KitLog pro

Powered By Kitlog Pro v2.0

RON'S WEB SITE
Work Logs Found: 115
Category Work Time: 279 Hours
 Date
Hours
Work Log Summary

Details

 09-29-2010
5.00
Finalizing rivets & wiring...
Details
       

 09-20-2010
3.00
Preparing for top skin installation...
Details
       

 09-15-2010
2.50
More wire tying, reconnect L strobe...
Details
       

 09-13-2010
2.50
Removed panel for final routing...
Details
     

 08-26-2010
3.00
Finalizing panel wiring, D-sub covers...
Details
       

 08-24-2010
2.50
Modified SL-40 antenna/D-sub access...
Details
     

 07-27-2010
1.00
Spliced in new bulb for L fuel Qty gage...
Details

 07-23-2010
1.50
Modified AOA display for maintainence...
Details

 06-22-2010
4.00
Rewiring fuel relay, firewall passthru installed..
Details
       

 04-24-2010
1.50
Replacing labels to updated status...
Details
       

 03-31-2010
1.00
Drilled 3/8" hole for mixture knob
Details
       

 03-22-2010
1.50
Installed AFR gage in panel...
Details
     

 03-10-2010
2.00
Drilled 2" hole for AFR in panel, SS firewall piec
Details
       

 03-02-2010
2.50
Drilled mounting holes for 31/8" SDS CRT...
Details

 03-01-2010
2.00
Hole for SDS drilled in panel, mounting bracket..
Details

 10-30-2009
3.00
Icom & wiring progress...
Details

 10-13-2009
3.50
Powered trim/LED, soldered ORG/GRN/BLU...
Details

 10-09-2009
3.00
Soldered LED wires, GRD LED to panel...
Details

 10-06-2009
3.50
Heater wires routed, A/P & dimmer power to fuse...
Details
     

 10-05-2009
2.00
Fuel gage current wire, R fuel gage grd...
Details
     

 09-30-2009
4.00
Fuel gage lights, AOA powered, Volt/Amp works...
Details
       

 09-28-2009
3.00
Assembling wiring to light dimmer...
Details
     

 09-17-2009
2.50
Modified R air vent to ease removal...
Details
     

 09-16-2009
4.50
More wire routing,AOA flap wire, ICOM, SL40...
Details
     

 09-15-2009
4.00
Loaded EFIS updates to EFIS/AHARS/Nav Data...
Details
     

 09-14-2009
3.00
Drilled AOA dimmer adj. hole & Icom batt..
Details
     

 09-11-2009
2.00
Tying, shortening, rerouting behind panel...
Details
       

 09-10-2009
3.00
Installed both air vents & GTX-327...
Details

 09-08-2009
3.50
Rerouting panel wires &EFIS settings...
Details
       

 09-04-2009
2.00
Fired up EFIS panel...
Details
       

 09-01-2009
5.00
Flap wiring, EFIS clock pwr, EFIS/AHARS pwr...
Details
     

 08-28-2009
2.50
Aligning & planning panel old fashioned way...
Details

 08-27-2009
1.00
EIS fired up, tested fuel pumps, not yet...
Details
     

 08-26-2009
1.50
Labeled fuel pump lights & modified Bus Mgr...
Details

 08-10-2009
3.50
Wired clock, VA-1A, Avionics bus switch...
Details

 08-03-2009
3.50
More labels, wires to switches & circuit breakers.
Details
       

 07-30-2009
2.50
Made & applied panel labels...
Details
       

 07-23-2009
3.00
Main /Aux fuel pump panel lights, grds, ECU CB...
Details
     

 07-22-2009
4.00
ALT wire to CB, wired fuel pumps, labels...
Details

 07-21-2009
2.50
Completed Grd Bus, some Grd wires...
Details
       

 07-20-2009
2.00
Rewired #8 wires to Bus MGR...
Details

 07-17-2009
2.50
More wiring on Bus manager...
Details
     

 07-16-2009
4.50
Protek rewired, wires connected to Main Bus...
Details
       

 07-15-2009
3.50
Wired fuel relay, added GRD BUS, ESS BUS work.
Details
       

 07-14-2009
3.50
Bundling & sorting wires, MAP sensor, Main Bus ...
Details
     

 07-08-2009
3.00
Soldered Keep alive, installed more CB, latch...
Details
       

 07-07-2009
3.00
Fabricating Main bus tray for panel...
Details
     

 07-04-2009
3.50
Added nutplates,ECU cb bypass sw, more labels...
Details
       

 07-03-2009
2.50
Instrument panel planning...
Details
     

 07-01-2009
3.50
Fabricated dimmer bracket, drilled for dimmer...
Details
       

 06-30-2009
3.00
drilled panel for 6 more switches...
Details
     

 06-23-2009
1.50
Drilled more cb/switches...
Details
     

 06-22-2009
3.00
Panel planning session...
Details
     

 06-17-2009
2.00
Fabricated switch template...
Details
       

 06-15-2009
1.00
Drilled for AOA & PTT panel pushbuttons...
Details
     

 06-04-2009
1.50
Ordered parts from Steinair & traced injector wire
Details

