-2010
|
3.00
|
Preparing for top skin installation...
|
Details
|
|
|
09-15-2010
|
2.50
|
More wire tying, reconnect L strobe...
|
Details
|
|
|
09-13-2010
|
2.50
|
Removed panel for final routing...
|
Details
|
|
|
08-26-2010
|
3.00
|
Finalizing panel wiring, D-sub covers...
|
Details
|
|
|
08-24-2010
|
2.50
|
Modified SL-40 antenna/D-sub access...
|
Details
|
|
|
07-27-2010
|
1.00
|
Spliced in new bulb for L fuel Qty gage...
|
Details
|
|
|
07-23-2010
|
1.50
|
Modified AOA display for maintainence...
|
Details
|
|
|
06-22-2010
|
4.00
|
Rewiring fuel relay, firewall passthru installed..
|
Details
|
|
|
04-24-2010
|
1.50
|
Replacing labels to updated status...
|
Details
|
|
|
03-31-2010
|
1.00
|
Drilled 3/8" hole for mixture knob
|
Details
|
|
|
03-22-2010
|
1.50
|
Installed AFR gage in panel...
|
Details
|
|
|
03-10-2010
|
2.00
|
Drilled 2" hole for AFR in panel, SS firewall piec
|
Details
|
|
|
03-02-2010
|
2.50
|
Drilled mounting holes for 31/8" SDS CRT...
|
Details
|
|
|
03-01-2010
|
2.00
|
Hole for SDS drilled in panel, mounting bracket..
|
Details
|
|
|
10-30-2009
|
3.00
|
Icom & wiring progress...
|
Details
|
|
|
10-13-2009
|
3.50
|
Powered trim/LED, soldered ORG/GRN/BLU...
|
Details
|
|
|
10-09-2009
|
3.00
|
Soldered LED wires, GRD LED to panel...
|
Details
|
|
|
10-06-2009
|
3.50
|
Heater wires routed, A/P & dimmer power to fuse...
|
Details
|
|
|
10-05-2009
|
2.00
|
Fuel gage current wire, R fuel gage grd...
|
Details
|
|
|
09-30-2009
|
4.00
|
Fuel gage lights, AOA powered, Volt/Amp works...
|
Details
|
|
|
09-28-2009
|
3.00
|
Assembling wiring to light dimmer...
|
Details
|
|
|
09-17-2009
|
2.50
|
Modified R air vent to ease removal...
|
Details
|
|
|
09-16-2009
|
4.50
|
More wire routing,AOA flap wire, ICOM, SL40...
|
Details
|
|
|
09-15-2009
|
4.00
|
Loaded EFIS updates to EFIS/AHARS/Nav Data...
|
Details
|
|
|
09-14-2009
|
3.00
|
Drilled AOA dimmer adj. hole & Icom batt..
|
Details
|
|
|
09-11-2009
|
2.00
|
Tying, shortening, rerouting behind panel...
|
Details
|
|
|
09-10-2009
|
3.00
|
Installed both air vents & GTX-327...
|
Details
|
|
|
09-08-2009
|
3.50
|
Rerouting panel wires &EFIS settings...
|
Details
|
|
|
09-04-2009
|
2.00
|
Fired up EFIS panel...
|
Details
|
|
|
09-01-2009
|
5.00
|
Flap wiring, EFIS clock pwr, EFIS/AHARS pwr...
|
Details
|
|
|
08-28-2009
|
2.50
|
Aligning & planning panel old fashioned way...
|
Details
|
|
|
08-27-2009
|
1.00
|
EIS fired up, tested fuel pumps, not yet...
|
Details
|
|
|
08-26-2009
|
1.50
|
Labeled fuel pump lights & modified Bus Mgr...
|
Details
|
|
|
08-10-2009
|
3.50
|
Wired clock, VA-1A, Avionics bus switch...
|
Details
|
|
|
08-03-2009
|
3.50
|
More labels, wires to switches & circuit breakers.
|
Details
|
|
|
07-30-2009
|
2.50
|
Made & applied panel labels...
|
Details
|
|
|
07-23-2009
|
3.00
|
Main /Aux fuel pump panel lights, grds, ECU CB...
