Powered By Kitlog Pro v2.0
RV-10 by Nick Nyenhuis jr.
RV-10
Shop/Tools
Work Logs Found:
21
Category Work Time:
39 Hours
Date
Hours
Work Log Summary
Details
01-08-2018
0.50
Drill press blower pedal controlled
03-30-2010
4.00
Made wing leading edge cradles
11-28-2009
3.50
Made wing cradles / work table.
Details
03-30-2009
3.50
Made shelves with Dad
01-19-2009
1.00
Modified DRDT-2 to have the handle rearward
01-19-2009
1.00
Modified DRDT-2 to have the handle rearward
01-08-2009
1.80
Shortening of non-adjustable set for air squeezer
01-08-2009
1.80
Shortening of non-adjustable set for air squeezer
08-16-2008
1.00
Organize and label parts drawers
07-02-2008
2.00
DRDT-2 Assembly
07-02-2008
2.00
DRDT-2 assemble
07-01-2008
1.00
Marty arrives (with tools)
Details
07-01-2008
1.00
Marty arrives (with tools)
Details
06-17-2008
1.00
Finishing off DRDT-2
06-17-2008
1.00
Finish welding DRDT-2
06-11-2008
0.10
Welding the DRDT-2 (2)
Details
06-10-2008
2.00
Building DRDT-2
Details
06-10-2008
2.00
Building DRDT-2
Details
03-24-2008
4.00
Paint Booth
Details
03-24-2008
4.00
Built paint booth
Details
02-29-2008
1.00
Work benches
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
535
1769
Administration
1
2
Ailerons
15
51
Brakes and Wheels
7
21
Control System
18
64
Electrical
22
69
Elevators
34
116
Empennage Misc
8
19
Flaps
21
84
Fuel System
9
23
Fuel Tanks
37
137
Fuselage
164
580
Horizontal Stab
28
73
Miscellaneous
9
28
Panel
2
6
Rudder
19
46
Shop/Tools
21
39
Tailcone
32
109
Vertical Stab
13
37
Wings
75
265
Copyright © 2001-2024 Matronics. All Rights Reserved.