 06-03-2009
2.00
Ran manifold line to engine & drilled ignition key
Details
     

 05-26-2009
1.50
Shortened EMER Power wires & re-installed...
Details
     

 05-11-2009
1.00
Picked up painted instrument panel...
Details
       

 04-29-2009
2.50
Riveted the glovebox to the instrument panel...
Details

 04-20-2009
3.00
Tagging & routing wires for lights & intercom...
Details

 04-16-2009
3.50
Added ALT CB, nutplates for trim ind...
Details
       

 04-13-2009
2.50
Filled panel holes with rivets..
Details

 03-12-2009
1.30
Cutout panel for Hobbs meter...
Details
       

 03-05-2009
2.50
Cut slots for ELT/Intercomm in panel...
Details
     

 02-25-2009
2.50
Drilling 3/8 hole thru F604 for panel access...
Details
       

 02-11-2009
2.50
Tied & routed L wing wires into panel...
Details

 02-05-2009
1.50
Planning session for EXPBUS & panel wiring...
Details

 01-21-2009
2.50
Installed MAP sensor on subpanel...
Details
     

 11-04-2008
2.50
Making mounting brackets for AOA box...
Details
     

 11-03-2008
1.50
Finished sub panel fittings for glove box...
Details
       

 10-29-2008
3.00
AHARS deck painted, ready to rivet in...
Details

 10-25-2008
1.00
Cut angle alum. supports for glove box...
Details
     

 10-13-2008
0.50
Riveted glove box together...
Details

 10-03-2008
2.00
Riveted glove box door, drilled for latch...
Details

 10-02-2008
1.50
More work on glove box...
Details

 10-01-2008
3.00
Cut opening in panel for glove box...
Details
       

 09-25-2008
1.50
Fitting glove box to sub-panel...
Details

 09-17-2008
2.50
Cut hole in sub panel for glove box...
Details
     

 09-16-2008
2.00
Drilled inst. panel screws using template...
Details
       

 09-11-2008
2.50
Cutting instrument holes for panel...
Details

 09-09-2008
1.50
Practice cut for alt/airspeed...
Details

 09-08-2008
2.00
Glove box layout & planning, EFIS ...
Details

 09-05-2008
3.50
Cut EFIS hole,planning for next cut...
Details
     

 09-04-2008
1.00
Measured & drilled starter holes for EFIS...
Details

 08-28-2008
3.50
Received DD Gen III transmission, wiring advice...
Details

 08-27-2008
3.00
Installed EXPBUS, polished some...
Details
     

 08-07-2008
4.00
Spent day making radio racks fit & secure...
Details
       

 08-05-2008
3.00
Installed EXPBUS nutplates, polished L-HS...
Details

 07-22-2008
3.50
Cut SL-40 opening above transponder...
Details
       

 07-21-2008
3.50
Cut transponder opening & attached supports...
Details
       

 07-15-2008
3.00
Installed EXPBUS on subpanel...
Details
       

 07-12-2008
0.50
Filed EIS opening to size....
Details
       

 07-11-2008
2.00
Measuring & cut EIS slot in panel...
Details

 07-06-2008
3.00
Installed EXPBUS on subpanel...
Details

 02-12-2008
2.00
Working on panel planner...
Details

 08-01-2006
1.00
Completed riveting panel brace
Details

 07-28-2006
2.50
Worked on tip up canopy additions & panel braces
Details

 03-01-2006
3.00
Finished installing nutplates, air vents to panel.
Details
       

 02-27-2006
2.50
Fabricated vent brackets & inst. panel layout...
Details
       

 02-22-2006
2.00
Removed inst. panel, primed some area...
Details
     

 01-28-2005
0.50
Primed panel angle attachments...
Details

 08-22-2004
1.00
Drilled 2 center & L angle brace to panel...
Details

 08-21-2004
3.50
More filing, fitting, C-clamped alum angle to file
Details
       

 08-20-2004
1.50
Removed top skin & filed on top of Inst. panel...
Details

 08-19-2004
1.00
Removed top skin & filed on top of Inst. panel...
Details

 08-18-2004
3.00
More trimming, filing of Inst. panel...
Details

 08-17-2004
2.00
Cutting, trimming & fitting F-6103 Instrument pane
Details

 08-12-2004
1.00
Unpacked MT prop, measuring possible NACA...
Details
     

 08-04-2004
0.50
Planning & measuring panel mockup using template.
Details

 07-01-2004
0.50
Glued template to cardboard mockup...
Details

 06-30-2004
1.00
Printed full size panel mock up from Affordable...
Details

 08-18-2003
1.50
Trimmed inst. panel-prelim cut...
Details
     

 04-23-2003
3.00
Fabricated angle alum for inst. panel...
Details

 03-19-2003
2.00
Fashioned mock inst. panel...
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.