KitLog pro

Powered By Kitlog Pro v2.0

Waynes RV8 Project
Work Logs Found: 4
Category Work Time: 6 Hours
 Date
Hours
Work Log Summary

Details

 03-17-2010
1.00
Reinstalled elevators and checked movement

 03-05-2010
2.60
Preliminary check of elevator travel
Details

 03-04-2010
1.25
Installed rod end bearings

 10-31-2009
0.70
Snipped stiffeners and designated left and right










Copyright © 2001-2024 Matronics. All Rights Reserved.