KitLog pro

Powered By Kitlog Pro v2.0

RON'S WEB SITE
Work Logs Found: 78
Category Work Time: 166 Hours
 Date
Hours
Work Log Summary

Details

 08-13-2014
3.00
Access panel & MT prop removal
Details
       

 05-29-2012
1.00
Completed radiator prep for engine start...
Details
       

 04-24-2012
3.00
Positioning NACA intake;plenum intake...
Details
       

 03-24-2012
1.00
Completed L rad installation...
Details
       

 03-22-2012
3.00
Installing new rads...
Details
       

 03-21-2012
3.00
Mounting new radiators on engine plate...
Details
       

 03-19-2012
2.00
Installed rads with clamps for duct fitting...
Details
       

 03-10-2012
0.50
Radiators arrived...
Details
       

 02-03-2012
1.50
Batteries tested & cables made...
Details
     

 01-31-2012
1.50
Removed batteries from firewall...
Details
       

 11-02-2011
3.50
Tested aircraft and completed L airbox...
Details
       

 11-01-2011
3.00
Modifying L inlet for smoother airflow...
Details
       

 06-09-2011
2.00
Added additional cooling vent ...
Details
       

 06-08-2011
2.00
installed R cooling vent...
Details
       

 11-04-2010
2.50
Sealing firewall...
Details
       

 08-27-2010
3.00
Installed Protek Bus Manager, HS fairings...
Details
     

 07-27-2010
3.00
Installed last bulkhead fitting, grommets...
Details
       

 07-21-2010
3.50
Installed overflow canister to firewall...
Details
     

 07-15-2010
4.50
Installed R/L radiator shrouds with pop rivets...
Details
       

 07-14-2010
2.00
Completed radiator flow shields...
Details

 07-13-2010
1.50
Fabricated L radiator flow shroud, inner pieces...
Details

 04-27-2010
4.00
Working off inspection improvements...
Details
       

 04-17-2010
1.50
Adding more split loom ...
Details
       

 04-14-2010
3.50
Setting fuel pressure auto-changeover...
Details

 04-13-2010
2.50
Rewired auto-changeover wires on switch...
Details

 04-12-2010
3.00
Routing/shortening & securing SDS wires ...
Details
       

 04-07-2010
4.00
Connecting more SDS wires for operation...
Details
     

 04-06-2010
2.50
Tested SDS CRT after hookup....
Details
     

 04-01-2010
4.00
Routing SDS wires thru firewall...
Details

 03-31-2010
3.50
Routing wires for SDS system...
Details
       

 03-09-2010
1.50
Fabricating SS overlay for F/W...
Details

 03-05-2010
1.50
SDS ECU wiring...
Details

 03-04-2010
2.00
Installed nutplates for PLEX panel on subpanel...
Details
     

 02-03-2010
1.00
Installed 5/16 lower GRD bolt...
Details

 02-02-2010
2.00
Installed nylon insert for alt feed...
Details
       

 11-10-2009
1.00
USMC 234th birthday..Bushing for trim wires..
Details

 07-21-2009
1.50
Reworked fuel press. reg, #2 Bat Grd established..
Details

 07-20-2009
1.50
Established another GRD Bus, radio tray improved..
Details

 07-13-2009
3.50
Completed Main bus tray, throttle, vacuum secured.
Details
       

 07-10-2009
3.50
Completed removeable throttle insert, wiring...
Details

 07-06-2009
2.00
Drilled subpanel for tray, nutplates for GPS tray.
Details
       

 06-27-2009
2.50
Ran #10 wire from Alt thru firewall...
Details

 05-27-2009
2.50
Ran #10 wire from ALT thru firewall...
Details
       

 05-20-2009
2.50
Routed EIS wires to temp/press. on engine...
Details
       

 10-10-2008
2.00
Installed internal muffler...
Details
     

 10-09-2008
1.50
Fitting internal muffler; trim ind. cut out...
Details

 06-10-2008
3.00
Installed firewall labels & making batt. cable...
Details
       

 06-05-2008
2.50
Installed Aux Batt Boost on firewall...
Details
       

 06-04-2008
2.00
Drilled firewall for nutplate installation...
Details
       

 03-11-2008
3.50
More placeing of cowl for fitting...
Details
       

 01-09-2008
0.50
Assembling new throttle firewall hardware...
Details

 11-14-2007
1.50
Making new firewall exit point ...
Details

 10-17-2007
1.00
Drilling firewall for new throttle exit...
Details
       

 04-25-2007
2.50
Completed batt. tie downs and fastened ECM ...
Details
     

 04-16-2007
2.00
Installing nutplates for firewall bolts for batts.
Details

 03-01-2007
2.50
Fabricating brake line...Batt hold downs...
Details
     

 02-28-2007
2.50
Fabricated Batt to GRD terminals, Batt tray spacer
Details

 02-20-2007
0.70
Drilled and placed ground bus on firewall...
Details
     

 02-19-2007
0.50
Threaded ECM cable thru firewall...
Details
     

 01-24-2007
1.20
Made new entry for ECM cable in firewall...
Details
       

 01-23-2007
1.00
Trimmed res. bracket & reinstalled...
Details

 01-20-2007
2.00
Installed Moresco radiators overflow tank...
Details
       

 01-20-2007
1.50
Installed heater to firewall...
Details
     

 01-10-2007
2.00
Installing Andair fuel filter in firewall...
Details
       

 01-08-2007
1.00
Installed engine computer cable thru firewall...
Details
     

 12-19-2006
2.00
Installed battery bracket, engine mount prep...
Details

 10-23-2006
1.50
Prosealed and riveted firewall plate ...
Details
     

 07-12-2006
3.00
Drilled and enlarged 2 firewall holes....
Details
       

 07-10-2006
1.00
Removed brainbox from engine for placement...
Details

 02-23-2006
1.00
Added 2 countersink screws to batt. box to center.
Details

 02-21-2006
2.00
Drilled battery holder to firewall, clecoed on...
Details
     

 02-17-2006
1.00
Cut 2 more lightening holes on battery bracket...
Details
     

 02-16-2006
2.50
Cut holes thru stainless firewall for heater...
Details
       

 02-21-2005
1.00
Marked firewall for battery placement...
Details
     

 01-07-2005
1.50
Mounted brake res. on fwd. firewall...
Details
       

 03-09-2004
3.00
Smoothed edge of top cowling inner attach piece...
Details

 09-02-2000
1.00
Riveted oil cutout on firewall...
Details
       

 08-29-2000
2.00
Drilled and dimpled firewall insert...
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.