|
Details
|
|
|
07-22-2009
|
4.00
|
ALT wire to CB, wired fuel pumps, labels...
|
Details
|
|
|
07-21-2009
|
2.50
|
Completed Grd Bus, some Grd wires...
|
Details
|
|
|
07-20-2009
|
2.00
|
Rewired #8 wires to Bus MGR...
|
Details
|
|
|
07-17-2009
|
2.50
|
More wiring on Bus manager...
|
Details
|
|
|
07-16-2009
|
4.50
|
Protek rewired, wires connected to Main Bus...
|
Details
|
|
|
07-15-2009
|
3.50
|
Wired fuel relay, added GRD BUS, ESS BUS work.
|
Details
|
|
|
07-14-2009
|
3.50
|
Bundling & sorting wires, MAP sensor, Main Bus ...
|
Details
|
|
|
07-08-2009
|
3.00
|
Soldered Keep alive, installed more CB, latch...
|
Details
|
|
|
07-07-2009
|
3.00
|
Fabricating Main bus tray for panel...
|
Details
|
|
|
07-04-2009
|
3.50
|
Added nutplates,ECU cb bypass sw, more labels...
|
Details
|
|
|
07-03-2009
|
2.50
|
Instrument panel planning...
|
Details
|
|
|
07-01-2009
|
3.50
|
Fabricated dimmer bracket, drilled for dimmer...
|
Details
|
|
|
06-30-2009
|
3.00
|
drilled panel for 6 more switches...
|
Details
|
|
|
06-23-2009
|
1.50
|
Drilled more cb/switches...
|
Details
|
|
|
06-22-2009
|
3.00
|
Panel planning session...
|
Details
|
|
|
06-17-2009
|
2.00
|
Fabricated switch template...
|
Details
|
|
|
06-15-2009
|
1.00
|
Drilled for AOA & PTT panel pushbuttons...
|
Details
|
|
|
06-04-2009
|
1.50
|
Ordered parts from Steinair & traced injector wire
|
Details
|
|
|
06-03-2009
|
2.00
|
Ran manifold line to engine & drilled ignition key
|
Details
|
|
|
05-26-2009
|
1.50
|
Shortened EMER Power wires & re-installed...
|
Details
|
|
|
05-11-2009
|
1.00
|
Picked up painted instrument panel...
|
Details
|
|
|
04-29-2009
|
2.50
|
Riveted the glovebox to the instrument panel...
|
Details
|
|
|
04-20-2009
|
3.00
|
Tagging & routing wires for lights & intercom...
|
Details
|
|
|
04-16-2009
|
3.50
|
Added ALT CB, nutplates for trim ind...
|
Details
|
|
|
04-13-2009
|
2.50
|
Filled panel holes with rivets..
|
Details
|
|
|
03-12-2009
|
1.30
|
Cutout panel for Hobbs meter...
|
Details
|
|
|
03-05-2009
|
2.50
|
Cut slots for ELT/Intercomm in panel...
|
Details
|
|
|
02-25-2009
|
2.50
|
Drilling 3/8 hole thru F604 for panel access...
|
Details
|
|
|
02-11-2009
|
2.50
|
Tied & routed L wing wires into panel...
|
Details
|
|
|
02-05-2009
|
1.50
|
Planning session for EXPBUS & panel wiring...
|
Details
|
|
|
01-21-2009
|
2.50
|
Installed MAP sensor on subpanel...
|
Details
|
|
|
11-04-2008
|
2.50
|
Making mounting brackets for AOA box...
|
Details
|
|
|
11-03-2008
|
1.50
|
Finished sub panel fittings for glove box...
|
Details
|
|
|
10-29-2008
|
3.00
|
AHARS deck painted, ready to rivet in...
|
Details
|
|
|
10-25-2008
|
1.00
|
Cut angle alum. supports for glove box...
|
Details
|
|
|
10-13-2008
|
0.50
|
Riveted glove box together...
|
Details
|
|
|
10-03-2008
|
2.00
|
Riveted glove box door, drilled for latch...
|
Details
|
|
|
10-02-2008
|
1.50
|
More work on glove box...
