KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
Work Logs Found: 134
Category Work Time: 0 Hours
 Date
Hours
Work Log Summary

Details

 01-20-2015
0.00
The Canopy Big Cut 2.
Details
       

 01-19-2015
0.00
The Canopy Big Cut 1.
Details
       

 01-18-2015
0.00
Forward canopy trimming 5.
Details
       

 01-17-2015
0.00
Forward canopy trimming 4.
Details
       

 01-16-2015
0.00
Forward canopy trimming 3.
Details
       

 01-15-2015
0.00
Forward canopy trimming 2.
Details
       

 01-14-2015
0.00
Forward canopy trimming 1
Details
       

 01-12-2015
0.00
Second trim canopy sides
Details
       

 01-11-2015
0.00
First trim for/aft canopy
Details
       

 01-10-2015
0.00
The canopy
Details
       

 01-09-2015
0.00
Canopy Frame Debur/Counter Sink 5
Details
       

 01-08-2015
0.00
Canopy Frame Debur/Counter Sink 4
Details
       

 01-07-2015
0.00
Canopy Frame Debur/Counter Sink 3
Details
       

 01-06-2015
0.00
Canopy Frame Debur/Counter Sink 2
Details
       

 01-05-2015
0.00
Canopy Frame Debur/Counter Sink 1
Details
       

 01-04-2015
0.00
Drill Canopy Frame Forward Skin Wings
Details
       

 01-03-2015
0.00
Canopy Frame Wedge
Details
       

 01-02-2015
0.00
Canopy Frame Anti Movement Bolt
Details
       

 08-13-2013
0.00
Canopy Reinf. Drill F-7128C's to Canopy Frame.
Details
       

 08-12-2013
0.00
Canopy Reinf. Complete Fabrication of F-7128C's
Details
       

 08-11-2013
0.00
Canopy Reinf. Fabricate F-7128C Clasp's
Details
       

 08-10-2013
0.00
Canopy Reinf. Fabricate F-7128C Clasp's
Details
     

 08-09-2013
0.00
Canopy Reinf. More drilling and fitting.
Details
       

 08-08-2013
0.00
Canopy Reinf. Trial fit and drill forward edge.
Details
       

 08-07-2013
0.00
Canopy Reinf. Bend straight flanges.
Details
       

 08-06-2013
0.00
Canopy Reinf. Circular Reinforcement Flanges.
Details
       

 08-05-2013
0.00
Canopy Reinf. Fabricate Stiffening Flange Tool.
Details
       

 08-04-2013
0.00
Canopy Reinf. Canopy Reinforcement Kit.
Details
     

 08-03-2013
0.00
Riveting for/aft canopy decks.
Details
       

 08-02-2013
0.00
Riveting the F-705's.
Details
       

 08-01-2013
0.00
Adjust notch of F-705's for pop rivets.
Details
       

 05-28-2013
0.00
Drill Forward Ball Stud Mounts to Fuselage.
Details
       

 05-27-2013
0.00
Make Plate Nut Plate, mount Aft Ball Stud Mounts
Details
       

 05-26-2013
0.00
Drill Aft Ball Stud Mounts To F-721 Canopy Deck.
Details
       

 05-25-2013
0.00
Fabricate Forward Lift Strut, Ball Stud Mounts. 2.
Details
       

 05-24-2013
0.00
Fabricate Forward Lift Strut, Ball Stud Mounts. 1.
Details
       

 05-23-2013
0.00
Finish Fabrication of Aft Ball Stud Mounts.
Details
       

 05-22-2013
0.00
Fabricate Aft Lift Stru,t Ball Stud Mount.
Details
       

 05-21-2013
0.00
Adjust curve of Wd-725 Canopy Side Frame.
Details
       

 05-20-2013
0.00
Rivet C-613 Splice plate to Wd-725 side frame.
Details
       

 05-19-2013
0.00
Drill C-613 Side Splice Plates to Wd-725's.
Details
       

 05-18-2013
0.00
Dtrill Wd-725 Aft Canopy Frame Side Angles.
Details
       

 05-17-2013
0.00
Sand Aft Wd-725Canopy Side Frame Angle Flat.
Details
       

 05-16-2013
0.00
Drill C-704 SPlice Plate to Aft Frame Channel.
Details
       

 05-15-2013
0.00
Make the C-704 Aft Canopy Frame Splice Plate.
Details
       

