KitLog pro

Powered By Kitlog Pro v2.0

Louis Rans S7-S Courier
Work Logs Found: 12
Category Work Time: 44 Hours
 Date
Hours
Work Log Summary

Details

 02-15-2010
1.50
Choke pull cable housing in panel
Details

 01-31-2010
3.00
Installing Soft Start on the Rotax engine
       

 01-26-2010
3.00
90* quick oil drain
       

 01-23-2010
3.00
Finsh installing Rotax oil pressure hose
Details
       

 01-19-2010
2.00
Oetiker stepless ear hose clamps
Details
       

 01-18-2010
8.00
Installing fuel and oil hoses
Details
       

 01-17-2010
4.00
Installing radator
     

 12-29-2009
5.00
Installed oil cooler
       

 12-28-2009
3.00
Installed choke cables
Details
       

 12-26-2009
4.00
Relocate water pump's lower-left coolant tube
Details
       

 12-13-2009
4.00
Bending the forward engine mount to fit engine
Details
       

 10-29-2009
4.00
Unpacking Rotax
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.