Matt's Hangar
A-23 PROMETHEUS
Vertical Stabilizer
Work Logs Found:
22
Category Work Time:
50 Hours
Date
Hours
Work Log Summary
Details
08-17-2017
3.50
Rudder Hinges
Details
04-07-2017
1.50
Another cleanup and rudder spring install
Details
04-06-2017
2.00
Finished closing out RH winglet
Details
04-02-2017
1.50
Cleanup RH winglet/rudder
Details
03-30-2017
3.00
Glassed winglet and rudder
Details
03-28-2017
2.00
Starting on the rudders
Details
03-26-2017
2.00
Close out RH winglet
Details
03-25-2017
3.00
Outside skinning RH winglet
Details
03-24-2017
3.50
Prep and skinning RH winglet
Details
03-23-2017
1.50
Starting the RH winglet
Details
03-21-2017
1.00
Closing out
Details
03-20-2017
1.50
Cleaned up LH winglet
Details
03-19-2017
3.00
Skinning winglet (LH)
Details
03-18-2017
3.50
Prep and skinning winglet (LH)
Details
03-12-2017
0.50
Clean up of spar caps
Details
03-11-2017
4.00
Outer spar caps
Details
03-10-2017
3.00
Inside spar caps
Details
03-09-2017
1.20
Clean up and prep for spar caps
Details
03-08-2017
1.00
Joining the lower sections
Details
03-07-2017
4.00
Winglet shear webs
Details
03-06-2017
2.00
Prepping for shear webs
Details
03-05-2017
2.00
Getting the most from the foam
Details
SITE NAVIGATION
Contact Builder
A-23 PROMETHEUS Home
Category
# Logs
# Hours
All
282
1377
Control
24
117
Design and Research
1
3
Firewall Forward
1
78
Fuel System
1
37
Fuselage
88
555
Interior
1
4
Jigs and Templates
14
44
Landing Gear
31
138
Misc Aircraft
1
0
Miscellaneous
5
109
Shop
6
10
Tools
4
13
Vertical Stabilizer
22
77
Wings
83
192
GN-1 Home
ME-10 BASTION Home
A-21 INTREPID Home
PA-38 Home
ME-1XL SKIMMER Home
Copyright © 2001-2024 Matronics. All Rights Reserved.