 05-14-2013
0.00
Shape Canopy Frame F-631A Channels.
Details
       

 05-13-2013
0.00
Adjust Fuselage Seal Flange to Canopy Frame.
Details
     

 05-12-2013
0.00
Enlarging the Canopy Frame Goose Neck to 3/8"
Details
     

 05-11-2013
0.00
Finish drilling 1/4" holes through Goose Neck.
Details
       

 05-10-2013
0.00
Initial drilling of the Canopy Frame Goose Neck.
Details
       

 05-09-2013
0.00
Work Bench gets cluttered fast.
Details
     

 05-08-2013
0.00
Drilling Canopy Frame Forward Arms
Details
       

 05-07-2013
0.00
Drilling C-614 Split to Canopy Frame
Details
       

 05-06-2013
0.00
Initial fit of C-614 Canopy Splice Plate.
Details
       

 05-05-2013
0.00
Make C-614 Canopy Splice Plate.
Details
       

 05-04-2013
0.00
Trim C-619 Canopy Hinge Block Spacers.
Details
     

 05-03-2013
0.00
Result Wd-716 aft edge flange adjustment.
Details
       

 05-02-2013
0.00
Remove material from Wd-716 aft edge flange.
Details
       

 05-01-2013
0.00
Trial fit of forward Canopy Frame
Details
       

 03-18-2013
0.00
Canopy Frame. Prep Canopy Frame Top Skin. 2
Details
       

 03-17-2013
0.00
Canopy Frame. Prep Canopy Frame. 1
Details
       

 03-10-2013
0.00
Install Steps. Prep and prime Steps. 10
Details
       

 03-09-2013
0.00
Install Steps. Drill Step Anchor Block. 9
Details
       

 03-08-2013
0.00
Install Steps. Step Plate rivet hole locations. 8
Details
       

 03-07-2013
0.00
Install Steps. Drill remaining column of rivets. 7
Details
       

 03-06-2013
0.00
Install Steps. Drill Step Plate to Fuselage. 6
Details
       

 03-05-2013
0.00
Install Steps. Shape plate and cut off corner. 5
Details
       

 03-04-2013
0.00
Install Steps. Mark and drill Step Plate Holes. 4
Details
       

 03-03-2013
0.00
Install Steps. Mark and drill Step Plate Holes. 3
Details
       

 03-02-2013
0.00
Install Steps. Adjust tube length. 2
Details
       

 03-01-2013
0.00
Install Steps. Adjust tube length. 1
Details
       

 02-19-2013
0.00
Bolt and tourqe the Seat Belt Anchors.
Details
       

 02-18-2013
0.00
Rivet Top Rear Skin with Stephanie.
Details
       

 02-17-2013
0.00
Rivet Rudder Pedal Center Support to Firewall.
Details
       

 02-16-2013
0.00
Rivet the cool air vent bracket.
Details
     

 02-15-2013
0.00
Canopy latch Mechanism. Final Assembly . 4
Details
       

 02-14-2013
0.00
Canopy latch Mechanism. Prep Latch Angles. 3
Details
       

 02-13-2013
0.00
Canopy latch Mechanism. Tap Push Rod. 2
Details
     

 02-12-2013
0.00
Canopy latch Mechanism. Drill C-611 Blocks. 1
Details
       

 02-11-2013
0.00
Canopy Latch Handle, Rivet Latch Angles. 8
Details
       

 02-10-2013
0.00
Canopy Latch Handle, Install spring and wire. 7
Details
       

 02-09-2013
0.00
Canopy Latch Handle, Drill angles throgh skin. 6
Details
       

 02-08-2013
0.00
Canopy Latch Handle, File handle slots in skin. 5
Details
     

 02-07-2013
0.00
Canopy Latch Handle, File handle slots in skin. 4
Details
       

 02-06-2013
0.00
Canopy Latch Handle, Drill skin using angles, 3
Details
       

 02-05-2013
0.00
Canopy Latch Handle, Mark Hole Locations. 2
Details
       

 02-04-2013
0.00
Canopy Latch Handle, Prepare Handle, 1
Details
       

 12-09-2012
0.00
Canopy Release Handle mounted vertically.
Details
     

 12-08-2012
0.00
Sub-Panel Complete and Installed in Fuselage.
