Powered By Kitlog Pro v2.0
Gary's RV8 Construction Log
RV-8
Wings
Work Logs Found:
101
Category Work Time:
212 Hours
Date
Hours
Work Log Summary
Details
11-20-2011
3.00
L/E: Rivetted to main spar
Details
11-19-2011
2.00
F/Tanks: Prepped baffle for installation
Details
11-14-2011
3.00
T/S: Dimpled all top skins, Installed Aileron Bell
Details
11-12-2011
3.00
L/E: Rivetted leading edges
Details
11-09-2011
3.00
T/S: Deburred all top skins
Details
11-08-2011
1.00
T/S: Removing plastic in prep for debur
Details
11-07-2011
1.00
F/Tanks: Double check pro-seal
Details
11-06-2011
1.50
F/Tanks: Riveted leading edge support brackets
Details
11-03-2011
0.50
Continued dimpling rear spar
Details
11-01-2011
1.00
Dimpled Rear Spar
Details
10-31-2011
2.00
Coutersunk Main spar for wing skin rivets
Details
10-30-2011
2.00
Coutersunk Main spar for wing skin rivets
Details
10-27-2011
1.50
Dimpling main ribs
Details
10-26-2011
1.50
Started dimpling wing understructure
Details
10-24-2011
2.00
L T/S: Scarfing corners on Top Skins
Details
10-23-2011
2.00
L/E: Priming and rivetting platenuts to joint plat
Details
10-22-2011
1.50
L/E: Drilled platenuts on Joint Plates
Details
10-16-2011
0.50
L/E: Finished dimpling skins
Details
09-26-2011
1.50
L/E: Removed plastic and dimpled skin
Details
09-22-2011
1.50
R L/E: Deburr skin and dimple ribs and joint plate
Details
09-03-2011
1.50
L L/E: Deburr skin and dimple ribs and joint plate
Details
07-24-2011
2.00
R F/Tank: Installed Cap. Senders and outboard rib
Details
05-29-2011
1.00
R F/Tank: Rivetted inboard most rib
Details
05-22-2011
1.00
R F/Tank: Prosealed vent pipe in place
Details
05-14-2011
0.50
R F/Tank: Vent pipe bending (inboard)
Details
05-08-2011
0.50
R F/Tank: Fitted vent pipe
Details
05-01-2011
1.00
R F/Tank: Rivetted ribs and Filler Cap housing
Details
03-27-2011
1.00
R F/Tank: Fay sealed ribs in place
Details
02-13-2011
1.00
L F/Tank: Installed outboard rib and extra pro-sea
Details
02-03-2011
2.00
L F/Tank: Installed Cap. senders and inboard rib
Details
02-01-2011
0.50
L F/Tank: Vent pipe bending
Details
01-27-2011
1.00
L F/Tank: Fitted the vent pipe
Details
01-25-2011
2.00
L F/Tank: Rivetted ribs and Filler cap
Details
01-18-2011
1.50
L F/Tank: Rivetted Stiffeners and Drain Plug
Details
01-17-2011
1.00
R F/Tank: Rivetted stiffeners and drain plug
Details
01-15-2011
1.50
F/Tanks: Prep for proseal
Details
01-13-2011
2.00
R F/Tank: Dimpled skin and prep for pro-seal
Details
01-12-2011
1.00
R F/Tank: Dimpled ribs and stiffeners
Details
01-11-2011
1.00
L F/Tank: Dimple skin
Details
01-10-2011
2.00
L F/Tank: Disassemble and deburr
Details
11-08-2010
0.50
F/Tanks: Safety wired trap doors in place
Details
11-07-2010
1.50
L F/Tank: Flop Tube anti hang-up
Details
11-01-2010
1.00
R F/Tank: Manufactured vent pipe clamp
Details
10-30-2010
4.00
R F/Tank: Filler Camp, Drain Plug and Cap.plates
Details
10-27-2010
2.00
L F/Tanks: Vent Pipe Clamp and fit Capacitance pla
Details
10-25-2010
2.00
F/Tanks: Fitting Left Drain Plug and Filler Cap
Details
10-24-2010
2.50
F/Tanks: Capacitance Fuel Sender Installation
Details
10-23-2010
1.00
F/Tanks: Inboard Bay Trap Door (Left)
Details
10-22-2010
1.00
F/Tanks: Inboard Bay Trap Door (Right)
