KitLog pro

Powered By Kitlog Pro v2.0

Craigs RV-8 Web Site
Work Logs Found: 23
Category Work Time: 60 Hours
 Date
Hours
Work Log Summary

Details

 04-10-2009
0.50
Pressure tested the left tank
Details

 04-07-2009
3.00
Closed the left fuel tank
Details

 04-06-2009
3.00
Riveted ribs in left fuel tank
Details
       

 04-04-2009
1.00
Installed the fuel tank capacitive senders
Details

 03-29-2009
2.00
Assembling and sealing the left tank
Details
       

 03-27-2009
2.50
Completed preparation for left fuel tank
Details
       

 03-26-2009
4.00
Prepped the left fuel tank
Details
       

 03-24-2009
0.50
Pressure tested the right fuel tank
Details
       

 03-21-2009
4.50
closed up right fuel tank
Details
       

 03-08-2009
3.00
fuel tank anti hang up for flop tube
Details
       

 03-07-2009
2.00
Right tank fuel gauge work
Details
       

 03-06-2009
2.50
riveted right fuel tank
Details
       

 03-05-2009
2.50
Riveting ribs into right fuel tank
Details
       

 03-02-2009
1.00
Right fuel tank - Stiffeners
Details
       

 03-01-2009
2.00
Right Fuel Tank
Details
       

 02-27-2009
2.00
Dimpled the fuel tank skins
Details
       

 02-22-2009
2.00
Fuel cap flange and drain
Details
       

 02-20-2009
3.00
Access cover
Details
       

 02-15-2009
3.50
Fabricated the T-405 attach angle
Details
       

 02-14-2009
6.00
Capacitive fuel gauge senders
Details
       

 02-12-2009
3.00
Fuel tank ribs and rear baffle
Details
       

 02-11-2009
3.00
Fuel tank Ribs
Details
       

 02-07-2009
4.00
Fuel tank baffles
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.