Powered By Kitlog Pro v2.0
Jacks Web Site
RV-7A
Firewall forward
Work Logs Found:
103
Category Work Time:
332 Hours
Date
Hours
Work Log Summary
Details
07-08-2012
3.00
Finished rear cowl attachment
Details
07-08-2012
4.00
Finished oil fillter door
Details
07-04-2012
3.00
Fitted oil filler door to the upper cowl
Details
07-04-2012
1.00
Fabricated latch open limiters
Details
06-11-2012
4.00
Fixed clearance between spinner and cowl
Details
04-01-2012
4.00
Lay up cowl supports
Details
04-01-2012
5.00
Covers laid up
Details
03-31-2012
4.00
Preparing pin cover molds
Details
03-31-2012
4.00
Cut holes for hinge pin cover.
Details
02-11-2012
2.00
Reattached Cowl to Finish Horizontal Seam
Details
10-30-2011
3.00
Finished cable firewall feedthroughs
Details
02-27-2011
2.00
Secured fuel line
Details
02-27-2011
6.00
Fabricated firewall penetrations
Details
11-14-2010
7.00
Installed Parking Brake
Details
06-26-2010
4.00
Routed ignition leads
Details
06-26-2010
1.00
Planning fuel flow sensor installation
Details
06-26-2010
3.00
Built desecant holders for exhaust systems
Details
06-07-2010
3.00
Sniffle valve install
Details
06-06-2010
4.00
Reattached prop. Spinner cutout layup
Details
06-05-2010
2.00
Final assembly of skybolt assembly
Details
05-31-2010
3.00
Finished lower baffle attachment
05-31-2010
6.00
Final assembly for baffles
Details
05-30-2010
9.00
Finsh paint baffle parts
Details
05-29-2010
9.00
Primed baffle parts
Details
05-29-2010
4.00
Prepared parts for priming
Details
05-28-2010
4.00
Made plug hole covers
Details
05-27-2010
3.00
Fabricated fin extensions for cylinder cooling
Details
05-23-2010
1.00
Removed baffles for painting
Details
05-22-2010
6.00
Finished lower ignition system installation
Details
05-21-2010
2.00
Sanded snorkel and fitted flanges
Details
05-18-2010
1.00
Final layup on snorkel
Details
05-16-2010
4.00
Installed alternator cooling hose
Details
05-15-2010
5.00
Installed cabin heat hoses
Details
05-14-2010
1.00
Ignition coil fitting
Details
05-09-2010
7.00
Mounted 2nd set of ignition coils
Details
05-09-2010
2.00
Fuel injection system hookup
Details
05-08-2010
1.00
Drilled holes for ignition wires
Details
05-02-2010
8.00
Installed 1st set of ignition coils
Details
05-01-2010
2.00
Finish baffle cleanup
Details
05-01-2010
2.00
Added oil cooler shutter
04-25-2010
3.00
Final fitting of snorkel flange
Details
04-25-2010
7.00
Adjusted the height of the baffles
Details
04-23-2010
2.00
Cutting snorkel flange
Details
04-18-2010
6.00
Fitted oil filter to baffles
Details
04-03-2010
3.00
Fitted upper cowl
Details
04-02-2010
2.00
Garmin equipment arrived
Details
03-06-2010
2.00
Snorkel sanded
Details
03-06-2010
2.00
Snorkel fitting
Details
03-05-2010
2.00
Snorkel second layup.
Details
02-28-2010
2.00
Preparing snorkel transition form and first layup
Details
02-28-2010
3.00
Making transition form
Details
02-28-2010
2.00
Further measurements for snorkel fit
Details
02-28-2010
2.00
First cut not good
Details
02-27-2010
2.00
Worked on left inlet baffles
Details
02-27-2010
4.00
Preparing for snorkel attachment
Details
02-27-2010
3.00
First cut to shrink snorkel
Details
02-27-2010
2.00
Baffle mounting brackets
Details
02-14-2010
3.00
Inlet snorkel attachment
Details
02-13-2010
5.00
Engine baffle kit
Details
02-13-2010
2.00
Attached inlet fairings
Details
02-07-2010
4.00
Miscellaneous work
Details
02-06-2010
4.00
Rivetting and gluing the top hinges
Details
02-06-2010
2.00
Prepared top cowl for Sky Bolts
Details
02-06-2010
3.00
Prepared flanges for Sky Bolts
Details
02-01-2010
2.00
Upper horizontal cowl hinge views
Details
02-01-2010
4.00
Spacing the cowl halves
Details
02-01-2010
2.00
Drilled holes for hinge pins
Details
01-31-2010
4.00
Lower hnge attachment
Details
01-31-2010
3.00
Horizontal cowl hinge after drilling
Details
01-31-2010
4.00
Clamping horizontal hinges to cowl
Details
01-31-2010
3.00
Attaching rear edge hinges to cowl
Details
01-30-2010
7.00
Adjusting lower cowl fit
Details
01-25-2010
2.00
Trimming the top edges
Details
01-25-2010
2.00
Drilling side hinges for the cowl
Details
01-24-2010
3.00
Shimming the sides of the cowl
Details
01-24-2010
3.00
Setting the side cowl hinge pins
Details
01-24-2010
3.00
Installing bottom cowl hinges
Details
01-23-2010
3.00
Drilling holes for Sky Bolts
Details
01-23-2010
4.00
Cutting back edge of bottom cowl
Details
01-18-2010
3.00
Finishing top cowl flanges
Details
01-18-2010
6.00
Cutting top cowl to length
Details
01-17-2010
6.00
Start Sky Bolt installation
Details
01-02-2010
5.00
Adjusting cowl fit
Details
01-01-2010
4.00
Initial cowl fitting
Details
12-20-2009
3.00
Spinner fillin plates added
Details
12-20-2009
1.00
Lower canopy fitted
Details
12-19-2009
4.00
Spinner attached
Details
12-19-2009
4.00
Propeller mounted to the engine
Details
12-16-2009
1.00
Propeller arrives
Details
11-03-2009
0.50
Fitted top cowl
Details
11-03-2009
1.50
Fitted cabin heat muff to exhaust
Details
11-03-2009
1.00
Attached tail pipe support
Details
11-02-2009
3.00
Attached exhaust system
Details
11-01-2009
2.00
Ran fuel line to injector intake
Details
11-01-2009
0.50
Mounted throttle cable
Details
11-01-2009
0.50
Mounted oil pressure transducer hose
Details
11-01-2009
2.00
Mounted fuel pump overflow line
Details
11-01-2009
1.00
Mounted alternator
Details
11-01-2009
1.00
Added firewall to pump fuel line
Details
10-31-2009
3.00
Mounted firewall components and engine mount
Details
10-31-2009
3.00
Mounted engine
Details
10-31-2009
0.50
Engine on fuselage
Details
10-24-2009
5.00
Mounted prop governor to engine
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
728
2689
Canopy
26
127
Electrical
97
436
Empennage
30
110
Firewall forward
103
332
Fuselage
161
696
Gear fairings
5
17
Instrument Panel
78
419
Shop Setup
15
Wings
213
552
Copyright © 2001-2024 Matronics. All Rights Reserved.