KitLog pro

Powered By Kitlog Pro v2.0

HB-YAK GS-2 Sportsman 2+2 kit
Work Logs Found: 41
Category Work Time: 120 Hours
 Date
Hours
Work Log Summary

Details

 04-11-2024
4.00
Windshield installation
       

 03-28-2024
8.00
Turtle Deck ajustment
       

 03-20-2024
10.00
Turtle deck gap closed
       

 03-18-2024
4.00
Turtle deck adjustment
       

 11-20-2023
8.00
Installation of fin reinforcement
       

 08-22-2021
4.00
Finish Aft Searweb
Details
       

 07-30-2021
4.00
Cover for the Lower Aft Fuselage Inspection Hole
Details
       

 07-10-2021
2.00
Laminating aft sher web
     

 07-06-2021
2.00
Laminate the Side Attach Flanges for the Forward S
Details
       

 07-03-2021
2.00
Laminate Attach Flanges for the Aft Inter-Bulkhead
Details
       

 06-26-2021
2.00
preparing the two layers of DBM cloth
Details
       

 06-26-2021
4.00
Added two layers of DBM cloth on all wrongly lamin
Details
       

 06-09-2021
2.00
Rivet the Rudder Stop to the Rudder Yoke
Details
       

 06-07-2021
4.00
Laminate the Side Attach Flanges for the Forward S
Details
       

 06-07-2021
4.00
Divers details
       

 05-22-2021
1.00
InstalltheVerticalFinRib
Details
     

 05-22-2021
2.00
AdjusttheRudderTravel
Details
       

 05-22-2021
2.00
:Cut Out the Forward Shearweb
Details
     

 05-08-2021
3.00
Rivet the Vertical Fin Spar to the Fin Shells
Details
       

 05-08-2021
2.00
Install the Vertical Fin Rib, Secure the rib with
Details
       

 05-08-2021
2.00
Fabricate the Rudder Stop Plate
Details
       

 05-08-2021
2.00
Cut an Inspection Hole in the Lower Aft Fuselage
Details
       

 05-08-2021
1.00
Bolt the Upper Rudder Hinge to the Vertical Fin
Details
       

 05-01-2021
2.00
Trim, Position and Drill the Elevator Bellcrank Br
       

 05-01-2021
2.00
Laminate the Aft Attach Flange for the Forward Int
Details
       

 05-01-2021
2.00
Install the Stabilizer Mounting Nutplates
Details
       

 04-23-2021
2.00
Position and Drill the H Stabilizer Attach Bracke
Details
     

 04-23-2021
1.00
Nutplates vertical fin spar
Details
     

 04-23-2021
1.00
Finish the Trailing Edges of the Fin
Details
     

 04-23-2021
2.00
Drill the Horizontal Stabilizer Aft Attach Bracket
Details
       

 04-17-2021
0.50
Riveting the Elevator Bellcrank Assembly
Details
       

 04-17-2021
2.00
Finish the Trailing Edges of the Fin
Details
       

 04-17-2021
4.00
Drilling the Vertical Spar holes
Details
       

 04-14-2021
2.00
Temporalily mount the upper hinge on the fin spar
       

 04-14-2021
2.00
Sand the tops of the vertical Fin
Details
       

 04-14-2021
1.00
Mount the hinges on the rudder
Details
       

 04-14-2021
3.00
Hang the Rudder assembly from the fin
       

 04-14-2021
3.00
Drill the index holes Vertical fin spar
Details
       

 04-14-2021
2.00
Drill and corrosion proof the Elavator Bellcarnk A
       

 03-20-2021
6.00
Camera window finishing
Details
       

 03-20-2021
4.00
Camera window cut out
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.