KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
Work Logs Found: 5
Category Work Time: 13 Hours
 Date
Hours
Work Log Summary

Details

 03-05-2011
2.00
Van’s fuel valve indicator plate installed
Details
       

 03-14-2010
3.00
Section 37 FUEL SYSTEM page 37-4 Steps 5 to 7
Details
       

 02-27-2010
4.00
Section 37 FUEL SYSTEM page 37-4 Steps 1 to 4
Details
       

 01-03-2010
2.00
Section 37 FUEL SYSTEM page 37-3 Steps 1 to 9
Details
       

 01-02-2010
2.00
Section 37 FUEL SYSTEM page 37-2 Steps 1 to 5
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.