Details
10-21-2010
0.50
F/Tanks: Inboard Bay Trap Doors
Details
10-20-2010
2.00
F/Tanks: Inspection holes
Details
10-19-2010
1.00
F/Tanks: Inboard Ribs Inspection Hole Cut-Outs
Details
10-18-2010
2.00
F/Tanks: T405 Attachment Brackets
Details
10-11-2010
3.00
F/Tanks: T405 Attachment Brackets
Details
10-10-2010
4.00
F/Tanks: Debur skins/ribs, start on T405 brackets
Details
10-09-2010
1.00
F/Tanks: Countersinking Skins and drilling stiffen
Details
10-07-2010
1.00
R F/Tank: Countersink skins
Details
10-05-2010
1.00
Z Brackets: Drilling to right tank baffle
Details
10-04-2010
1.00
Z Brackets: Mount Right Fuel Tank
Details
10-03-2010
1.00
R F/Tank: Cleco together
Details
09-12-2010
0.50
F/Tanks: Prep stiffeners
Details
09-06-2010
1.00
L F/Tank: drilling and cut all stiffeners
Details
09-05-2010
1.50
L F/Tank: Drill W423 Joint Plate
Details
09-02-2010
0.00
Z Brackets-Fitting & drilling to Left Fuel Tank 4
Details
09-02-2010
0.00
Z Brackets-Fitting & drilling to Left Fuel Tank 3
Details
09-02-2010
0.00
Z Brackets-Fitting & drilling to Left Fuel Tank 2
Details
09-02-2010
2.00
Z Brackets-Fitting & drilling to Left Fuel Tank 1
Details
08-31-2010
3.00
Z Brackets - Priming and rivet nutplates
Details
08-30-2010
1.50
Z Bracket - countersinking and spar countersink
Details
08-28-2010
1.50
Z brackets - drilling nutplates
Details
08-26-2010
0.50
Z Brackets - drilling to right spar
Details
08-15-2010
0.50
Z Brackets - drilling to left spar
Details
08-14-2010
1.00
Z Brackets ... cleco fuel tank skin
Details
08-14-2010
1.50
Z Brackets
Details
05-01-2010
40.00
Wings stands, rigging, skins, drilling, leading ed
Details
04-18-2010
8.00
Rivet understructure together
Details
03-11-2010
1.00
Ribs: Priming
Details
03-10-2010
2.00
Disassemble understructure and debur
Details
03-08-2010
4.00
Clecoed understructure together
Details
02-25-2010
4.00
Ribs: Fluting
Details
02-24-2010
4.00
Ribs: Fluting...
Details
02-23-2010
1.00
Ribs: Fluting
Details
02-22-2010
4.00
Ribs: Bending Flanges to 90 Deg.
Details
02-21-2010
8.00
Ribs: Deburring...
Details
01-26-2010
1.50
Ribs: Deburring...
Details
01-25-2010
4.00
Ribs: Deburring
Details
01-24-2010
1.50
Rear Spars: Rivetting and starting on Ribs
Details
01-23-2010
1.00
Rear Spars: 2 - Prep and Priming
Details
01-23-2010
1.00
Rear Spars: 1 - Reinforcement fork and doublers
Details
01-22-2010
1.00
Rear Spars: Aileron push rod cut-outs
Details
01-21-2010
0.50
Rear Spars: Match drill reinforcement plates
Details
01-19-2010
3.00
Rear Spars: Edge Prepping
Details
01-18-2010
0.50
Tie Down Manufacture - 3
Details
01-17-2010
0.00
Tie Down Manufacture - 2 (cont)
Details
01-17-2010
3.00
Tie Down Manufacture - 2
Details
01-12-2010
1.00
Tie Down Manufacture - 1
Details
01-11-2010
2.00
Rivet Web Platenuts, start on Tie Down Spacers
Details
01-09-2010
1.00
Rivet Flange Platenuts to spar
Details
01-07-2010
4.00
Countersink & Prime spars, rivet platenuts
Details
01-05-2010
3.00
Countersink Main Spars
Details
12-23-2009
0.00
Wings Arrive
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
238
414
Empennage
95
134
Fiberglass: Emp
27
30
Other
4
Wings
101
212
Workshop
11
38
Copyright © 2001-2024 Matronics. All Rights Reserved.