Powered By Kitlog Pro v2.0
Louis Rans S7-S Courier
S-7S Courier
Electrical
Work Logs Found:
15
Category Work Time:
62 Hours
Date
Hours
Work Log Summary
Details
06-09-2010
1.00
Adding ground wire to VDO engine gauges
05-02-2010
3.00
Finshed a few loose ends.
02-13-2010
4.00
Wiring panel
02-08-2010
4.00
Wiring panel
02-07-2010
6.00
Wiring panel
Details
02-05-2010
4.00
Making copper buss bars
Details
02-05-2010
3.00
Copper buss bars
02-04-2010
4.00
Wiring trim
02-03-2010
3.00
Wiring survo stick harness
02-02-2010
4.00
Wiring trim survo
Details
02-01-2010
6.00
Wiring the Ray Allen switch on front stick
Details
01-29-2010
4.00
Battery cable conduit
Details
01-25-2010
8.00
Panel wiring
Details
01-24-2010
4.00
Studying the job ahead of wiring this bird
Details
05-02-2009
4.00
Installing master relay
Details
SITE NAVIGATION
Contact Builder
S-7S Courier Home
Category
# Logs
# Hours
All
92
381
Brakes
3
14
Control Linkage
9
27
Doors
2
4
Electrical
15
62
Elevator
5
30
Engine
12
44
Exhast System
4
10
Firewall
2
8
Fuselage
4
16
Horizontal Stabilize
1
12
Inventory
1
18
Main Gear Legs
4
13
Miscellaneous
2
8
Motor Mounts
3
10
Panel
12
67
Powder-coat / Paint
2
2
Rudder
1
2
Seats
2
11
Tail Wheel
2
7
Throttle Controls
3
10
Tools
3
6
Copyright © 2001-2024 Matronics. All Rights Reserved.