Powered By Kitlog Pro v2.0
Michaels Web Site
Sonex Standard Gear
Empennage
Work Logs Found:
100
Category Work Time:
179 Hours
Date
Hours
Work Log Summary
Details
01-07-2012
4.25
Tail fairings complete
Details
01-02-2012
0.25
Tail fillets
Details
12-29-2011
2.00
Rudder hinge, stops & fillets
Details
12-29-2011
0.00
Misc shots of project to date
Details
12-28-2011
2.00
Secure vertical stab bolts
Details
12-27-2011
0.00
Vertical stabilizer tail post
Details
12-27-2011
3.50
Bolting down vertical tail
Details
12-26-2011
1.25
Vertical stabilizer attachment
Details
12-26-2011
1.75
Secure horizontal stab
Details
12-23-2011
1.75
Fit horizontal stabilizer
Details
12-21-2011
0.50
Deburring tail holes
Details
12-19-2011
2.25
Horizontal Tail Attach
Details
12-18-2011
0.00
Horizontal Tail Attach
Details
06-12-2011
2.50
RIGHT horiz tail tip installation
Details
06-11-2011
4.50
Horiz tail tip installation
Details
06-11-2011
0.00
Horiz tail tip installation
Details
06-09-2011
1.00
LEFT horiz tail tip installation
Details
06-08-2011
1.25
LEFT horiz tail tip installation
Details
06-07-2011
1.00
Horiz tail tips
Details
03-12-2011
1.50
Vertical tail tip
Details
03-09-2011
0.75
Vertical tail tip
Details
03-08-2011
1.50
Vertical tail tip
Details
03-08-2011
0.00
Vertical tail tip
Details
03-08-2011
0.00
Vertical tail tip
Details
03-07-2011
2.50
Vertical tail tip
Details
03-07-2011
0.00
Vertical tail tip
Details
03-06-2011
1.00
Tail tip ponderings
Details
01-11-2011
3.25
FINISHED THE RUDDER!
Details
01-10-2011
2.50
Rudder hing layout and drilling
Details
01-08-2011
2.50
Drilled rudder for all ribs
Details
01-07-2011
1.25
Holes in rudder skin for ribs
Details
01-05-2011
1.00
Cut outs in rudder
Details
01-04-2011
2.00
Bent rudder skin
Details
12-02-2010
0.50
T13 Rudder skin
Details
09-18-2010
0.50
Trim tab; Finished T02
Details
09-16-2010
0.00
FINISHED the elevators!
Details
09-16-2010
1.25
FINISHED the elevators!
Details
09-15-2010
3.00
Deburr & rivet elevator skins
Details
09-14-2010
1.50
Updrilling & deburring elevators
Details
09-13-2010
2.75
Elevator hinges & updrilling
Details
09-12-2010
1.75
Elevator hinges
Details
09-11-2010
1.50
Finished elevator horn
Details
09-11-2010
1.50
Attached elevator horn assembly
Details
09-10-2010
2.75
Elevators + Elevator Horn
Details
09-09-2010
2.50
Right, then back to left, elevator
Details
09-08-2010
2.25
Right elevator
Details
09-07-2010
2.00
Left elevator
Details
09-06-2010
2.00
Trim tab & elevator hinges
Details
09-06-2010
2.50
Elevators
Details
09-01-2010
1.50
Elevator skins & trim tab
Details
08-31-2010
0.75
Finished 1st elevator skin; started next
Details
08-30-2010
1.75
Bent then cut 2nd elevator skin
Details
08-29-2010
1.75
Bent the first elevator skin
Details
08-26-2010
1.75
Elevator skins
Details
04-06-2010
2.75
Horiz and vert stabs
Details
04-05-2010
4.00
Continued skinning horiz stab
Details
04-04-2010
1.50
Continued 2nd skin of horiz stab
Details
04-03-2010
2.00
Started on 2nd skin of horiz stab
Details
04-02-2010
1.00
Finished riveting 1st skin of horiz stab
Details
04-01-2010
3.00
Updrilled holes in 1st horiz stab skin
Details
03-31-2010
2.50
Started skinning the horizontal stabilizer
Details
03-29-2010
1.50
Rivets on 2nd side of vert stab
Details
03-28-2010
4.75
Started skinning the vert stab
Details
03-28-2010
0.00
Photos of vert tail skinning
Details
03-28-2010
0.00
Photos of vert tail skinning
Details
03-28-2010
0.00
Photos of vert tail skinning
Details
03-27-2010
3.00
Finished framing of horiz stab
Details
03-26-2010
3.50
Finished vert stab framing (mostly)
Details
03-24-2010
1.25
Started drilling vert stab
Details
03-23-2010
3.00
Layout of vert stab
Details
03-21-2010
1.25
T13-02 Rudder drive horn assembly
Details
03-21-2010
1.00
Finished T09-01 vert stab main spar
Details
03-20-2010
3.00
Continued main spar of vert stab
Details
03-20-2010
2.50
Continued main spar ass'y of the vertical stab
Details
03-19-2010
2.75
Forward spar of vert stab
Details
03-10-2010
1.50
Deburred & riveted Horiz Stab ribs
Details
03-09-2010
3.00
Continued with Horiz Stab
Details
03-08-2010
2.50
Horiz stab ribs
Details
03-07-2010
2.50
Finished main spar assembly of horiz stab
Details
03-06-2010
3.00
Horiz stab, front spar ass'y
Details
03-06-2010
2.50
Forward and Main Horiz Stab Assemblies
Details
03-05-2010
3.25
Started BUILDING horiz stabilizer
Details
03-02-2010
0.75
2 channels for tail
Details
03-01-2010
1.00
Bending tail channels
Details
02-28-2010
2.25
Bending channels for the tail
Details
02-01-2010
2.75
Channels for tail & fuselage + wing nose rib
Details
01-31-2010
2.00
Lay out channels for horiz stab
Details
01-23-2010
3.00
Tail and Fuselage Channels
Details
01-22-2010
0.00
#3 Final photos of channel bending process
01-22-2010
0.00
#2 More photos of channel bending process
01-22-2010
1.75
#1 Creating channels
Details
01-05-2010
1.50
Wing & Tail Parts
Details
01-04-2010
0.75
T05-01 L
Details
01-02-2010
4.00
Finished 2 empanage skins
Details
01-01-2010
4.75
Empenage skins
Details
12-29-2009
0.50
Prepped for empenage skins
Details
12-28-2009
0.50
Fluted tail ribs
Details
12-18-2009
3.00
Empenage Ribs
Details
12-11-2009
2.00
Bent tail ribs
Details
12-08-2009
0.50
Deburring .025 parts
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Sonex Standard Gear Home
Category
# Logs
# Hours
All
1608
2445
Aluminum Materials
45
98
Angle Parts
63
126
Avionics
96
132
Bending Brake
10
15
Canopy
61
91
Controls
55
85
Cowl
84
99
Empennage
100
179
Engine
224
233
Finish-Polish
66
85
FLIGHT!
18
Fuel System
36
43
Fuselage
208
382
Hardware
3
4
Landing Gear
74
95
Learning Point
2
1
Miscellaneous
84
111
None
7
Prop
6
7
Smoke System
7
6
Tools
5
9
Upholstery
7
6
Wings
347
638
Copyright © 2001-2024 Matronics. All Rights Reserved.