|
Details
|
|
|
10-01-2008
|
3.00
|
Cut opening in panel for glove box...
|
Details
|
|
|
09-25-2008
|
1.50
|
Fitting glove box to sub-panel...
|
Details
|
|
|
09-17-2008
|
2.50
|
Cut hole in sub panel for glove box...
|
Details
|
|
|
09-16-2008
|
2.00
|
Drilled inst. panel screws using template...
|
Details
|
|
|
09-11-2008
|
2.50
|
Cutting instrument holes for panel...
|
Details
|
|
|
09-09-2008
|
1.50
|
Practice cut for alt/airspeed...
|
Details
|
|
|
09-08-2008
|
2.00
|
Glove box layout & planning, EFIS ...
|
Details
|
|
|
09-05-2008
|
3.50
|
Cut EFIS hole,planning for next cut...
|
Details
|
|
|
09-04-2008
|
1.00
|
Measured & drilled starter holes for EFIS...
|
Details
|
|
|
08-28-2008
|
3.50
|
Received DD Gen III transmission, wiring advice...
|
Details
|
|
|
08-27-2008
|
3.00
|
Installed EXPBUS, polished some...
|
Details
|
|
|
08-07-2008
|
4.00
|
Spent day making radio racks fit & secure...
|
Details
|
|
|
08-05-2008
|
3.00
|
Installed EXPBUS nutplates, polished L-HS...
|
Details
|
|
|
07-22-2008
|
3.50
|
Cut SL-40 opening above transponder...
|
Details
|
|
|
07-21-2008
|
3.50
|
Cut transponder opening & attached supports...
|
Details
|
|
|
07-15-2008
|
3.00
|
Installed EXPBUS on subpanel...
|
Details
|
|
|
07-12-2008
|
0.50
|
Filed EIS opening to size....
|
Details
|
|
|
07-11-2008
|
2.00
|
Measuring & cut EIS slot in panel...
|
Details
|
|
|
07-06-2008
|
3.00
|
Installed EXPBUS on subpanel...
|
Details
|
|
|
02-12-2008
|
2.00
|
Working on panel planner...
|
Details
|
|
|
08-01-2006
|
1.00
|
Completed riveting panel brace
|
Details
|
|
|
07-28-2006
|
2.50
|
Worked on tip up canopy additions & panel braces
|
Details
|
|
|
03-01-2006
|
3.00
|
Finished installing nutplates, air vents to panel.
|
Details
|
|
|
02-27-2006
|
2.50
|
Fabricated vent brackets & inst. panel layout...
|
Details
|
|
|
02-22-2006
|
2.00
|
Removed inst. panel, primed some area...
|
Details
|
|
|
01-28-2005
|
0.50
|
Primed panel angle attachments...
|
Details
|
|
|
08-22-2004
|
1.00
|
Drilled 2 center & L angle brace to panel...
|
Details
|
|
|
08-21-2004
|
3.50
|
More filing, fitting, C-clamped alum angle to file
|
Details
|
|
|
08-20-2004
|
1.50
|
Removed top skin & filed on top of Inst. panel...
|
Details
|
|
|
08-19-2004
|
1.00
|
Removed top skin & filed on top of Inst. panel...
|
Details
|
|
|
08-18-2004
|
3.00
|
More trimming, filing of Inst. panel...
|
Details
|
|
|
08-17-2004
|
2.00
|
Cutting, trimming & fitting F-6103 Instrument pane
|
Details
|
|
|
08-12-2004
|
1.00
|
Unpacked MT prop, measuring possible NACA...
|
Details
|
|
|
08-04-2004
|
0.50
|
Planning & measuring panel mockup using template.
|
Details
|
|
|
07-01-2004
|
0.50
|
Glued template to cardboard mockup...
|
Details
|
|
|
06-30-2004
|
1.00
|
Printed full size panel mock up from Affordable...
|
Details
|
|
|
08-18-2003
|
1.50
|
Trimmed inst. panel-prelim cut...
|
Details
|
|
|
04-23-2003
|
3.00
|
Fabricated angle alum for inst. panel...
|
Details
|
|
|
03-19-2003
|
2.00
|
Fashioned mock inst. panel...
|
Details
|
|