Date
|
Hours
|
Work Log Summary
|
Details
|
08-13-2014
|
3.00
|
Access panel & MT prop removal
|
Details
|
|
|
05-29-2012
|
1.00
|
Completed radiator prep for engine start...
|
Details
|
|
|
04-24-2012
|
3.00
|
Positioning NACA intake;plenum intake...
|
Details
|
|
|
03-24-2012
|
1.00
|
Completed L rad installation...
|
Details
|
|
|
03-22-2012
|
3.00
|
Installing new rads...
|
Details
|
|
|
03-21-2012
|
3.00
|
Mounting new radiators on engine plate...
|
Details
|
|
|
03-19-2012
|
2.00
|
Installed rads with clamps for duct fitting...
|
Details
|
|
|
03-10-2012
|
0.50
|
Radiators arrived...
|
Details
|
|
|
02-03-2012
|
1.50
|
Batteries tested & cables made...
|
Details
|
|
|
01-31-2012
|
1.50
|
Removed batteries from firewall...
|
Details
|
|
|
11-02-2011
|
3.50
|
Tested aircraft and completed L airbox...
|
Details
|
|
|
11-01-2011
|
3.00
|
Modifying L inlet for smoother airflow...
|
Details
|
|
|
06-09-2011
|
2.00
|
Added additional cooling vent ...
|
Details
|
|
|
06-08-2011
|
2.00
|
installed R cooling vent...
|
Details
|
|
|
11-04-2010
|
2.50
|
Sealing firewall...
|
Details
|
|
|
08-27-2010
|
3.00
|
Installed Protek Bus Manager, HS fairings...
|
Details
|
|
|
07-27-2010
|
3.00
|
Installed last bulkhead fitting, grommets...
|
Details
|
|
|
07-21-2010
|
3.50
|
Installed overflow canister to firewall...
|
Details
|
|
|
07-15-2010
|
4.50
|
Installed R/L radiator shrouds with pop rivets...
|
Details
|
|
|
07-14-2010
|
2.00
|
Completed radiator flow shields...
|
Details
|
|
|
07-13-2010
|
1.50
|
Fabricated L radiator flow shroud, inner pieces...
|
Details
|
|
|
04-27-2010
|
4.00
|
Working off inspection improvements...
|
Details
|
|
|
04-17-2010
|
1.50
|
Adding more split loom ...
|
Details
|
|
|
04-14-2010
|
3.50
|
Setting fuel pressure auto-changeover...
|
Details
|
|
|
04-13-2010
|
2.50
|
Rewired auto-changeover wires on switch...
|
Details
|
|
|
04-12-2010
|
3.00
|
Routing/shortening & securing SDS wires ...
|
Details
|
|
|
04-07-2010
|
4.00
|
Connecting more SDS wires for operation...
|
Details
|
|
|
04-06-2010
|
2.50
|
Tested SDS CRT after hookup....
|
Details
|
|
|
04-01-2010
|
4.00
|
Routing SDS wires thru firewall...
|
Details
|
|
|
03-31-2010
|
3.50
|
Routing wires for SDS system...
|
Details
|
|
|
03-09-2010
|
1.50
|
Fabricating SS overlay for F/W...
|
Details
|
|
|
03-05-2010
|
1.50
|
SDS ECU wiring...
|
Details
|
|
|
03-04-2010
|
2.00
|
Installed nutplates for PLEX panel on subpanel...
|
Details
|
|
|
02-03-2010
|
1.00
|
Installed 5/16 lower GRD bolt...
|
Details
|
|
|
02-02-2010
|
2.00
|
Installed nylon insert for alt feed...
|
Details
|
|
|
11-10-2009
|
1.00
|
USMC 234th birthday..Bushing for trim wires..
|
Details
|
|
|
07-21-2009
|
1.50
|
Reworked fuel press. reg, #2 Bat Grd established..
|
Details
|
|
|
07-20-2009
|
1.50
|
Established another GRD Bus, radio tray improved..
|
Details
|
|
|
07-13-2009
|
3.50
|
Completed Main bus tray, throttle, vacuum secured.
|
Details
|
|
|
07-10-2009
|
3.50
|
Completed removeable throttle insert, wiring...
