Powered By Kitlog Pro v2.0
RUSH MCKELVEY RV-8
RV-8
Engine
Work Logs Found:
35
Category Work Time:
136 Hours
Date
Hours
Work Log Summary
Details
02-24-2011
3.00
First Engine Start Brake and Taxi Test all Good
10-06-2010
4.00
REINSTALL MAINFOLD PRESSURE HOSE TO PLASMA II
10-05-2010
1.00
CHECK TDC TO HOOK UP ELECT LEADS
10-04-2010
3.00
INSTALL MAIN LEADS TO COILS DRILL BAFFLE
10-01-2010
3.00
WIRE UP PLASMA II
09-28-2010
2.00
INSTALL FUEL LINE THROUGH BAFFLE UPPER
09-25-2010
5.00
INSTALL FUEL FLOW SENSOR
09-18-2010
3.50
FAB AN INSTALL CRANK CASE BREATHER TUBE
09-14-2010
4.00
INSTALL OIL COOLER LINES PER PLANS
09-10-2010
3.00
OIL COOLER WORK
09-08-2010
4.00
OIL COOLER BAFFLE INSTALLED
09-05-2010
1.00
MAKE CHT AN EGTS STAND OFFS
09-04-2010
4.00
WIRING EGTS AN CHTS
09-01-2010
3.00
WIRING CHT AN EGTS
08-28-2010
4.00
SNORKEL CUT DECK COOLING RAMP FILTER
08-27-2010
6.00
SNORKEL WORK SAND PAINT BLACK INSTALL
08-21-2010
6.00
SNORKEL CUT AN GLASS
08-20-2010
2.00
SNORKEL CUT AN FIT
08-19-2010
4.00
SNORKEL FIT
Details
08-17-2010
3.00
INSTALL BAFFLES FLEX MATERIAL
08-16-2010
4.00
BAFFLE RIVIT DRILL
08-12-2010
4.00
Trim baffles
08-10-2010
6.00
Trim top baffling so cowl will fit
Details
08-05-2010
8.00
More baffling work
Details
08-01-2010
6.00
BAFFLING BUILDING
Details
02-17-2010
3.00
INSTALL RH MAG ON OFF SWITCH
Details
02-15-2010
3.00
INSTALL MAP SENSOR
02-14-2010
6.00
INSTALL CABLE CONTROLS MIX RPM THROT
02-12-2010
2.00
INSTALL FIRE SLEEVE AROUND PUSH PULL CABLES
02-10-2010
4.00
WIRE ENGINE AND RH ELEC MAG
02-08-2010
3.00
WIRE ENGINE AND LH IMPULSE COUPLER
01-20-2010
2.00
INSTALL THROTTLE CABLE BRACKET
Details
01-20-2010
10.00
INSTALL STARTER CABLE
12-25-2009
6.00
MOUNT AND INSTALLED NEW IO 375 AEROSPORT POWER ENG
12-12-2009
1.00
IO 375 AEROSPORT POWER ENGINE IS HERE
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
203
789
Avionics
9
43
Empennage
9
45
Engine
35
136
Fuselage
102
427
Miscellaneous
10
18
Wings
38
120
Copyright © 2001-2024 Matronics. All Rights Reserved.