Powered By Kitlog Pro v2.0
Craigs RV-8 Web Site
RV-8
Fuel Tank
Work Logs Found:
23
Category Work Time:
60 Hours
Date
Hours
Work Log Summary
Details
04-10-2009
0.50
Pressure tested the left tank
Details
04-07-2009
3.00
Closed the left fuel tank
Details
04-06-2009
3.00
Riveted ribs in left fuel tank
Details
04-04-2009
1.00
Installed the fuel tank capacitive senders
Details
03-29-2009
2.00
Assembling and sealing the left tank
Details
03-27-2009
2.50
Completed preparation for left fuel tank
Details
03-26-2009
4.00
Prepped the left fuel tank
Details
03-24-2009
0.50
Pressure tested the right fuel tank
Details
03-21-2009
4.50
closed up right fuel tank
Details
03-08-2009
3.00
fuel tank anti hang up for flop tube
Details
03-07-2009
2.00
Right tank fuel gauge work
Details
03-06-2009
2.50
riveted right fuel tank
Details
03-05-2009
2.50
Riveting ribs into right fuel tank
Details
03-02-2009
1.00
Right fuel tank - Stiffeners
Details
03-01-2009
2.00
Right Fuel Tank
Details
02-27-2009
2.00
Dimpled the fuel tank skins
Details
02-22-2009
2.00
Fuel cap flange and drain
Details
02-20-2009
3.00
Access cover
Details
02-15-2009
3.50
Fabricated the T-405 attach angle
Details
02-14-2009
6.00
Capacitive fuel gauge senders
Details
02-12-2009
3.00
Fuel tank ribs and rear baffle
Details
02-11-2009
3.00
Fuel tank Ribs
Details
02-07-2009
4.00
Fuel tank baffles
Details
SITE NAVIGATION
RV-8 Home
Category
# Logs
# Hours
All
553
1476
Avionics
24
108
Canopy
20
81
Cowl
13
59
Electrical
3
5
Empennage
79
141
Engine
13
58
Engine Baffle
1
4
Firewall Forward
20
90
Fuel System
2
8
Fuel Tank
23
60
Fuselage
213
532
Fuselage Wiring
6
12
Induction system
4
16
Miscellaneous
3
12
None
1
Prop
6
27
Shop Supplies
1
3
Tools
5
11
Windscreen
2
2
Wings
114
247
Copyright © 2001-2024 Matronics. All Rights Reserved.