|
Details
|
|
|
07-06-2009
|
2.00
|
Drilled subpanel for tray, nutplates for GPS tray.
|
Details
|
|
|
06-27-2009
|
2.50
|
Ran #10 wire from Alt thru firewall...
|
Details
|
|
|
05-27-2009
|
2.50
|
Ran #10 wire from ALT thru firewall...
|
Details
|
|
|
05-20-2009
|
2.50
|
Routed EIS wires to temp/press. on engine...
|
Details
|
|
|
10-10-2008
|
2.00
|
Installed internal muffler...
|
Details
|
|
|
10-09-2008
|
1.50
|
Fitting internal muffler; trim ind. cut out...
|
Details
|
|
|
06-10-2008
|
3.00
|
Installed firewall labels & making batt. cable...
|
Details
|
|
|
06-05-2008
|
2.50
|
Installed Aux Batt Boost on firewall...
|
Details
|
|
|
06-04-2008
|
2.00
|
Drilled firewall for nutplate installation...
|
Details
|
|
|
03-11-2008
|
3.50
|
More placeing of cowl for fitting...
|
Details
|
|
|
01-09-2008
|
0.50
|
Assembling new throttle firewall hardware...
|
Details
|
|
|
11-14-2007
|
1.50
|
Making new firewall exit point ...
|
Details
|
|
|
10-17-2007
|
1.00
|
Drilling firewall for new throttle exit...
|
Details
|
|
|
04-25-2007
|
2.50
|
Completed batt. tie downs and fastened ECM ...
|
Details
|
|
|
04-16-2007
|
2.00
|
Installing nutplates for firewall bolts for batts.
|
Details
|
|
|
03-01-2007
|
2.50
|
Fabricating brake line...Batt hold downs...
|
Details
|
|
|
02-28-2007
|
2.50
|
Fabricated Batt to GRD terminals, Batt tray spacer
|
Details
|
|
|
02-20-2007
|
0.70
|
Drilled and placed ground bus on firewall...
|
Details
|
|
|
02-19-2007
|
0.50
|
Threaded ECM cable thru firewall...
|
Details
|
|
|
01-24-2007
|
1.20
|
Made new entry for ECM cable in firewall...
|
Details
|
|
|
01-23-2007
|
1.00
|
Trimmed res. bracket & reinstalled...
|
Details
|
|
|
01-20-2007
|
2.00
|
Installed Moresco radiators overflow tank...
|
Details
|
|
|
01-20-2007
|
1.50
|
Installed heater to firewall...
|
Details
|
|
|
01-10-2007
|
2.00
|
Installing Andair fuel filter in firewall...
|
Details
|
|
|
01-08-2007
|
1.00
|
Installed engine computer cable thru firewall...
|
Details
|
|
|
12-19-2006
|
2.00
|
Installed battery bracket, engine mount prep...
|
Details
|
|
|
10-23-2006
|
1.50
|
Prosealed and riveted firewall plate ...
|
Details
|
|
|
07-12-2006
|
3.00
|
Drilled and enlarged 2 firewall holes....
|
Details
|
|
|
07-10-2006
|
1.00
|
Removed brainbox from engine for placement...
|
Details
|
|
|
02-23-2006
|
1.00
|
Added 2 countersink screws to batt. box to center.
|
Details
|
|
|
02-21-2006
|
2.00
|
Drilled battery holder to firewall, clecoed on...
|
Details
|
|
|
02-17-2006
|
1.00
|
Cut 2 more lightening holes on battery bracket...
|
Details
|
|
|
02-16-2006
|
2.50
|
Cut holes thru stainless firewall for heater...
|
Details
|
|
|
02-21-2005
|
1.00
|
Marked firewall for battery placement...
|
Details
|
|
|
01-07-2005
|
1.50
|
Mounted brake res. on fwd. firewall...
|
Details
|
|
|
03-09-2004
|
3.00
|
Smoothed edge of top cowling inner attach piece...
|
Details
|
|
|
09-02-2000
|
1.00
|
Riveted oil cutout on firewall...
|
Details
|
|
|
08-29-2000
|
2.00
|
Drilled and dimpled firewall insert...
|
Details
|
|