Details
       

 12-07-2012
0.00
Sub-Panel Revited.
Details
     

 12-06-2012
0.00
Rivet Sub-Panel
Details
       

 12-05-2012
0.00
Rivet Hat Channel/Seal Supports to Sub Panel.
Details
       

 12-04-2012
0.00
Alternative Canopy Release Handle Position.
Details
       

 12-03-2012
0.00
F-643-1 Channel Interference Modification. 2
Details
     

 12-02-2012
0.00
F-643-1 Channel Interference Modification. 1
Details
       

 12-01-2012
0.00
More F-679 Hat Channel Interference.
Details
       

 11-30-2012
0.00
Drilling Canopy Release Shaft and Arm Together.
Details
       

 11-29-2012
0.00
1/2" Hole instrument Panel for jettison Handle.
Details
       

 11-28-2012
0.00
F-643-1 Channel Interference Modification.
Details
     

 11-27-2012
0.00
Bearing Block and Hat Channel Modification.
Details
       

 11-26-2012
0.00
Hinge Pin Interference bottoming out on Short Rib.
Details
       

 11-25-2012
0.00
Dill holes in end of Canopy Release Links.
Details
       

 11-24-2012
0.00
Canopy Release Bearing Block, Fabrication, 2
Details
       

 11-23-2012
0.00
Canopy Release Bearing Block, Fabrication, 1
Details
       

 11-22-2012
0.00
Cut Slots in Canopy Release Steel Links.
Details
       

 11-21-2012
0.00
Remove Threads and Shape Canopy Hinge Pins.
Details
       

 11-20-2012
0.00
Decrease Diameter of WD-619 Release Shaft.
Details
       

 11-19-2012
0.00
Conopy Hinge, Fit Hinge Blocks
Details
       

 11-18-2012
0.00
Canopy Hinge, Fit Hinge Blocks.
Details
       

 11-17-2012
0.00
Canopy Hinge, Drill Hinge Blocks.
Details
       

 11-16-2012
0.00
Canopy Latch, Fabricate C-619 Spacers.
Details
       

 12-13-2009
0.00
Attach rotisserie frame to engine stand.
Details
       

 12-12-2009
0.00
Build rotisserie engine stand attach brace.
Details
       

 12-11-2009
0.00
Build rotisserie firewall frame.
Details
     

 12-04-2009
0.00
Drill engine mount to firewall using bushings.
Details
       

 12-03-2009
0.00
Top engine mount hole to firewall alignment.
Details
       

 12-03-2009
0.00
Bottom engine mount hole to firewall alignment.
Details
       

 12-02-2009
0.00
Clamp engine mount to saw horses for drilling.
Details
       

 11-30-2009
0.00
7 Wing bolts, Cherry max rivets, stack of boxes.
Details
       

 11-30-2009
0.00
6 Just more parts orgainzed in bug boxes.
Details
       

 11-30-2009
0.00
5 Special washers, screws, cotter pins, platenuts.
Details
       

 11-30-2009
0.00
4 Nuts, bolts and washer bug boxes
Details
       

 11-30-2009
0.00
3 Bug boxes filled with parts.
Details
       

 11-30-2009
0.00
2 Another package to break apart.
Details
       

 11-30-2009
0.00
1 Smaller package break down.
Details
       

 11-29-2009
0.00
8 store away the canopy and engine cowl.
Details
     

 11-29-2009
0.00
7 Cleveland wheels and brakes.
Details
       

 11-29-2009
0.00
6 Unwrap packages.
Details
       

 11-29-2009
0.00
5 Small package with engine mount under canopy.
Details
       

 11-29-2009
0.00
4 Remove small packages and cowl.
Details
       

 11-29-2009
0.00
3 Remove small wrapped items.
Details
       

 11-29-2009
0.00
2 Closer look inside finish kit box.
Details
       

 11-29-2009
0.00
1 Pop the top.
Details
       

 11-28-2009
0.00
.....PICKED UP FINISH KIT......
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.